Test Work Delivers Elizabeth Creek Flowsheet Enhancements
Released
Released
Announcement PDF
ELIZABETH CREEK
2023X
ASX RELEASE
Code: COD
4 September 2023
ASX Code: COD
Test Work Delivers Elizabeth Creek Flowsheet Enhancements
Copper recovery boosted by +40% from the MG14 deposit using low-cost tails leaching, with potential
applicability to other deposits included in the March 2023 Scoping Study
Highlights
•
Ongoing metallurgical optimisation at the Elizabeth Creek Copper Project has demonstrated the potential to reduce
forecast processing costs and improve copper recoveries.
•
Improvement in forecast net copper recovery for the MG14 open pit deposit from 58% to 85% achieved through
the application of tails leaching.
•
Flotation optimisation tests suggest the potential to further reduce reagent costs without materially decreasing
recovery.
•
Flowsheet enhancements represent the first of several optimisation options currently being explored by Coda, with
the potential to materially improve the economic potential of the Elizabeth Creek Project. These include mechanical
cutting studies, ore sorting and other processing enhancements.
Coda Minerals Limited (ASX: COD, “Coda”, or “the Company”) is pleased to report highly encouraging initial outcomes
from ongoing enhancement initiatives being undertaken on its 100%-owned Elizabeth Creek Copper Project in South
Australia, building on the positive Scoping Study outcomes delivered in March 2023.
The results reported today relate to recently completed metallurgical test work on material from MG14, one of the open
pit deposits at Elizabeth Creek. Coda has completed a series of metallurgical tests to assess the amenability of flotation
tails to leaching, as well as a separate set of tests to reduce reagent consumption during flotation. These tests were
designed to improve project economics by reducing costs associated with flotation and to increase copper recoveries and
associated revenue through leaching. Both sets of tests were successful:
1
2
•
Tails Leaching: Using the most practical of the tested lixiviants1, the recovery of copper from tails was 65.4%.
Combined with flotation recovery, this resulted in an overall recovery boost from 57.9% 2 of copper to 85.4%. The
MG14 flotation tails stream at Elizabeth Creek has a copper grade in excess of 0.6% Cu. This stream represents a
potentially significant source of value that can be tapped using low-cost leaching methods. Additional copper
production by these means has the potential to be highly value accretive, particularly in the forecast supplyconstrained copper price environment.
•
Flotation Optimisation: No material reduction in copper recovery was identified when concentrations of flotation
reagents were reduced, or lower cost chemicals were substituted in the process. This suggests that flotation can
likely be carried out at Elizabeth Creek at a lower cost than was assumed in the Scoping Study without compromising
recovery, improving overall project economics.
A combination of 5kg/t cyanide and 15 kg/t glycine
For full details, please see the Elizabeth Creek Copper Cobalt Project Scoping Study, released to the ASX on 23 March 2023, and available here
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
Discussing the new results, Coda’s CEO Chris Stevens said: “When we released the Elizabeth Creek Copper-Cobalt Project
Scoping Study earlier this year, we saw those results not as our final statement on the Project’s economics but as a starting
point for further optimisation.
“Since then, we have been continuously assessing opportunities to refine and improve our development plans. Optimising
flotation reagents and particularly capturing value through tails leaching as a solution to the flotation recovery challenges
were obvious first steps. Additional copper recovery means more revenue and more exposure to copper’s anticipated future
trajectory – which we see as a strong positive for this project.
“The Coda technical team is very familiar with glycine and its potential application at Elizabeth Creek, having undertaken
numerous studies into the technique over the years. We are confident in the recyclability of the glycine for example, as well
as in its practicality and stability in a production environment.
“With the fundamental science now confirmed, our next step will be further optimisation of the lixiviant mix and to undertake
detailed economic assessments to assess the impact on project economics. .
The Scoping Study released in March 2023 demonstrated strongly positive economics for the project based on conservative
forward commodity price assumptions. We are now focused on driving material enhancements to project economics through
multiple enhancements, including the incorporation of mechanical cutting, ore sorting and mine schedule optimisation. We
expect to put these all together into a study update shortly.
“In addition to the study optimisation work we are now in the final reporting stages of our IOCG targeting work and look
forward to updating the marketing on next stage plans this month”
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Detailed Technical Information
ELIZABETH CREEK
Tails Leach
A total of six bottle roll tests were carried out on flotation tailings from the MG14 deposit, followed by 2 bottle roll tests on
a more representative combined slimes and tails mix. The recovery of copper to concentrate at MG14 is 57.9%, with the
remainder reporting to the tails stream, which had a head grade of 0.43% Cu. Follow-up tests were undertaken on combined
slimes and tails, which were blended at a ratio of approximately 80% Tails : 20% Slimes to mimic material generated during
production. The resultant feed had a head grade of 0.54% Cu (See Table 1).
Table 1 MG14 Tails stream assays
MG14 Tails Grade
MG14 Combined
Slimes/Tails Grade
Ag (g/t)
6
Al (%)
3.03
Co (ppm)
105
Cu (ppm)
4225
Fe (%)
10.8
S (%)
0.24
Si (%)
19.8
Zn (ppm)
525
7.3
3.79
130
5429
9.5
0.25
19.7
515
A significant percentage of the copper remaining in this stream is believed to be oxide or silicate copper, which is largely
unavailable to flotation, but may be available to leaching under certain conditions. Historical testwork has demonstrated
that cobalt is particularly difficult to leach with these lixiviants but given the very high recovery of cobalt to concentrate
(>85% at MG14), leach recovery of cobalt was not prioritised.
The bottle rolls tested a variety of principally alkaline or neutral lixiviants to avoid acid consumption given the dolomitic
component of the host shale. The concentrations and results are summarised below as Table 2 and Table 3 respectively.
The majority of tests were “sighter” tests, where lixiviant concentrations were deliberately overdosed to ensure that lixiviant
concentration was not a limiting factor. Sample JR008 was an exception to this rule, with a more realistic lixiviant mix tested,
with concentrations based on earlier, more comprehensive testwork undertaken on tailings from the Emmie Bluff deposit). 3
This mix and the lower cyanide concentration was then carried into tests 9 and 10.
Table 2 Lixiviant regimes of all bottle roll tests undertaken on MG14 Slimes and Tails
100
5
5
5
15
15
10
10
10
Ammonia
380
Lime
640
150
E: info@codaminerals.com
ABN 49 625 763 957
523.5
50
See Appendix 1
6 Altona Street
West Perth
Western Australia, 6005
100
Glycine
3
1,000
Sodium
Hypochlorite
Cyanide
50
Hydrochloric
Acid
Sodium
Hydroxide
70
Sodium Sulfite
Lixiviant
Cyanide
Reducing Acid
Hypochlorite
Glycine & Cyanide
Ammonia
Glycine & Cyanide
Glycine & Cyanide
Cyanide
Ferrous Sulfate
Sample Type
Tails
Tails
Tails
Tails
Tails
Tails
Slimes/Tails
Slimes/Tails
Sulfuric Acid
Test/Sample ID
JR002
JR003
JR004
JR005
JR006
JR008
JR009
JR010
1,000
Table 3 Lixiviant regimes of all bottle roll tests undertaken on MG14 Tails and Slimes
ELIZABETH CREEK
Sample Type
JR002 FINAL
JR003 FINAL
JR004 FINAL
JR005 FINAL
JR006 FINAL
JR008 FINAL
JR009 FINAL
JR010 FINAL
Tails
Tails
Tails
Tails
Tails
Tails
Slimes/Tails
Slimes/Tails
Lixiviant
Cyanide
Reducing Acid
Hypochlorite
Glycine & Cyanide
Ammonia
Glycine & Cyanide
Glycine & Cyanide
Cyanide
Ag %
82.5%
33.6%
0.0%
70.7%
21.5%
12.0%
25.1%
0.0%
Extraction (Products)
Cu (%)
Co (%)
90.0%
0.0%
52.6%
0.0%
74.0%
0.0%
82.8%
0.0%
37.6%
0.0%
67.7%
0.0%
65.4%
15.4%
33.5%
12.7%
Net Cu recovery
Zn (%)
0.0%
40.1%
0.0%
0.0%
0.0%
0.0%
1.8%
0.0%
Assumes 57.9% recovery to float
95.8%
80.0%
89.1%
92.8%
73.7%
86.4%
85.4%
72.0%
Implications for Project Economics
Coda was able to achieve a copper recovery of 58% for the MG14 deposit despite the challenging flotation characteristics
of the ore. In addition to the sulphide component, mineralisation at MG14 is hosted in part as copper silicates and oxides,
partially as a result of weathering at the relatively shallow deposit. While these same characteristics make the ore
challenging to float, they also make the tails and slimes particularly well suited to leaching using benign lixiviants such as
glycine.
Given leach recovery rates in the recently completed test work, net copper recovery at MG14 could be expected to increase
from 57.9% to 85.4%. Estimates of CAPEX and OPEX required to achieve this are pending and, if viable, tails leaching may
be integrated into the Enhanced Scoping Study for the Elizabeth Creek Copper Project.
Additional work may be needed to refine the lixiviant mix and to assess the viability of tails leaching at Windabout. Test
work completed in 2022 suggested a comparable or better copper and silver extraction from Emmie Bluff tails 4 using similar
lixiviants as well as various methods such as resin-in-leach and additional grinding, which may allow for further extraction
of copper or by-products.
About Glycine Leaching Technology
Glycine leaching is a patented process owned by Draslovka Mining Process Solutions and licensed to Coda Minerals. The
technique makes use of glycine as a benign, recyclable lixiviant to leach base and precious metals as a supplement to or
replacement for cyanide leaching in alkaline environments.
4
See Appendix 1
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Flotation
•
•
•
Reducing Cyquest (a slimes dispersant) by 50%
Reducing PAX (potassium amyl xanthate, a collector) by approximately 40%; and
Substituting PAX for SIBX (sodium isobutyl xanthate, a lower cost collector compared to PAX)
All tests included six rougher stages and lasted for a consistent 33 minutes. The results are summarised below as Figure 1
and Figure 2, below.
Baseline
250g/t Cyquest
200g/t PAX
SiBX
7
6
5
Cu Grade (%)
ELIZABETH CREEK
A series of rougher flotation tests were carried out on material from the Windabout deposit to begin the process of
optimisation of flotation conditions, specifically to decrease costs associated with reagent consumption. In addition to a
standard baseline test, three variant tests were carried out:
4
3
2
1
0
40.0
45.0
50.0
55.0
60.0
65.0
70.0
75.0
80.0
Cu Recovery (%)
Figure 1 Copper recovery from rougher flotation test work on Windabout composite samples. Flotation samples collected
at 5, 10, 15, 20, 30 and 33 minutes.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Baseline
250g/t Cyquest
200g/t PAX
SiBX
0.50
0.45
0.35
Co Grade (%)
ELIZABETH CREEK
0.40
0.30
0.25
0.20
0.15
0.10
0.05
0.00
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
Co Recovery (%)
Figure 2 Cobalt recovery from rougher flotation test work on Windabout composite samples. Flotation samples collected at
5, 10, 15, 20, 30 and 33 minutes.
Implications for Project Economics
The testing shows no material change in copper or cobalt grade or final recovery for the lower cost reagent regimes relative
to the baseline, with the variations after 33 minutes generally being within the margin of error expected for single tests.
This suggests that the application of a lower cost reagent regime to flotation at Elizabeth Creek will not reduce recovery or
revenue, allowing for potential improvements to project economics. Further testing will be undertaken during the PFS to
confirm this and further optimise the flotation reagent regime and reduce OPEX.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Update to Scoping Study
ELIZABETH CREEK
In addition to the work reported in this announcement, Coda is currently pursuing a number of avenues to enhance its
recent Scoping Study into the Elizabeth Creek Copper-Cobalt Project. These include large and small changes which
collectively have the potential to significantly improve the Project’s expected economic outcomes. Key initiatives include:
•
Mechanical Cutting at Emmie Bluff: Coda is investigating the technical and economic feasibility of mechanical cutting
using continuous miners at Emmie Bluff. This is a low-cost mining method which is potentially viable due to the soft
and minimally abrasive nature of the black shale host rock at Emmie Bluff. Technical assessment has been completed,
with final mine design and CAPEX/OPEX estimates currently ongoing. This technology has step-change potential for
project economics and, if successful, will form the core of any near-term updates to the Scoping Study.
•
Ore Sorting: The company has received preliminary reports from simulations following a major data collection
exercise utilising an XRF scanner mimicking the sensors utilised in full scale ore sorters. By removing low grade
material before it is crushed and ground, the Company can improve the grade of mill feed and potentially exploit
narrower seams which would otherwise be diluted below cut-off grades, potentially expanding the exploitable
fraction of the Mineral Resource. A final report is pending and it is anticipated that results will be released to the
market in the coming weeks.
•
Process Refining: In addition to the information reported in this announcement, the company is continuing efforts
to refine its processing flowsheet and material inputs. Adjustments to CAPEX and OPEX to accept locally produced
dolomite in place of purchased limestone as an acid neutraliser are ongoing and any associated savings will be
integrated into future Scoping Study updates.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Appendix 1 – Emmie Bluff Tails Leach Test Work
ELIZABETH CREEK
In 2022, Coda undertook tails leach test work with Mining Process Solutions (MPS) to assess the applicability of glycine leach
technology to Emmie Bluff tails. Emmie Bluff tails are lower grade than MG14 tails, with a head grade of 0.27% Cu and 2.7
g/t Ag.
A series of 20 diagnostic leach tests (DLTs) were carried out to optimise the lixiviant mix with and without the use of resin
and with or without additional grinding. The results are summarised as Figure 3.
Figure 3 DLTs undertaken on tails from Emmie Bluff. Tests 1-6 were without resin and Tests 7-20 with resins to adsorb any
leached metal, releasing the glycine to perform more leaching. Tests 1-12 were tests on as received while from Tests 13-20
all samples were ground for 5 minutes.
Two tests (9 and 15) were undertaken at the same reagent concentrations as the testwork undertaken on MG14 tails. Both
were undertaken I the presence of resin, which was not used in the MG14 testwork. Recoveries of 58.3% Cu and 52.8% Ag
were achieved for unground sample, which improved to 72.1% Cu and 68% Ag if the tails were subjected to an additional 5
minutes of grinding. Copper recoveries improved if the material was acid cured in advance, but this appeared to have a
minor negative effect of silver recovery (test 18).
On the basis of these tests, three reactor leach test were undertaken over 48 hours, all in the presence of resin and all
utilising additional grinding. The results are summarised as Figure 4.
The reactor leach tests showed mixed results, with slight reductions in copper recovery and typically slight improvements
in silver relative to the most directly comparable DLTs.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
Figure 4 Reactor leach test results for material following grinding to P80 30 microns. All tests were run in the presence of
resin (RIL) to adsorb any leached metal onto the resin releasing the glycine to perform more leaching. All tests were
conducted at pH 10, at 40% solids in Perth tap water for 48 hours.
Economic Implications
The results from the 2022 work on Emmie Bluff tails show overall lower copper recovery and better silver recovery than
those from MG14. This is likely explained by a combination of the presence of resin and the finer grinding in some of the
Emmie Bluff tests, and a different mineralogy at MG14, which includes a higher proportion of copper in oxides and silicates
than the relatively “cleaner” and less weathered Emmie Bluff ore. The improvements to recovery do suggest that leaching
test work at MG14 should be carried out using finer ground tails and in the presence of resin to attempt to improve silver
recovery in particular.
Given the better copper recovery to flotation concentrate at Emmie Bluff 5 relative to MG14 and the better copper recovery
from tails leach at MG14, Coda does not consider tails leach at Emmie Bluff a priority, though it is possible that parts of the
deposit may have different mineralogies and flotation characteristics more amenable to tails leach. If so, it is anticipated
that this will be identified during geometallurgical domaining work during a planned Pre-Feasibility Study drill out.
5 Estimated to be 77.2% in the Elizabeth Creek Copper Cobalt Project Scoping Study, released March 2023.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
-
ELIZABETH CREEK
This announcement has been authorised for release by the Board of Coda Minerals Ltd
Further Information:
Chris Stevens
Chief Executive Officer
Coda Minerals Limited
info@codaminerals.com
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
Competent Person’s Statement
The information in this report which relates to metallurgical results is based on information compiled by Mr. Neil
Ireland, who is an employee of Strategic Metallurgy, a metallurgical consultancy engaged by Coda Minerals. Mr Ireland
is a Member of the Australian Institute of Mining and Metallurgy and has sufficient relevant experience to the style of
metallurgical test work under consideration and interpretation thereof, and to the activities undertaken, to qualify as
a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Ireland consents to the inclusion in this
report of the matters based on the information compiled by him, in the form and context in which it appears.
About Coda Minerals
Coda Minerals Limited (ASX: COD) is focused on the discovery and development of minerals that are leveraged to the
global energy transformation through electrification and the adoption of renewable energy technologies.
Coda's flagship asset is the 100%-owned Elizabeth Creek Copper-Cobalt Project, located in the world-class Olympic
Copper Province in the Eastern Gawler Craton, South Australia’s most productive copper belt. Elizabeth Creek is centred
100km south of BHP’s Olympic Dam copper-gold-uranium mine, 15km from its new Oak Dam West Project and 50km
west of OZ Minerals’ Carrapateena copper-gold project.
Coda consolidated 100% ownership of the Elizabeth Creek Copper Project after completing the acquisition of its former
joint venture partner, Torrens Mining, in the first half of 2022.
In December 2021, Coda announced a maiden Indicated and Inferred Mineral Resource Estimate for the Emmie Bluff
copper-cobalt deposit at Elizabeth Creek comprising 43Mt @ 1.3% copper, 470ppm cobalt, 11g/t silver and 0.15% zinc
(1.84% CuEq) containing approximately 560kt copper, 20kt cobalt, 15.5Moz silver and 66kt zinc (800kt CuEq) 6.
Importantly, 92% of the contained metal is classified in the higher confidence ‘Indicated Resource’ category and is
available for use in mining studies.
Emmie Bluff is one of three known ‘Zambian-style’ copper-cobalt deposits at Elizabeth Creek, including JORC 2012
compliant Indicated Mineral Resources at the Windabout (18Mt @ 1.14% CuEq) and MG14 (1.8Mt @ 1.67% CuEq)
6 2021.12.20 - Standout 43Mt Maiden Cu-Co Resource at Emmie Bluff, Competent Person: Dr Michael Cunningham.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
deposits7. Collectively, the three resources at Elizabeth Creek now host a total of 1.1 million tonnes of contained copper
equivalentError! Bookmark not defined.,Error! Bookmark not defined..
ELIZABETH CREEK
A scoping study into the development of these three deposits was released in March of 2023 demonstrated an
economically robust project with a 14 year mine life, capable of producing approximately 25,000 tonnes of copper and
1,000 tonnes of cobalt at steady state production levels. The project had a lifetime average AISC of USD $2.19/lb of Cu
(after by-product credits) and an approximately pre-tax NPV8 of $570M8.
Coda has also discovered a significant IOCG system adjacent to and below the Emmie Bluff target, with initial deep
diamond drilling in June 2021 intersecting 200m of intense IOCG alteration at the Emmie IOCG target, including
approximately 50m of copper sulphide mineralisation 9. Since then, Coda has drilled 21 holes into Emmie IOCG, with all
but three returning significant widths of mineralisation, some over 3% copper and 0.5g/t gold 10.
Coda has a dual strategy for success at Elizabeth Creek. Firstly, it is working towards the next step in the development
process for it’s Zambian-style copper cobalt projects by advancing a Pre-Feasibilty Study to build on the results of the
recently released Scoping Study, while simultaneously undertaking exploration to further define and extend known
Zambian-style copper-cobalt resources across multiple prospects.
Secondly, it is undertaking a substantial geophysics programme at the Emmie IOCG prospect to further understand the
structures and extent of the geological model defined over the past year of drilling.
Coda also has a Farm-In and Joint Venture Agreement with Wilgus Investments Pty Ltd to acquire up to 80% ownership
of the Cameron River Copper-Gold Project, located in the highly prospective Mount Isa Inlier in Queensland. The Project
comprises 35km2 of copper and gold exploration tenure spanning two Exploration Permits (EPMs 27042 and 27053).
Through Torrens Mining acquisition, Coda also owns exploration tenements in Victoria, New South Wales and Papua
New Guinea.
7 2020.10.26 - Confirmation Statements JORC, Competent Person: Tim Callaghan.
8 2023.03.23 – Elizabeth Creek Copper-Cobalt Project Scoping Study
9 2021.06.22 - Thick Zone of IOCG Mineralisation Intersected at Emmie Bluff Deeps, Competent Person: Mr Matthew Weber.
10 2022.08.18 – Assays from IOCG Drilling Confirm Target Areas for Follow Up, Competent Person: Mr Matthew Weber.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Competent Persons’ Statements and Confirmatory Statement - Mineral Resource Estimates
ELIZABETH CREEK
Information regarding the MG14 and Windabout Mineral Resources is extracted from the report entitled “Confirmation
Statements JORC” created on 26th October 2020 and is available to view at https://www.codaminerals.com/wpcontent/uploads/2020/10/20201026_Coda_ASX-ANN_Confirmation-Statements-JORC.pdf
Information regarding the Company’s MG14 and Windabout Mineral Resource Estimates is based on, and fairly
represents, information and supporting documentation compiled by Tim Callaghan, who is self-employed. Mr Callaghan
is a Member of the Australasian Institute of Mining and Metallurgy (“AusIMM”), and has a minimum of five years’
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (”JORC Code”). Mr Callaghan has consented to
the inclusion in this announcement of the matters based on his information in the form and context in which it appears.
Information regarding the Emmie Bluff Mineral Resource is extracted from the report entitled “Standout 43Mt Maiden
Cu-Co Resource at Emmie Bluff” created on 20th December 2021 and is available to view at
https://www.codaminerals.com/wp-content/uploads/2021/12/20211220_Coda_ASX-ANN_Standout-43Mt-MaidenCu-Co-Resource-at-Emmie-Bluff_RELEASE.pdf
Information regarding the Company’s Emmie Bluff Mineral Resource Estimates is based on, and fairly represents work
done by Dr Michael Cunningham of Sonny Consulting Services Pty Ltd. Dr Cunningham is a Member of the Australasian
Institute of Mining and Metallurgy and has sufficient relevant experience to the style of mineralisation and type of
deposit under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012
Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.
Listing Rule 5.23.2
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements cited in this announcement and, in the case of estimates of Mineral
Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcement continue to apply and have not materially changed. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcement.
Statement Regarding Metal Equivalent Calculations
Metal Equivalent grades are quoted for one or more of the Emmie Bluff, Windabout and MG14 Mineral Resources, or
for exploration results considered by the company to be related directly to one of these Mineral Resources, in this
announcement.
For the Emmie Bluff Mineral Resource:
The Emmie Bluff Mineral Resource is reported as 43Mt @ 1.3% Cu, 470 ppm Co, 11 g/t Ag and 0.15% Zn (1.84% Copper
Equivalent (CuEq)) reported at a cut-off grade of 1% CuEq. The calculation of this metal equivalent is based on the
following assumptions.
Metal
Copper
Cobalt
Zinc
Silver
Coefficient
0.8
0.85
0.9
0.85
Forecast Price
$7,000
$55,000
$2,100
$18.50
Price Unit
USD/Tonne
USD/Tonne
USD/Tonne
USD/Oz
Price assumptions used when calculating copper equivalent grades were based primarily on Consensus Economics
forecasts of metals, except for Cobalt, which was sourced via communication with subject matter experts. Metallurgical
assumptions used when calculating copper equivalent grades were based on a simple bulk float utilising rougher and
minimal cleaner/scavenger circuits. The produced a reasonably consistent mean recovery across most metals of
between approximately 83 and 94 percent. For simplicity, and to in part account for losses associated with less intensive
cleaner floats and losses to the hydromet plant, these figures were rounded down to the nearest 5%.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Application of these assumptions resulted in the following calculation of CuEq:
ELIZABETH CREEK
𝐶𝑢𝐸𝑞% = 𝐶𝑢% + 0.00068 × 𝐶𝑜 𝑝𝑝𝑚 + 0.337 × 𝑍𝑛 % + 90.3 ×
𝐴𝑔 𝑝𝑝𝑚
10000
For the Windabout and MG14 Mineral Resource:
The Windabout and MG14 Mineral Resource are reported at a cut-off grade of 0.5% CuEq as:
• Windabout: 17.67Mt @ 0.77% Cu, 492 ppm Co and 8 g/t Ag (1.41% CuEq)
• MG14: 1.83Mt @ 1.24% Cu, 334 ppm Co and 14 g/t Ag (1.84% CuEq)
The calculation of this metal equivalent is based on the following assumptions.
Metal
Copper
Cobalt
Mining
Recovery %
0.9
0.9
Dilution %
Recovery %
Payability %
Forecast Price
Price Unit
0.05
0.05
0.6
0.85
0.7
0.75
$6,600
$55,000
USD/Tonne
USD/Tonne
Price assumptions used when calculating copper equivalent grades were based on recent historical metal prices at the
time of calculation (2018). Metallurgical assumptions are based on extensive metallurgical testwork undertaken on the
two deposits to 2018 across various potential flowsheets involving both floatation and leaching. Ag analyses in the
estimation and metallurgical testwork were considered insufficient at the time to include in the metal equivalent
calculation.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝑢𝐸𝑞% = 𝐶𝑢% + 0.0012 × 𝐶𝑜 𝑝𝑝𝑚
It is the opinion of the company that both sets of prices used in the calculations are reasonable to conservative longterm forecasts for real dollar metal prices during the years most relevant to the deposits (approx. 2026-2030).
It is the opinion of the company that all of the elements included in the metal equivalent calculations have a reasonable
potential to be recovered and sold.
For full details of the Emmie Bluff Metal Equivalent calculation, please see “Standout 43Mt Maiden Cu-Co Resource at
Emmie Bluff”, released to the ASX on 20th December 2021 and available at https://www.codaminerals.com/wpcontent/uploads/2021/12/20211220_Coda_ASX-ANN_Standout-43Mt-Maiden-Cu-Co-Resource-at-EmmieBluff_RELEASE.pdf.
For full details of the MG14/Windabout Metal Equivalent Calculation, please see “Confirmation of Exploration Target
& Mineral Resource and Ore Reserve Statement”, released to the ASX on 23 rd October 2020 and available at
ht
Share your feedback