Key Approvals Milestone Achieved at Elizabeth Creek
Submission of Draft Scoping Report to the South Australian Department of Energy and Mining (DEM) marks a
significant step in the project approvals pathway.
Highlights
•
Coda has submitted the Draft Scoping Report for its flagship Elizabeth Creek Copper-Cobalt Project to the South
Australian Department for Energy and Mining (DEM), marking a significant milestone in the project's approvals
process.
•
The Scoping document represents a key component of the South Australian approvals process and defines the
project specific scope of environmental studies and data collection required prior to the grant of a Mining Lease in
South Australia.
•
Following review and acceptance by the South Australian Government, the Final Scoping Report will form an
agreement between Coda and the State, securing a fixed, transparent pathway to project approvals.
•
The Elizabeth Creek Copper-Cobalt Project is an advanced post-Scoping Study stage copper development project1
with over 1 million tonnes of contained copper-equivalent in JORC Compliant Resources2.
Coda Minerals Limited (ASX: COD, “Coda”, or “the Company”) is pleased to advise that it has achieved a significant milestone
in the environmental approvals process for its 100%-owned Elizabeth Creek Copper-Cobalt Project in South Australia with
the submission of its Scoping Report to the South Australian Department of Energy and Mining (SA DEM).
This report defines the project specific environmental studies and associated work plans “Scope” for Elizabeth Creek and
provides a clear and transparent pathway for the Company to secure the State approvals required for the grant of a Mining
Lease. Once accepted and finalised by the South Australian Government, this binding agreement will materially reduce
uncertainty and risks associated with the approvals pathway for Elizabeth Creek.
Coda CEO Chris Stevens said: “Elizabeth Creek benefits from a rare combination of favourable geology, proximity to
infrastructure and existing operations, and location within a world-class mining jurisdiction. South Australia not only offers
low sovereign risk, but also a proactive and experienced regulator for new mining projects.
“In 2017, the South Australian State Government set an ambitious target of producing one million tonnes of copper annually
within 20 years. Programmes like the Approvals Scoping Process are a key part of streamlining the approvals process to help
new copper projects like Elizabeth Creek contribute to that goal.
1
For full details of the most recent public study, please see the December 2024 update to the Scoping Study here:
https://www.codaminerals.com/wp-content/uploads/2024/12/20241203_Coda_ANN_New-Resources-Higher-Recoveries-Boost-Elizabeth-CreekValue_VRelease.pdf
2 Please see Appendix 1 for links to full Resource Statements, Confirmatory Statements and Copper Equivalent grade calculations.
6 Altona Street, West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
“South Australia’s clear and efficient approvals framework should give confidence to our investors that Elizabeth Creek won’t
be delayed by unnecessary red or green tape, as is often the case in other jurisdictions. While sometimes underappreciated
by the market, this certainty is critically important.
“As we mark this key milestone in the approvals process, our technical team remains focused on advancing metallurgical
testwork following the recent release of our whole-ore leaching flowsheet3. Building on this significant breakthrough,
optimisation work and detailed OPEX and CAPEX estimates are now progressing well, with results expected in the coming
weeks.”
About the Approvals Scoping Process
Scoping is a new, non-mandatory process designed by the DEM as a replacement for informal pre-lodgement consultation
to streamline the approvals process. This is a separate process from a traditional Scoping Study, which is a preliminary
assessment of a project’s economics, usually followed up by a Pre-Feasibility Study.
The SA DEM defines Scoping as:
“…an activity undertaken by a mining company on an area of interest during the initial stage of a proposed mining operation
to identify environmental and social characteristics that may influence the operation.
It is the initial step for proponents who intend to apply for a tenement. The early identification of potential issues helps
proponents prepare for their tenement application, which includes an environmental impact assessment (EIA).”
•
•
•
•
•
•
Allows applicants to avoid duplicated efforts to ensure operations are not delayed by the need for variations and
re-work.
Supports early stakeholder engagement and transparency with the community.
Streamlines the tenement application process.
Provides increased certainty about the time, expenditure and level of information required for the EIA.
Reduces the risk of additional works and related schedule or expenditure impacts during the mining application
process.
Early integration of the regulator.
The ultimate outcome of the Scoping process will be a final Scoping Report that addresses all matters raised during the
process, and which will form the Terms of Reference against which the application for a Mining Lease will be assessed. This
project-specific Terms of Reference replaces the standard Terms of Reference with which the application would otherwise
be required to comply.
Milestones and Next Steps
The Draft Scoping Report will be assessed by multiple South Australian Government agencies, coordinated by the
Department for Energy and Mining (DEM). The assessment seeks to ensure that Coda’s proposed environmental studies and
mitigation strategies are sufficient to meet South Australia’s rigorous environmental standards.
Following completion of the assessment and review, the Final Scoping Report establishes binding, project-specific terms of
reference between Coda and the Department. This ensures that the scope of required studies and mitigation measures
cannot be altered later in the approvals process, enabling Coda to proceed to a Mining Lease application with greater
certainty and without the risk of unforeseen regulatory changes. Coda expects this to significantly reduce the regulatory risk
associated with the development of the Elizabeth Creek Project.
3
For full details, please see “Material Uplift in Copper and Silver Recoveries”, released to the ASX on 26th June 2025, and available at
https://www.codaminerals.com/wp-content/uploads/2025/06/20250626_ANN_Coda_Material-Uplift-in-Copper-and-Silver-Recoveries_vRelease.pdf
6 Altona Street, West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
This announcement has been authorised for release by the Board of Coda Minerals Ltd
Further Information:
Chris Stevens
Chief Executive Officer
Coda Minerals Limited
info@codaminerals.com
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
About Coda Minerals
Coda Minerals Limited (ASX: COD) is focused on the discovery and development of minerals that are leveraged to the
global energy transformation through electrification and the adoption of renewable energy technologies.
Coda's flagship asset is the 100%-owned Elizabeth Creek Copper-Cobalt Project, located in the world-class Olympic
Copper Province in the Eastern Gawler Craton, South Australia’s most productive copper belt. Elizabeth Creek is centred
100km south of BHP’s Olympic Dam copper-gold-uranium mine, 15km from its new Oak Dam West Project and 50km
west of its Carrapateena copper-gold project.
Coda consolidated 100% ownership of the Elizabeth Creek Copper Project after completing the acquisition of its former
joint venture partner, Torrens Mining, in the first half of 2022.
In December 2021, Coda announced a maiden Indicated and Inferred Mineral Resource Estimate for the Emmie Bluff
copper-cobalt deposit at Elizabeth Creek, which was later updated in January of 2024. The Mineral Resource comprises
40.2Mt @ 1.27% copper, 569ppm cobalt, 17g/t silver and 0.17% zinc (1.87% Copper Equivalent (CuEq)) containing
approximately 510kt copper, 23kt cobalt, 21.7Moz silver and 70kt zinc (751kt CuEq) 4. Importantly, 95% of the contained
metal is classified in the higher confidence ‘Indicated Resource’ category and is available for use in mining studies.
Emmie Bluff is one of three known ‘Zambian-style’ copper-cobalt deposits at Elizabeth Creek, including JORC 2012
compliant Indicated Mineral Resources at the Windabout (18Mt @ 1.14% CuEq) and MG14 (1.8Mt @ 1.67% CuEq)
deposits5. Collectively, the three resources at Elizabeth Creek now host a total of over 1 million tonnes of contained
copper equivalent.
A scoping study into the development of these three deposits was released in March of 2023 and updated in January 6,
March7 and December of 2024. The updated study demonstrated an economically robust project with a 16 year mine
life, capable of producing approximately 26,700 tonnes of copper and 1,300 tonnes of cobalt at steady state production
levels. The project had a lifetime average AISC of USD $1.80/lb of Cu (after by-product credits) and an approximately pretax NPV7 of $1.18B 8.
4
2024.01.30 - Scoping Study Update Delivers Materially Improved Economics Competent Person: Dr Michael Cunningham.
2020.10.26 - Confirmation Statements JORC, Competent Person: Tim Callaghan.
6
2024.01.30 - Scoping Study Update Delivers Materially Improved Economics
7 2024.03.14 – Further Key Improvement in Underground Project Economics
8 2024.12.03 – New Resources, Higher Recoveries Boost Elizabeth Creek Value. See below for LR 5.23.2 Statement.
5
6 Altona Street, West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Coda has also discovered a significant IOCG system adjacent to and below the Emmie Bluff target, with initial deep
diamond drilling in June 2021 intersecting 200m of intense IOCG alteration at the Emmie IOCG target, including
approximately 50m of copper sulphide mineralisation9. Since then, Coda has drilled 21 holes into Emmie IOCG, with all
but three returning significant widths of mineralisation, some over 3% copper and 0.5g/t gold 10.
Coda has a dual strategy for success at Elizabeth Creek. Firstly, it is working towards the next step in the development
process for its Zambian-style copper cobalt projects by advancing technical and economic studies to build on the results
of the recently updated Scoping Study, while simultaneously undertaking exploration to further define and extend known
Zambian-style copper-cobalt resources across multiple prospects.
Secondly, it is undertaking a substantial geophysical and related assessment programme at the Emmie IOCG prospect to
further understand the structures and extent of the geological model defined through drilling.
Coda also has consolidated 100% ownership of the Cameron River Copper-Gold-Uranium Project, located in the highly
prospective Mount Isa Inlier in Queensland. The Project comprises 35km2 of copper and gold exploration tenure spanning
two Exploration Permits (EPMs 27042 and 27053).
9
2021.06.22 - Thick Zone of IOCG Mineralisation Intersected at Emmie Bluff Deeps, Competent Person: Mr Matthew Weber.
2022.08.18 – Assays from IOCG Drilling Confirm Target Areas for Follow Up, Competent Person: Mr Matthew Weber.
10
6 Altona Street, West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Appendix 1: Elizabeth Creek Mineral Resources
Table 1 Aggregated Mineral Resources at Elizabeth Creek
OPEN PIT
Resource
Category
Type
Proposed
Tonnage
Cut-off
Mining
Mt
Grade
Method
Copper
Cobalt
Silver
Zinc
Copper Equivalent
Grade
Contained
Grade
Contained
Grade
Contained
Grade
Contained
Grade
Contained
(% Cu)
Metal (t)
(ppm Co)
Metal (t)
(g/t Ag)
Metal (Moz)
(ppm Zn)
Metal (t)
(% CuEq)
Metal (t)
684
4000
MG14
Indicated
Zambian
Open Pit
1.8
0.5% CuEq
1.2%
22,700
330
600
14
0.8
Cattle Grid South
Inferred
Breccia
Open Pit
5.8
0.2% Cu
0.6%
36,000
120
700
3.5
0.7
Windabout
Indicated
Zambian
Open Pit
17.7
0.5% CuEq
0.8%
136,100
490
8700
8
4.6
1.4%
249,100
Sub Totals
Indicated
Zambian
Open Pit
19.5
0.5 CuEq
0.8%
158,800
480
9300
8.5
5.4
1.4%
316,000
(Open Pit)
Inferred
Breccia
Open Pit
5.8
0.2% Cu
0.6%
36,000
120
700
3.5
1
Proposed
Tonnage
Cut-off
Mining
Mt
Grade
UNDERGROUND
Resource
Category
Type
Method
Copper
Cobalt
1.7%
684
Silver
30,600
36,00011
4,000
Zinc
Copper Equivalent
Grade
Contained
Grade
Contained
Grade
Contained
Grade
Contained
Grade
Contained
(% Cu)
Metal (t)
(ppm Co)
Metal (t)
(g/t Ag)
Metal (Moz)
(ppm Zn)
Metal (t)
(% CuEq)
Metal (t)
Indicated
Zambian
Underground
37.5
1% CuEq
1.3%
485,000
590
22,000
17
20.6
1800
66000
1.9%
715,000
Emmie Bluff
Inferred
Zambian
Underground
2.7
1% CuEq
0.9%
46,000
280
1,000
12
1.1
1700
5000
1.3%
36,000
Sub Total
(Underground)
Combined Zambian
Underground
40.2
1% CuEq
1.3%
511,000
570
23,000
16.8
21.7
1700
70000
1.9%
751,000
Project Wide Total12
65.5 Mt
725,800t Contained Cu
33,000t contained Co
28 Moz Contained Ag
75,000t Contained Zn13
1,067,000t contain CuEq
11
No Copper Equivalent was calculated for Cattle Grid South. Contained CuEq tonnes quoted in this column for Cattle Grid South consist of contained copper only.
Total figures have been aggregated purely for convenience and to contextualise the specific contribution of individual Mineral Resource Estimates to the overall project scale. Grades reported are tonnage-weighted
averages of the individual Mineral Resource Estimates. Coda notes that the total figure includes resources reported at varying cut-off grades, with varying estimation techniques, metallurgical properties and proposed
mining methods. Individual Mineral Resource Estimates should be considered individually. A total copper equivalent figure has not been disclosed as Coda does not believe it is currently appropriate to calculate a
copper equivalent for the Cattle Grid South Mineral Resource Estimate. Please see below sections Statement Regarding Metal Equivalent Calculations and Competent Persons Statement for full details on the
calculation of copper equivalents and links to original releases/CP statements. Figures have been rounded for simplicity.
13 No Zinc estimate was provided for the MG14 and Windabout deposits. This figure reflects the contained tonnage solely from Emmie Bluff and Cattle Grid South.
12
6 Altona Street, West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Competent Persons’ Statements and Confirmatory Statement - Mineral Resource Estimates
and Production Targets
MG14 Indicated Mineral Resource: The information is extracted from the report entitled "Confirmation Statements
JORC" created on 26th October 2020 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-022989156A1003162&v=70bc033a22188bdfefb8a0b8ad3c24897ef2837d.
The company confirms that it is not aware of any new information or data that materially affects the information included
in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to
apply and have not materially changed. The company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcement.
Windabout Indicated Mineral Resource: The information is extracted from the report entitled "Confirmation Statements
JORC" created on 26th October 2020 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-022989156A1003162&v=70bc033a22188bdfefb8a0b8ad3c24897ef2837d.
The company confirms that it is not aware of any new information or data that materially affects the information included
in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to
apply and have not materially changed. The company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcement.
Emmie Bluff Mineral Resource: The information is extracted from the report entitled “Scoping Study Update Delivers
Materially Improved Economics" created on 30 January 2024 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-02766550-6A1191314.
The company confirms that it is not aware of any new information or data that materially affects the information included
in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to
apply and have not materially changed. The company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcement.
Cattle Grid South Mineral Resource: The information is extracted from the report entitled “Initial Copper Resource for
Cattle Grid South" created on 03 July 2024 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-028239896A1214274&v=4015c7b87631faf94ecd96975272ff9ad5cb14c3.
The company confirms that it is not aware of any new information or data that materially affects the information included
in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to
apply and have not materially changed. The company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcement.
Listing Rule 5.19.2
In relation to any Production Target or any forecast financial information based on any Production Target quoted or
referenced in this announcement, the Company confirms that all material assumptions underpinning both the Production
Target and any forecast financial information continue to apply and have not materially changed.
6 Altona Street, West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
The original ASX announcement released on 3 December 2024 relating to any Production Target or forecast financial
information derived from any Production Target referenced within this announcement can be found here.
Statement Regarding Metal Equivalent Calculations
Metal Equivalent grades are quoted for one or more of the Emmie Bluff, Windabout and MG14 Mineral Resources, or for
exploration results considered by the company to be related directly to one of these Mineral Resources, in this
announcement.
For the Emmie Bluff Mineral Resource:
The Emmie Bluff Mineral Resource is reported as 40.2Mt @ 1.27% Cu, 569 ppm Co, 16.8 g/t Ag and 0.17% Zn (1.87%
Copper Equivalent (CuEq)) reported at a cut-off grade of 1% CuEq. The calculation of this metal equivalent is based on
the following assumptions.
Metal
Copper
Cobalt
Zinc
Silver
Coefficient
0.8
0.85
0.9
0.85
Forecast Price
$7,000
$55,000
$2,100
$18.50
Price Unit
USD/Tonne
USD/Tonne
USD/Tonne
USD/Oz
Price assumptions used when calculating copper equivalent grades were based primarily on Consensus Economics
forecasts of metals, except for Cobalt, which was sourced via communication with subject matter experts. Metallurgical
assumptions used when calculating copper equivalent grades were based on a simple bulk float utilising rougher and
minimal cleaner/scavenger circuits. The produced a reasonably consistent mean recovery across most metals of between
approximately 83 and 94 percent. For simplicity, and to in part account for losses associated with less intensive cleaner
floats and losses to the hydromet plant, these figures were rounded down to the nearest 5%.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝑢𝐸𝑞% = 𝐶𝑢% + 0.00068 × 𝐶𝑜 𝑝𝑝𝑚 + 0.337 × 𝑍𝑛 % + 90.3 ×
𝐴𝑔 𝑝𝑝𝑚
10000
For the Windabout and MG14 Mineral Resource:
The Windabout and MG14 Mineral Resource are reported at a cut-off grade of 0.5% CuEq as:
• Windabout: 17.67Mt @ 0.77% Cu, 492 ppm Co and 8 g/t Ag (1.41% CuEq)
• MG14: 1.83Mt @ 1.24% Cu, 334 ppm Co and 14 g/t Ag (1.84% CuEq)
The calculation of this metal equivalent is based on the following assumptions.
Metal
Copper
Cobalt
Mining
Recovery %
0.9
0.9
Dilution %
Recovery %
Payability %
Forecast Price
Price Unit
0.05
0.05
0.6
0.85
0.7
0.75
$6,600
$55,000
USD/Tonne
USD/Tonne
Price assumptions used when calculating copper equivalent grades were based on recent historical metal prices at the
time of calculation (2018). Metallurgical assumptions are based on extensive metallurgical testwork undertaken on the
two deposits to 2018 across various potential flowsheets involving both floatation and leaching. Ag analyses in the
estimation and metallurgical testwork were considered insufficient at the time to include in the metal equivalent
calculation.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝑢𝐸𝑞% = 𝐶𝑢% + 0.0012 × 𝐶𝑜 𝑝𝑝𝑚
It is the opinion of the company that both sets of prices used in the calculations are reasonable to conservative long-term
forecasts for real dollar metal prices during the years most relevant to the deposits (approx. 2026-2030).
It is the opinion of the company that all of the elements included in the metal equivalent calculations have a reasonable
potential to be recovered and sold.
For full details of the Emmie Bluff Metal Equivalent calculation, please see “Scoping Study Update Delivers Materially
Improved Economics”, released to the ASX on 30th January 2024 and available at https://www.codaminerals.com/wpcontent/uploads/2024/01/20240130_Coda_ASX-ANN_Scoping-Study-Update-Delivers-Materially-ImprovedEconomics_RELEASE.pdf.
6 Altona Street, West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
For full details of the MG14/Windabout Metal Equivalent Calculation, please see “Confirmation of Exploration Target &
Mineral Resource and Ore Reserve Statement”, released to the ASX on 23 rd October 2020 and available at
https://www.codaminerals.com/wp-content/uploads/2020/10/20201026_Coda_ASX-ANN_Confirmation-StatementsJORC.pdf.
Listing Rule 5.23.2
The Company confirms that it is not aware of any new information or data that materially affects the information included
in the original market announcements cited in this announcement and, in the case of estimates of Mineral Resources or
Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The Company confirms that the form and context in
which the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statements
This announcement contains ‘forward-looking information’ that is based on the Company’s expectations, estimates and
projections as of the date on which the statements were made. This forward-looking information includes, among other
things, statements with respect to the Company’s business strategy, plans, development, objectives, performance,
outlook, growth, cash flow, projections, targets and expectations, mineral reserves and resources, results of exploration
and related expenses. Generally, this forward-looking information can be identified by the use of forward-looking
terminology such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘potential’, ‘likely’, ‘believe’, ‘estimate’, ‘expect’, ‘intend’,
‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’, ‘evolve’ and similar expressions. Persons reading this
announcement are cautioned that such statements are only predictions, and that the Company’s actual future results or
performance may be materially different. Forward-looking information is subject to known and unknown risks,
uncertainties and other factors that may cause the Company’s actual results, level of activity, performance or
achievements to be materially different from those expressed or implied by such forward-looking information.
6 Altona Street, West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Share your feedback
Discover