June 2023 Quarterly Activities and Cashflow Reports
Released
Released
Announcement PDF
ASX RELEASE
28 July 2023
ASX Code: COD
QUARTERLY
ACTIVITIES REPORT
FOR THE QUARTER ENDED 30 JUNE 2023
HIGHLIGHTS
CONTENTS
1.0
Overview
2.0
Projects & Assets
2.1
Tenement
Schedule
2.2
Elizabeth Creek
Copper Project
Update
2.3
Cameron River
Exploration
Activities and
Results
2.4
Future Work
Programme
3
Corporate
3.1
Finance &
Use of Funds
4
Events
Subsequent to
Quarter End
Elizabeth Creek – Copper-Cobalt Project (South Australia)
- Building on the positive Scoping Study released at end of Q1 2023, which
demonstrated robust economics and a strong go-forward foundation, Coda
progressed multiple work streams to advance the Project during the quarter:
• Optimisation:
- Detailed optimisation in key mining and processing areas.
- Rebuild of the block model and advancement of underground mining studies.
- Completion of field-based test work on XRF ore sorting.
• Exploration- Copper-Cobalt
- Multiple new copper-cobalt targets identified adjacent to the Emmie Bluff deposit
following pivotal target generation work.
- Previously untested and unexplored 28km2 area immediately east of Emmie Bluff
identified as a priority focus for exploration. MT Survey commenced subsequent to
quarter-end.
• Elizabeth Creek – IOCG (South Australia)
- Advancement of tight-spaced forward gravity interpretation integrating all previous
and recently acquired IOCG related datasets to generate IOCG targeting vectors.
• Corporate
- Coda Minerals remains well-funded to continue to progress the Elizabeth Creek
Project with $4.7 million cash on hand as at 30 June 2023.
- Strategic partner discussions continued regarding the future development of
Elizabeth Creek.
• Upcoming Milestones
- 3D geologically constrained gravity inversion underway for Emmie IOCG with results
expected in Q3 2023. This is expected to generate new IOCG drill targets.
- Next phase study optimisation approved by the Board with ongoing work in
September Quarter to include:
o Large scale exploration and target generation proximal to Emmie Bluff.
o Ongoing flowsheet optimisation and XRF ore sorting study.
o Mechanical cutting underground mining study.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN: 49 625 763 957
1. Overview
Coda Minerals Chair, Keith Jones, said: “The Elizabeth Creek Copper Project Scoping Study1 published at the end of the
last quarter marked a huge milestone for Coda, marking the culmination of a significant body of work completed on the
Project since Coda listed on the ASX.
“The completion of the Scoping Study has provided an extremely strong foundation for advancing work on the coppercobalt Resources at Elizabeth Creek. Through this study, Coda’s team established a viable go-forward processing flowsheet
as well as mineability across all three deposits. This was especially important for the cornerstone Emmie Bluff deposit
where we now have a technically robust mining strategy using well-established underground mining methods.
“The technical foundation has given us the impetus to drive ongoing value improvement across three key horizons:
“We are focused on driving significantly increased value from optimising the underground mining at Emmie Bluff through
initiatives to reduce mining costs, increase mining selectivity of the mineralisation and further improve Resource
conversion to mineable tonnes.
“Secondly, we have defined multiple near-term targets to expand the Resource2, and commenced target generation3 over
an approximate 28km2 area immediately to the East of Emmie Bluff that is almost completely unconstrained by drilling.
Exploration success in this ‘near-mine’ environment would add significant overall value to Elizabeth Creek given its
proximity to the proposed mining and processing infrastructure.
“The third pillar of our strategy is to pursue a Tier-1 IOCG discovery. Our two current large scale geophysical programmes
when overlaid on the 23,000m of deep diamond drilling have dramatically improved our geological understanding of the
system at Emmie IOCG.
“The recent publication of an Exploration Target for the world-class Oak Dam West deposit by BHP, just 16 kilometres to
our north-east, provides a timely reminder of the size of the prize in this world-class province.
“With all four Gawler Craton IOCG deposits now in the hands of BHP, we are now very close to having next stage targets
and we are looking forward to advancing IOCG exploration.
“The September Quarter is expected to be a very busy one with multiple news-flow items expected including ongoing
results from optimisation studies and the completion of IOCG targeting.”
1
For full details, please see “Elizabeth Creek Copper-Cobalt Project Positive Scoping Study”, released to ASX on 23 March 2023.
For full details, please see “New Copper-Cobalt Drill Targets Defined at Emmie Bluff”, released to ASX on 4 July 2023.
3 For full details, please see “MT Survey Commences Targeting Emmie Bluff Extensions”, released to ASX on 25 July 2023.
2
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
2. Projects & Assets
2.1 Tenement Schedule
In accordance with ASX Listing Rule 5.3.3, Coda provides the following information about its tenements for the quarter ended 30 June 2023.
Table 1 Coda tenement schedule
Grant Date
Expiry Date
Area
km2
Ownership
Ownership Structure
SA
29 October 2017
28 October 2022 4
47
100%
Elizabeth Creek
SA
25 March 2020
24 March 2025
363
100%
EL6265
EPM27042
Elizabeth Creek
Cameron River
SA
Queensland
7 October 2018
10 October 2019
6 October 2023
9 October 2024
291
22.4
100%
51%5
EPM27053
Cameron River
Queensland
14 February 2020
13 February 2025
12.8
51%6
Tenements are held in a 70:30 split between Coda
Minerals and Torrens Mining Ltd, a wholly owned
subsidiary of Coda Minerals, resulting in effective
100% control by Coda Minerals.
Coda is currently engaged in a Farm-in to the
Cameron River project and has the option to earn
up to 80% ownership by spending $2 million. The
company has reached the threshold for 51%
ownership under the Agreement.
EL5455
EL7342
EL7584
EL9238
Club Terrace
Club Terrace
Club Terrace
Club Terrace
Victoria
Victoria
Victoria
NSW
19 August 2020
18 January 2021
22 October 2013
29 August 2022
29 August 2022
3 August 2021
21 October 2023
28 August 2027
28 August 2027
3 August 2027
8
375
108.5
260
100%
100%
100%
100%
EL7637
Balmoral
Victoria
17 June 2021
29 August 2022
28 August 2027
835
100%
EL2690
Rigo
Papua New
Guinea
26 January 2022
26 January 2024
1164
100%
ELA2022/00112
Booleroo
SA
14 November 2022
N/A (Under
review)7
N/A (Under
review)
202
N/A
Application made wholly by Coda Minerals.
ELA2557
Laloki
Papua New
Guinea
16 November 2017
N/A (refused)
N/A (refused)
126
N/A
Application by wholly owned subsidiary Torrens
Mining (PNG) Limited.
Tenement
Project
Location
EL6141
Elizabeth Creek
EL6518
Application Date
Held by wholly owned subsidiary Torrens Mining
Ltd
Held by wholly owned subsidiary Torrens Mining
Ltd
Held by wholly owned subsidiary Torrens Mining
(PNG) Limited
Under Application
4
Currently under renewal application
Note tenement transfer is ongoing as at current time
6 Note tenement transfer is ongoing as at current time
7 EL6917 (application ELA2022/00112) has been granted as of 26 July 2023, subsequent to quarter end.
5
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
2.2 Elizabeth Creek Copper-Cobalt Project Update
Elizabeth Creek Copper Cobalt Project Scoping Study
During the quarter, Coda carried out detailed optimisation in key areas from the successful Scoping Study in preparation
for progressing technical and economic studies.
XRF Ore Sorting
As ongoing optimisation of underground mining at Emmie Bluff, Coda carried out a programme of XRF core scanning
using proprietary equipment was undertaken on core collected both by Coda and historical explorers (as available from
the South Australian Drill Core Reference Library).
The key aim of XRF underground ore sorting is to allow for the addition of material at the edges of the current Production
Target within the underground mining plan. If successful, this may lead to a significant increase in the material within the
mine plan as well as higher grade material where working heights are below the current cut off.
The work completed forms part of an ongoing optimisation initiative to continue assessing the viability of ore sorting
using this method (as first outlined in the Elizabeth Creek Scoping Study). Preliminary results were received subsequent
to quarter-end, the company is awaiting final results.
Mechanical Underground Cutting Study
Coda continued to advance work to assess the viability of the application of mechanical underground cutting technology
to Emmie Bluff. The key aim of this work is to assess the application of continuous miner technology to reduce costs,
lower cut off grade, and extend mine life at Emmie Bluff. This may also be used in tandem with XRF sorting to materially
improve Resource to Production Target (mine plan) ratios.
The work has required a complete rebuild of the Resource block model for application to this mining method- this work
is now complete and is advancing to detailed mine planning and cost estimation phases.
Other Study Work
The Company has initiated long-duration baseline environmental studies which include climate and dust monitoring. This
important, long lead field work will provide baseline data for future approvals.
Coda has retained a highly experienced project manager to undertake a full scope, budget, and schedule for future studies
at Elizabeth Creek.
Finally, Coda is engaged in ongoing efforts to improve aspects of the project’s proposed metallurgical flowsheet as
described in the Elizabeth Creek Scoping Study, released last quarter.
Copper-Cobalt (Sedimentary) Exploration
With a strong technical basis for the existing Resources at Elizabeth Creek, Coda has undertaken significant exploration
proximal to the existing Resource at Emmie Bluff. It is expected that additional discovery may be suitable for inclusion in
the overall scope of the project; Coda has identified multiple targets close to Emmie Bluff as well as a vast area,
unexplored and unconstrained by drilling to the east of Emmie Bluff.
Coda completed analysis of the recently collected Ambient Noise Tomography (ANT) survey. The survey appeared to
show a major horst and graben feature which controlled (or was at least partially responsible for) the positioning of both
the Emmie IOCG deposit and the basin which hosts the shallower Emmie Bluff Mineral Resource. The survey also
appeared to demonstrate the capability to directly image Tapley Hill Formation shale (the Emmie Bluff host rock) and
revealed a number of potential targets beyond the main basin (See Figure 1) .
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Figure 1 Proposed drill hole locations and exploration rationales for exploration drilling at the Emmie Bluff deposit. Map is based on
results released to market on 20 April 20238 and extracted from a market release dated 4 July 20239.
IOCG Exploration
During the quarter, Coda undertook an extensive gravity survey consisting of 3,634 total stations covering an area of just
over 65 square kilometres, encompassing the Emmie IOCG prospect, the Emmie Bluff Mineral Resource and surrounding
IOCG and sediment hosted prospects.
The objective of the gravity survey was to improve the resolution of historical gravity surveys, bringing the entire prospect
area to a consistent 125m by 125m grid. The survey was carried out by DaishSat, the same company which previously
surveyed in the area in 2008, 2009 and 2011, allowing for easier integration with historical data.
The final levelled dataset was provided by Daishsat in April and is currently being interpreted in conjunction with other
geophysical datasets to generate a comprehensive, geologically constrained geophysical model of the Emmie Bluff and
Emmie IOCG deposits, as well as surrounding areas. This is expected to provide a detailed understanding of the overall
geology and in turn allow for precisely targeted drill holes, as well as identifying untested IOCG targets away from the
main Emmie IOCG area.
This dataset (along with recently completed ANT, drilling and other historical and recent geophysical datasets) has
provided the core data currently being utilised by external consultants to complete detailed geophysical modelling and
inversion of the Emmie Bluff and Emmie IOCG deposits, as well as the surrounding area.
The Company expects to complete what it anticipates will be the most comprehensive and accurate sub-surface
geological model of the area developed to date during the September Quarter. This updated and significantly enhanced
geological model will allow for precise targeting of IOCG drilling in particular and will also be valuable in undertaking
further sediment-hosted exploration.
8
For full details, including JORC Table 1, please see “ANT Survey Transforms Understanding of Emmie Bluff, IOCG”, released to market 20 April 2023
and available at https://www.codaminerals.com/wp-content/uploads/2023/04/20230420_COD_ANT-Survey-Transforms-Understanding-of-EmmieBluff-IOCG_Release.pdf
9
For full details, please see “New Copper-Cobalt Drill Targets Defined at Emmie Bluff”, released to the market on 4 July 2023 and available at
https://www.codaminerals.com/wp-content/uploads/2023/07/20230704_COD_ASX-ANN_New-Copper-Cobalt-Drill-Targets-Defined-at-EmmieBluff_VRelease.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
This project is well advanced as of the date of this report, with deliverables expected to be made available for peer review
in the coming weeks.
2.3 Cameron River
Project Review
An external consultant was commissioned to carry out a review of the Cameron River Project in the first quarter of the
year, with the aim of determining the next steps for exploration at the project. The results of this review were received
during the quarter, and the feedback is being reviewed by the Company to decide on next steps to be taken.
2.4 Future Work Programme
Elizabeth Creek Economic and Technical Studies
Coda is currently anticipating final reports regarding ongoing metallurgical optimisation testwork, XRF ore sorting test
work, and investigations into the practicality and economic value of mechanical cutting at Emmie Bluff, all of which are
expected during the September Quarter and all of which have the potential to materially impact the Project’s estimated
NPV if integrated into the Elizabeth Creek Copper-Cobalt Project Scoping Study. Coda will assess these reports and, if
warranted, consider their inclusion in future studies or iterations of existing studies.
Coda will also undertake preparation and seek approvals for drill testing targets identified by the ANT survey, as well as
any potential targets which may be supported or identified by the currently ongoing MT survey in the Emmie Bluff area.
This is expected to include heritage surveys and the completion of any warranted government approvals.
Emmie IOCG Geophysical Exploration
The Company is awaiting the outcome of a large scale ongoing geophysical analysis and peer review of all existing datasets
with applicability to IOCG targeting across the northern part of the tenure. Final reports will assist in making decisions
about drill target locations and are expected to result in the delineation of multiple new, high priority targets. Heritage
and other preparations will be undertaken as required in concert with other proposed drilling (see above)
3. Corporate
Finance & Use of Funds
The Company issued a Prospectus dated 4th September 2020 (and Supplementary Prospectus dated 18th September 2020)
with ASIC and ASX seeking to raise a total of $8.5 million before costs. The Company closed its heavily oversubscribed
Initial Public Offer on 29th September 2020. The Company was officially admitted on ASX on the 26th October 2020 and
commenced trading on the 28th of October 2020 under the ASX ticker COD.
In June 2021 the Company raised $14.4 million through a placement to institutional and sophisticated shareholders under
Coda’s Listing Rule 7.1 placement capacity resulting in the issuance of 12 million new shares. There were no special terms
or features attached to the shares on offer.
In November 2022 the Company raised $3.8 million through a placement to institutional and sophisticated shareholders
under Coda’s Listing Rules 7.1 and 7.1A placement capacity resulting in the issuance of 15.6 million new shares. There
were no special terms or features attached to the shares on offer. In February 2023, the Directors of the Company
received 1,341,667 shares in total raising an additional $322,000 under this placement, following shareholder approval
at the EGM on the 7th of February 2023.
The placement was managed by CPS Capital Group. In November 2022, CPS were issued 3,533,000 unquoted options in
the Company under the Company’s existing 15% Listing Rule 7.1 capacity with an exercise price of $0.36 per option and
a three-year expiry from the date of issue.
Pursuant to ASX Listing Rule 5.3.2, the Company confirms that there were no mining production and development
activities during the quarter by the Company.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Total cash outflow from operating activities for the quarter was $1.2 million. This included $0.5 million in exploration and
evaluation expenditure and interest received of $52k, with the remaining expenditure was attributed to corporate and
administration costs. Of the remaining expenditure, $69k was for Directors’ fees paid during the period (refer Appendix
5B 6.1).
Coda ended the June 2023 quarter with $4.7 million in cash and deposits.
4. Events Subsequent to Quarter-End
Coda has made material progress on multiple optimisation projects including the applicability of XRF ore sorting to the
Emmie Bluff deposit and ongoing efforts to improve the metallurgical flowsheet for the Elizabeth Creek Copper Cobalt
Project. Final reports from these work programmes remain pending and will be released to market as soon as possible.
In July 2023 Coda initiated a 61 station ground magnetotelluric survey immediately adjacent to the Emmie Bluff Mineral
Resource. This survey, which is designed to complement a similar historical survey completed in 2010, will assist in
defining the geometry of the basin which hosts Emmie Bluff, as well as identifying any potential similar extensional basins
in the highly prospective regions to the east and southeast of the existing Resource. The survey will also cover prospective
IOCG targets in the area.
Also in July, the Company was informed that the application process had formally commenced for a 73km2 package of
ground (ELA 2023/00034) immediately adjacent to the Elizabeth Creek Copper Cobalt Project. The Company considers
the ground prospective for sediment-hosted copper-cobalt deposits similar to the nearby MG14 and Windabout deposits.
Rock chip samples from Coda’s Club Terrace Project in Victoria were submitted for assay subsequent to quarter-end.
Results are expected to be received by mid-August.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
—
This announcement has been authorised for release by the Board of Coda Minerals Ltd
Further Information:
Chris Stevens
Chief Executive Officer
Coda Minerals Limited
info@codaminerals.com
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
About Coda Minerals
Coda Minerals Limited (ASX: COD) is focused on the discovery and development of minerals that are leveraged to the
global energy transformation through electrification and the adoption of renewable energy technologies.
Coda's flagship asset is the 100%-owned Elizabeth Creek Copper-Cobalt Project, located in the world-class Olympic
Copper Province in the Eastern Gawler Craton, South Australia’s most productive copper belt. Elizabeth Creek is centred
100km south of BHP’s Olympic Dam copper-gold-uranium mine, 15km from its new Oak Dam West Project and 50km
west of OZ Minerals’ Carrapateena copper-gold project.
Coda consolidated 100% ownership of the Elizabeth Creek Copper Project after completing the acquisition of its former
joint venture partner, Torrens Mining, in the first half of 2022.
In December 2021, Coda announced a maiden Indicated and Inferred Mineral Resource Estimate for the Emmie Bluff
copper-cobalt deposit at Elizabeth Creek comprising 43Mt @ 1.3% copper, 470ppm cobalt, 11g/t silver and 0.15% zinc
(1.84% CuEq) containing approximately 560kt copper, 20kt cobalt, 15.5Moz silver and 66kt zinc (800kt CuEq) 10.
Importantly, 92% of the contained metal is classified in the higher confidence ‘Indicated Resource’ category and is
available for use in mining studies.
Emmie Bluff is one of three known ‘Zambian-style’ copper-cobalt deposits at Elizabeth Creek, including JORC 2012
compliant Indicated Mineral Resources at the Windabout (18Mt @ 1.14% CuEq) and MG14 (1.8Mt @ 1.67% CuEq)
deposits11. Collectively, the three resources at Elizabeth Creek now host a total of 1.1 million tonnes of contained copper
equivalentError! Bookmark not defined.,Error! Bookmark not defined..
A scoping study into the development of these three deposits was released in March of 2023 demonstrated an
economically robust project with a 14 year mine life, capable of producing approximately 25,000 tonnes of copper and
1,000 tonnes of cobalt at steady state production levels. The project had a lifetime average AISC of USD $2.19/lb of Cu
(after by-product credits) and an approximately pre-tax NPV8 of $570M12.
Coda has also discovered a significant IOCG system adjacent to and below the Emmie Bluff target, with initial deep
diamond drilling in June 2021 intersecting 200m of intense IOCG alteration at the Emmie IOCG target, including
10 2021.12.20 - Standout 43Mt Maiden Cu-Co Resource at Emmie Bluff, Competent Person: Dr Michael Cunningham.
11 2020.10.26 - Confirmation Statements JORC, Competent Person: Tim Callaghan.
12 2023.03.23 – Elizabeth Creek Copper-Cobalt Project Scoping Study
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
approximately 50m of copper sulphide mineralisation 13. Since then, Coda has drilled 21 holes into Emmie IOCG, with all
but three returning significant widths of mineralisation, some over 3% copper and 0.5g/t gold 14.
Coda has a dual strategy for success at Elizabeth Creek. Firstly, it is working towards the next step in the development
process for it’s Zambian-style copper cobalt projects by advancing technical and economic studies to build on the results
of the recently released Scoping Study, while simultaneously undertaking exploration to further define and extend known
Zambian-style copper-cobalt resources across multiple prospects.
Secondly, it is undertaking a substantial geophysics programme at the Emmie IOCG prospect to further understand the
structures and extent of the geological model defined over the past year of drilling.
Coda also has a Farm-In and Joint Venture Agreement with Wilgus Investments Pty Ltd to acquire up to 80% ownership
of the Cameron River Copper-Gold Project, located in the highly prospective Mount Isa Inlier in Queensland. The Project
comprises 35km2 of copper and gold exploration tenure spanning two Exploration Permits (EPMs 27042 and 27053).
Through Torrens Mining acquisition, Coda also owns exploration tenements in Victoria, New South Wales and Papua New
Guinea.
13 2021.06.22 - Thick Zone of IOCG Mineralisation Intersected at Emmie Bluff Deeps, Competent Person: Mr Matthew
Weber.
14 2022.09.18 – Assays from IOCG Drilling Confirm Target Areas for Follow Up, Competent Person: Mr Matthew Weber.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Competent Persons’ Statements and Confirmatory Statement - Mineral Resource Estimates
Information regarding the MG14 and Windabout Mineral Resources is extracted from the report entitled “Confirmation
Statements JORC” created on 26th October 2020 and is available to view at https://www.codaminerals.com/wpcontent/uploads/2020/10/20201026_Coda_ASX-ANN_Confirmation-Statements-JORC.pdf.
Information regarding the Company’s MG14 and Windabout Mineral Resource Estimates is based on, and fairly
represents, information and supporting documentation compiled by Tim Callaghan, who is self-employed. Mr Callaghan
is a Member of the Australasian Institute of Mining and Metallurgy (“AusIMM”), and has a minimum of five years’
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (”JORC Code”). Mr Callaghan has consented to
the inclusion in this announcement of the matters based on his information in the form and context in which it appears.
Information regarding the Emmie Bluff Mineral Resource is extracted from the report entitled “Standout 43Mt Maiden
Cu-Co Resource at Emmie Bluff” created on 20th December 2021 and is available to view at
https://www.codaminerals.com/wp-content/uploads/2021/12/20211220_Coda_ASX-ANN_Standout-43Mt-Maiden-CuCo-Resource-at-Emmie-Bluff_RELEASE.pdf
Information regarding the Company’s Emmie Bluff Mineral Resource Estimates is based on, and fairly represents work
done by Dr Michael Cunningham of Sonny Consulting Services Pty Ltd. Dr Cunningham is a Member of the Australasian
Institute of Mining and Metallurgy and has sufficient relevant experience to the style of mineralisation and type of deposit
under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of
the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves.
Listing Rule 5.23.2
The Company confirms that it is not aware of any new information or data that materially affects the information included
in the original market announcements cited in this announcement and, in the case of estimates of Mineral Resources or
Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The Company confirms that the form and context in
which the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Statement Regarding Metal Equivalent Calculations
Metal Equivalent grades are quoted for one or more of the Emmie Bluff, Windabout and MG14 Mineral Resources, or for
exploration results considered by the company to be related directly to one of these Mineral Resources, in this
announcement.
For the Emmie Bluff Mineral Resource:
The Emmie Bluff Mineral Resource is reported as 43Mt @ 1.3% Cu, 470 ppm Co, 11 g/t Ag and 0.15% Zn (1.84% Copper
Equivalent (CuEq)) reported at a cut-off grade of 1% CuEq. The calculation of this metal equivalent is based on the
following assumptions.
Metal
Copper
Cobalt
Zinc
Silver
Coefficient
0.8
0.85
0.9
0.85
Forecast Price
$7,000
$55,000
$2,100
$18.50
Price Unit
USD/Tonne
USD/Tonne
USD/Tonne
USD/Oz
Price assumptions used when calculating copper equivalent grades were based primarily on Consensus Economics
forecasts of metals, except for Cobalt, which was sourced via communication with subject matter experts. Metallurgical
assumptions used when calculating copper equivalent grades were based on a simple bulk float utilising rougher and
minimal cleaner/scavenger circuits. The produced a reasonably consistent mean recovery across most metals of between
approximately 83 and 94 percent. For simplicity, and to in part account for losses associated with less intensive cleaner
floats and losses to the hydromet plant, these figures were rounded down to the nearest 5%.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝑢𝐸𝑞% = 𝐶𝑢% + 0.00068 × 𝐶𝑜 𝑝𝑝𝑚 + 0.337 × 𝑍𝑛 % + 90.3 ×
𝐴𝑔 𝑝𝑝𝑚
10000
For the Windabout and MG14 Mineral Resource:
The Windabout and MG14 Mineral Resource are reported at a cut-off grade of 0.5% CuEq as:
•
•
Windabout: 17.67Mt @ 0.77% Cu, 492 ppm Co and 8 g/t Ag (1.41% CuEq)
MG14: 1.83Mt @ 1.24% Cu, 334 ppm Co and 14 g/t Ag (1.84% CuEq)
The calculation of this metal equivalent is based on the following assumptions.
Metal
Copper
Cobalt
Mining
Recovery %
0.9
0.9
Dilution %
Recovery %
Payability %
Forecast Price
Price Unit
0.05
0.05
0.6
0.85
0.7
0.75
$6,600
$55,000
USD/Tonne
USD/Tonne
Price assumptions used when calculating copper equivalent grades were based on recent historical metal prices at the
time of calculation (2018). Metallurgical assumptions are based on extensive metallurgical testwork undertaken on the
two deposits to 2018 across various potential flowsheets involving both floatation and leaching. Ag analyses in the
estimation and metallurgical testwork were considered insufficient at the time to include in the metal equivalent
calculation.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝑢𝐸𝑞% = 𝐶𝑢% + 0.0012 × 𝐶𝑜 𝑝𝑝𝑚
It is the opinion of the company that both sets of prices used in the calculations are reasonable to conservative long-term
forecasts for real dollar metal prices during the years most relevant to the deposits (approx. 2026-2030).
It is the opinion of the company that all o