March 2024 Quarterly Activities and Cashflow Reports
Released
Released
Announcement PDF
ASX RELEASE
30 April 2024
ASX Code: COD
QUARTERLY
ACTIVITIES REPORT
FOR THE QUARTER ENDED 31 MARCH 2023
HIGHLIGHTS
CONTENTS
1.0
Overview
2.0
Projects & Assets
2.1
Tenement
Schedule
2.2
Elizabeth Creek
Copper Project
Update
2.3
Future Work
Programme
3
Corporate
3.1
Finance &
Elizabeth Creek – Copper-Cobalt Project (South Australia)
- Updates to the Copper-Cobalt Scoping Study released during the quarter, increase
estimated NPV and IRR of the project to $826 million and 31%, respectively.
-
Material improvements to projected economics resulting from optimisation of
underground mine plan and methods and additional metallurgical testwork.
-
Ongoing work on mine planning, metallurgy and exploration expected to provide
ongoing upside.
• Elizabeth Creek – Other
- Completed processing and interpretation of ground MT data collected in 2023, strong
indications of additional potential mineralisation east of Emmie Bluff.
• Corporate
- $3.4 million cash on hand as at 31 March 2024 following strongly supported $2 million
capital raise during the Quarter.
- An additional $0.9 million expected following shareholder approval at General
Meeting on 15 May 2024.
• Upcoming Milestones
- Ongoing optimisation of Elizabeth Creek Study, particularly focussed on optimisation
of flotation options.
- The Company is continuing to actively investigate and advance funding options for
ongoing PFS work at Elizabeth Creek. This includes advanced discussions with strategic
funders and an ongoing royalty process.
Use of Funds
4
Events
Subsequent to
Quarter End
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN: 49 625 763 957
1. Overview
Coda Minerals Chair, Keith Jones, said: “During the quarter ending 31 March our team completed two significant scoping
study updates which result in the scoping study at Elizabeth Creek forecasting an NPV of approximately $826 million and
an IRR of 31%.1 This represents an increase in value of 45% since the initial scoping study.
“Our commodity price assumptions remain unchanged from our initial major Scoping Study for the Elizabeth Creek Copper
Project.
“We do note that the copper price has risen by over US$ 1,600 per tonne over the past months and is now over US$ 1,000/t
higher than the assumptions used in our Scoping Study. This provides another tailwind for an already very attractive
project.
“During the June quarter the team will continue to advance new flowsheet testwork on copper recoveries and variability
testwork and to finalise plans to explore potential extensions to Emmie Bluff. With a 14-year mine life of which 11 years
is projected to be at the full production rate of 26kt copper cathode and 1.3kt cobalt sulphate there is a significant
potential impact from the addition of more tonnes to the mine plan.
“The team has consolidated ownership of the Cameron River Project in Queensland, which is now 100% owned by Coda..
This will provide more options for commercialisation of the tenure which may include farm-out, joint venture, or additional
exploration. Cameron River is highly prospective and located in a very active region for copper exploration.
“The Company completed a capital raising during the quarter raising $2 million using the 7.1 and 7.1A placement capacity
with an additional $0.9m subject to shareholder approval at an EGM in May 2024.
“Coda ended the quarter with a cash balance of $3.4 million with a projected cash balance following the EGM of over
$4.1million. This will provide important balance sheet strength and the ability to advance economic and technical studies
as well as exploration at Elizabeth Creek.
“We are also advancing project funding discussions and have appointed Cutfield Freeman as advisors on a formal royalty
funding programme which aims to provide non-equity dilutive funding to advance the Elizabeth Creek Copper Project.
“Coda now has stronger balance sheet, significantly Improved project economics and an exceptional programme of
ongoing work against the backdrop of materially improved copper sentiment. This bodes very well for the future.”
1 Numbers are based on pre-tax estimates at an 8% discount rate. All economic projects should be read in conjunction with the full release:
https://www.codaminerals.com/wp-content/uploads/2024/03/20240314_Coda_ASX-ANN_Further-Key-Improvement-in-Underground-ProjectEconomics_RELEASE.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
2. Projects & Assets
2.1 Tenement Schedule
In accordance with ASX Listing Rule 5.3.3, Coda provides the following information about its tenements for the quarter ended 31 March 2024.
Table 1 Coda tenement schedule
Grant Date
Expiry Date
Area
km2
Ownership
SA
29 October 2017
28 October 2028
47
100%
Elizabeth Creek
SA
25 March 2020
24 March 2025
363
100%
EL 6265
EL 6945
EL 6917
EPM 27042
Elizabeth Creek
Elizabeth Creek2
Booleroo
Cameron River
SA
SA
SA
Queensland
7 October 2018
17 October 2023
25 July 2023
10 October 2019
6 October 2029
16 October 2029
24 July 2029
9 October 2024
291
73
202
22.4
100%
100%
100%
100%3
EPM 27053
Cameron River
Queensland
14 February 2020
13 February 2025
12.8
100%
EL 73424
EL 75845
EL 9238
Club Terrace
Club Terrace
Club Terrace
Victoria
Victoria
NSW
19 August 2020
18 January 2021
29 August 2022
29 August 2022
3 August 2021
28 August 2027
28 August 2027
3 August 2027
375
108.5
260
100%
100%
100%
EL 76376
Balmoral
Victoria
17 June 2021
29 August 2022
28 August 2027
835
100%
EL 6962
EL 6963
EL 6964
EL 6965
Kinloch
Kinloch
Kinloch
Kinloch
7 December 2023
13 December 2023
18 December 2023
18 December 2023
6 December 2029
12 December 2029
17 December 2029
17 December 2029
854
990
555
785
25%
25%
25%
25%
ELA 2557
Laloki
SA
SA
SA
SA
Papua New
Guinea
N/A (refused)
N/A (refused)
126
N/A
Tenement
Project
Location
EL 6141
Elizabeth Creek
EL 6518
Application Date
16 November 2017
2
Tenure is adjacent to Elizabeth Creek but has not been formally integrated into the broader Elizabeth Creek Project.
Note: 100% tenement transfer for Cameron River tenure is ongoing as at current time
4 Subsequent to quarter end, the Victorian Minister for Energy and Resources has consented to the surrender of this tenement.
5 Subsequent to quarter end, the Victorian Minister for Energy and Resources has consented to the surrender of this tenement.
6
Subsequent to quarter end, the Victorian Minister for Energy and Resources has consented to the surrender of this tenement.
3
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Tenements are held in a 70:30 split between Coda
Minerals and Torrens Mining Ltd, a wholly owned
subsidiary of Coda Minerals, resulting in effective
100% control by Coda Minerals.
Held 100% by Coda Minerals.
Held 100% by Coda Minerals.
Coda has made a commercial agreement to
acquire 100% of the Cameron River project and
transfer is ongoing.
Held by wholly owned subsidiary Torrens Mining
Ltd
Held by wholly owned subsidiary Torrens Mining
Ltd
Held in a 25:75 split with Boss Energy
Application by wholly owned subsidiary Torrens
Mining
2.2 Elizabeth Creek Project
Elizabeth Creek Copper Cobalt Project Scoping Study Updates
Coda released two updates to it’s Elizabeth Creek Copper-Cobalt Project Scoping Study during the quarter, on 30
January7 and on 14 March8.
The most significant change outlined in the January 2024 Scoping Study Update was the conversion from a conventional
drill and blast underground mining methodology utilising long-hole open stope techniques at Emmie Bluff to a
mechanical cutting mining method utilising continuous miners. Undertaking this conversion required a re-estimation of
the Emmie Bluff Mineral Resource. Additional changes included optimisation of flotation reagents and the transition
from purchased limestone to on-site mined dolomite for acid neutralisation.
January 2024 Update
Mechanical Cutting in Detail
Mechanical cutting via continuous miner was selected to replace long-hole open stoping using drill-and-blast as the
base case underground mining method at Emmie Bluff. Continuous mining machines, use a large, rotating steel drum
equipped with tungsten carbide “teeth” or picks to cut rock. They operate in a continuous manner, removing the
downtime associated with loading explosives for drill and blast and can significantly improve efficiency and lower
mining costs.
The Tapley Hill Formation black shale which hosts the mineralisation at Emmie Bluff is relatively soft with acceptable
abrasiveness, making it amenable to mechanical cutting in this manner. Mechanical cutting as alternative to drill and
blast is considered very attractive for numerous reasons, including:
• A lower operating cost;
• Higher productivity;
• Higher geotechnical tolerance; and
• More precise targeting of the narrower, high-grade edges of the mineralised lodes with very low dilution.
Coda engaged mining consultants Mining Plus to undertake a modification and update to their previously completed
underground mining study9 of the Emmie Bluff deposit to assess the technical and economic viability of the use of
mechanical cutting. Input data was largely reused form the previous study, with the scope of work principally consisting
of liaising with OEMs, geotechnical review and update, mining method and fleet selection, mine design, scheduling and
optimisation in line with high-level financial modelling. The physicals of the study are summarised as Table 2.
Table 2 Production statistics from the Emmie Bluff deposit and Elizabeth Creek Project under the new proposed mine plan
and Mineral Resource as compared to the mine plan and Mineral Resource used during the Elizabeth Creek Copper-Cobalt
Project (ECCCP) Scoping Study released March of 2023. Figures have been rounded to reflect uncertainty.
Total Mined Ore (Emmie Bluff)
Average Mined Ore Grade (% CuEq, Emmie Bluff)
Waste:Ore Ratio (Emmie Bluff)
Average Mining Cost per tonne of Ore (AUD, Emmie Bluff)
Mechanical Cutting
(Dec 2023)
28,600,000
1.80%
0.063
$41.48
Scoping Study
(March 2023)
26,200,000
1.86%
0.036
$53.73
Anticipated Total Copper Production (kt, Elizabeth Creek)
Anticipated Total Cobalt Production (kt, Elizabeth Creek)
Anticipated Total Silver Production (Moz, Elizabeth Creek)
Anticipated Total Zinc Production (kt, Elizabeth Creek)
307.2
16.86
13.02
49.12
317.3
14.44
8.54
38.21
7 Please see “Scoping Study Update Delivers Materially Improved Economics”, available at https://www.codaminerals.com/wp-
content/uploads/2024/01/20240130_Coda_ASX-ANN_Scoping-Study-Update-Delivers-Materially-Improved-Economics_RELEASE.pdf
8 Please see “Further Key Improvement in Underground Project Economics”, available at https://www.codaminerals.com/wpcontent/uploads/2024/03/20240314_Coda_ASX-ANN_Further-Key-Improvement-in-Underground-Project-Economics_RELEASE.pdf
9 This study is available (including JORC Table 1) in a release to the ASX dated 22 November 2022 at https://www.codaminerals.com/wpcontent/uploads/2022/11/20221122_Coda_ASX-ANN_Mining-Study-Marks-Key-Breakthrough-at-Elizabeth-Creek_RELEASE.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Peak annual mined production has increased from approximately 2.5Mtpa to approximately 3.0Mtpa. Production over
time at Emmie Bluff is shown in Figure 3. Mining costs are materially reduced vs the old method with higher overall
production on a tonnage basis. Mechanical cutting is a non-explosive mining method with excellent control on cutting
application and is considered geotechnically less impactful than drill and blast, and as such the stopes do not have any
overbreak dilution applied.
The mine was designed using the selected mechanical cutting method based on an approximate 2.5-2.9Mtpa production
rate and a cut-off grade of 1.00% CuEq. Stopes were arranged in super panels (see Figure 1), and were aligned
approximately NE/SW in line with the direction of principal stress (Figure 2).
Figure 1 Super panel parameters and pillar positioning
Figure 2 Super panel heights and distribution. Note the north axis is rotated approximately 45 degrees to align the super panels long
axis with the image. Note the decline has shifted relative to the previous mine design, being placed to the southwest, outside
economic material.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Emmie Bluff Mined Production by Resource Category - Mechanical Cutting
3,500,000
2.50%
3,000,000
2.00%
1.50%
2,000,000
1,500,000
1.00%
CuEq Grade
Production (T)
2,500,000
1,000,000
0.50%
500,000
0
0.00%
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16
Emmie Bluff - Indicated
Emmie Bluff - Inferred
Emmie Bluff - Inferred CuEq %
Emmie Bluff - Indicated CuEq %
Figure 3 Emmie Bluff production tonnes and grade under the mechanical cutting paradigm.
The continuous miner productivity was based on the height of the stope panel to be mined, and mining rates provided
after detailed consultation with and modelling by continuous miner OEM (Komatsu). A conservative approach was taken
to modelling productivities for the continuous mining machines. The instantaneous cutting rates were based on
interpolation of Specific Energy of cutting from minerals previously tested in Komatsu LCTR lab. Concerns were raised
regarding the abrasiveness (very high) of the shale in terms of machine wear and pick life. The production modelling
incorporated elevated scheduled maintenance downtime and conservative pick usage rates. The effective productions
hours for the cutting machines was determined to be 6.7 hours for a 12 hour shift after scheduled delays and equipment
availabilities were considered.
Mineral Resource Update in Detail
As part of the mechanical cutting study, Coda completed an update to the Emmie Bluff Mineral Resource Estimate to
improve definition within the vertical component of the block model. This has improved the applicability of the model to
mining studies. Slight changes to accommodate improvements suggested by the CP since the development of the
previous resource model.
These included the detailed modelling of upper and lower mineralised domains based on drill results, reduction in
composite length from 1.0m to 0.5m and conversion from a proportional to a sub-block model. Distance restrictions and
top cuts were also loosened to account for the distribution of mineralisation within the host rock, which is believed to be
relatively locally consistent with limited “nugget effect”.
The result was a model with tighter definition on the Z axis and a smoother lateral grade dispersal from drillholes, better
representing the most plausible distribution of metal based on the geology of the deposit.
The Updated Mineral Resource is reported as a combination of Indicated and Inferred mineralisation at a combined total
of 40.2Mt @ 1.87% CuEq (1.27% Cu, 569 ppm Co, 16.8 g/t Ag and 0.17% Zn). A detailed breakdown of the
Indicated/Inferred split and a detailed breakdown of mineralisation across the upper and lower lodes is provided below
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
as Table 3. A comparison between the plan-view extent of the most recent Mineral Res Estimate vs the previous
estimate 10 is provided as Figure 2.
Table 3 Emmie Bluff Mineral Resource in detail, with domaining and confidence interval by domain. Resource is reported at a lower
cut-off grade of 1 % Cu Equivalent. Tonnages are rounded to the nearest 100,000t, contained metal masses are rounded to the
nearest 1,000 tonnes or 100,000 Oz. Figures may not add up exactly due to rounding.
Copper Equivalent
Grade
Copper
Grade
(% CuEq)
Contained
Metal (t)
(% Cu)
Tonnes
Cobalt
Silver
Grade
Contained
Contained
Metal (t) (ppm Co) Metal (t)
Grade
Zinc
(g/t Ag)
Contained
Metal (MOz)
Grade Contained
(% Zn) Metal (t)
Indicated Upper Tapley
33,200,000
1.98%
658,000
1.33%
443,000
622
21,000
18.1
19.3
0.18%
60,000
Inferred Upper Tapley
2,100,000
1.35%
29,000
0.96%
21,000
300
1,000
13.4
0.9
0.18%
4,000
Upper Tapley Total
35,400,000
1.94%
687,000
1.31%
464,000
602
21,000
17.8
20.2
0.18%
63,000
Indicated Lower Tapley
4,300,000
1.34%
57,000
0.98%
42,000
347
1,000
9.8
1.3
0.14%
6,000
Inferred Lower Tapley
600,000
1.13%
7,000
0.86%
5,000
222
0
7.2
0.1
0.15%
1,000
Lower Tapley Total
4,900,000
1.31%
64,000
0.96%
47,000
332
2,000
9.5
1.5
0.14%
7,000
Indicated
37,500,000
1.91%
715,000
1.29%
485,000
590
22,000
17.1
20.6
0.18%
66,000
Inferred
2,700,000
1.30%
36,000
0.94%
26,000
283
1,000
12.1
1.1
0.17%
5,000
Total
40,200,000
1.87%
751,000
1.27%
511,000
569
23,000
16.8
21.7
0.17%
70,000
Figure 4 Emmie Bluff Mineral Resource, looking northeast, showing distribution of Inferred vs Indicated .
10 Released in 2021, 38,900,000 tonnes at 1.89% CuEq (Indicated) and 4,500,000 tonnes at 1.38% CuEq Inferred, for a total of 43,300,000 tonnes at
1.84% CuEq (1.30% Cu, 470 ppm Co, 11 g/t Ag and 0.15% Zn.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Figure 5 Emmie Bluff Mineral Resource outline (red) overlain over 2021 Emmie Bluff Mineral Resource outline (white) showing
differences in geometry.
Note: For full details, including JORC Table 1 and relevant Competent Person’s declaration, please see the original market
announcement released
30 January
2024
and
available
at
https://www.codaminerals.com/wpcontent/uploads/2024/01/20240130_Coda_ASX-ANN_Scoping-Study-Update-Delivers-Materially-ImprovedEconomics_RELEASE.pdf
Metallurgical Changes in Detail
Simultaneously with studying improvements to mining methods, Coda assessed options to reduce costs in mineral
processing. Two key changes were identified:
Reduction In Flotation Reagents
Coda undertook testwork to optimise flotation reagent consumption on material from the Windabout deposit. These
tests suggested that reduction in the use of Cyquest (a slimes dispersant) by 50% and PAX (potassium amyl xanthate, a
collector) by approximately 40% would have no significant effect on the overall recovery of copper or cobalt. The
Company has assumed that both reductions will be applied without reducing recovery for this Scoping Study Update.
This reduction is broadly in line with expectations that, given test work programmes specifically designed to optimise
reagent doses, consumption of reagents would decrease. Further savings were realised due to increased throughput
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
from 2.5 Mtpa to 3.0 Mtpa and associated economies of scale. The result was a reduction in flotation costs by an
estimated 14% at Emmie Bluff, 22% at Windabout.
Acid neutralisation
Costs associated with acid neutralisation in the hydrometallurgical plant were reduced by replacing purchased
limestone with locally mined dolomite. Limestone, which was used to neutralise the acidic pregnant leach solution (PLS)
in the hydrometallurgical process plant, was previously assumed to be purchased offsite at a cost of $145 AUD/t
(inclusive of delivery and processing).
Coda has confirmed through mapping the presence of extensive outcropping dolomite, which is chemically very similar
to limestone, in the area east of MG14. The Company is confident that more than sufficient dolomite exists within the
project to supply its needs through the foreseeable life of the mine and beyond. Mining and processing of this material
is anticipated to be materially lower cost than limestone, with total cost estimated to be approximately $20/tonne.
Estimates by Coda’s metallurgical consultants suggest that approximately $10.7 million of CAPEX will be required to
account for this change, this is principally due to the requirement for an additional, small scale crushing plant.
March 2024 Update
The March 2024 Update to the Scoping Study focussed on pillar recovery, introducing grout pack support to increase
extraction percentage at the Emmie Bluff deposit, resulting in an increased total extracted tonnes and copper
production over a 14-year project life. The update also optimised the underground mining schedule, bringing forward
extraction of higher-grade tonnes for improved early revenues.
These changes improved project economics by 12% relative to the January 2024 Update, increasing pre-tax NPV8 by $91
million to $826 million while simultaneously improving IRR to 31%. Cumulatively, this represented an improvement of
45% relative to the original March 2023 Scoping Study.
Pillar Recovery in Detail
Coda tasked mining engineering consultants Mining Plus to devise a pillar recovery plan for the Emmie Bluff coppercobalt deposit. After ruling out traditional paste filling due to technical challenges associated with the narrow, flatdipping nature of the deposit, the company opted for grout-pack support. This method, utilized in similar operations
globally, including at Zimplats Bimha Mine in Zimbabwe, offers a simpler means of roof support in deposits of Emmie
Bluff’s geometry.
These packs are placed in 8m wide development drives and filled with a blend of cement and tailings, before being left
to cure for a period of at least 28 days, at which point they are expected to provide sufficient strength and support to
allow for the safe extraction of additional mineralized material through partial removal of pillars. It is anticipated that
extraction will increase from approximately 77% of any given super panel to up to 89%.
To facilitate the implementation of the pillar recovery strategy, a central grout pumping plant will need to be
established at Emmie Bluff. This facility will mix tailings and cement in a ratio of approximately 9:1 and distribute the
resulting slurry through modified drill holes strategically placed throughout the ore body.
Once pillar recovery has taken place, two additional grout packs will be installed to close those gaps at the ends of the
drives. These additional grout packs at ends of each drive will allow for sealing of individual compartments within the
super panels, which in turn may be used to contain tailings pumped into the completed mining area. This option will be
assessed during PFS as a means of potentially reducing the footprint of above ground tailings storage facilities.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Figure 6 Super panels showing pillar material to be recovered (top) and grout pack positions (bottom).
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Economic and Physical Comparisons
Table 4: Updated Scoping Study (January 2024) and Updated Scoping Study – (March 2024) key Project changes
Study Section
Updated Scoping Study (January 2024)11
Updated Scoping Study – (March 2024)
Tenements
EL6518 (MG14 & Windabout), EL6265 (Emmie Bluff)
No Change
Mineralisation
Zambian-style sediment-hosted copper-cobalt mineralisation
No Change
Mineral Resource
MG14: 1.83Mt @ 1.24%Cu, 0.03%Co
Windabout: 17.67Mt @ 0.77%Cu, 0.05%Co
Emmie Bluff: 40.2Mt @ 1.27%Cu, 0.06%Co
(of which 93% in indicated, 7% inferred)
MG14 & Windabout: Open Pit
Emmie Bluff: Underground, mechanical cutting
MG14: No Change
Windabout: No Change
Emmie Bluff: No Change
Mining Method
Operating Structure
MG14 & Windabout: Contract Mining
Emmie Bluff: Partial Contract Mining, Partial Owner-Operated
Processing Plant:
Majority Owner Operated, O2 Plant
converted to a Build Own Operated (BOO) model
Processing Capacity
3Mtpa Throughput
Products
MG14: Copper Concentrate
Windabout & Emmie Bluff: Copper Cathode, Cobalt Sulphate,
Zinc Carbonate & Silver Dore
Stage 1: Flotation
All ore will undergo primary crushing followed by grinding in a
SAG mill with a pebble crushing circuit. Crushed ore from MG14
and Windabout will pass through an additional deslime circuit
before flowing through a conventional rough-cleanerscavenger flotation circuit to produce a copper cobalt
concentrate.
Mineral Processing
Copper
Flotation
Recovery
Production
Tailings
Power
Water
Stage 2: Hydromet
The concentrates from Windabout and Emmie Bluff will then
proceed to a downstream hydrometallurgical processing plant
based on an Albion Process™ leach circuit. Locally mined
dolomite replaces purchased limestone reducing cost for acid
neutralisation. The overflow liquor, containing copper, cobalt,
and zinc, will be directed to an SXEW plant, followed by a Cobalt
SX and Zinc precipitation circuit. The CCD discharge slurry,
containing silver, will be processed through a lime boil and
cyanidation circuit.
MG14:
57.93%
Windabout: 66.5%
Emmie Bluff: 77.2%
Copper: 307.2 kt
Cobalt: 16.9 kt
Silver: 13.0 Moz
Zinc: 49.1 kt
Conventional tailings slurry method located 1km away within a
basin below the processing plant at Emmie Bluff.
Access grid power via existing Mt Gunson substation located
approximately 9.5km south southwest of Windabout deposit.
12 hole borefield
11
MG14 & Windabout: No Change
Emmie Bluff: Underground, mechanical cutting with pillar
recovery
MG14 & Windabout: No Change
Emmie Bluff: No Change
Processing Plant: No Change
No Change
No Change
Stage 1: Flotation
No Change
Stage 2: Hydromet
No Change
No Change
Copper: 337.0 kt
Cobalt: 18.4 kt
Silver: 14.3 Moz
Zinc: 54.2 kt
Partial redirection of tails to grout plant to be constructed at
Emmie Bluff. Tails to be mixed with cement and pumped
underground to fill grout bags.
Scope to investigate larger scale underground tails backfill to
reduce surface footprint and associated environmental
impact of tailings storage.
No Change
No Change
For full details, see “Scoping Study Update Delivers Materially Improved Economics”, released to market on 30 January 2024 and available at
https://www.codaminerals.com/wp-content/uploads/2024/01/20240130_Coda_ASX-ANN_Scoping-Study-Update-Delivers-Materially-ImprovedEconomics_RELEASE.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Table 5: Scoping Study Financial Summary Table
Unit
January 2024
March 2024
12.75
3
96%
4%
307
16.9
25,400
1,300
306
354
660
540
14
3
96%
4%
337
18.4
25,700
1,338
306
358
664
521
1.25
0
0%
0%
30
1.1
300
38
0
4
4
-19
Difference
Years
Mtpa
%
%
Kt
Kt
t
t
A$M
A$M
A$M
A$M
All In Sustaining Cost13
USD/lb Cu
1.6
1.73
0.13
Revenue
Net Cash Flow (Pre-Tax)
Net Present Value (NPV8)
Internal Rate of Return (IRR)
Total Capital Payback15
A$M
A$M
A$M
%
Years
6,040
1,674
735
26.6%
4.5
6,622
1,755
826
30.6%
4.25
582
81
91
4.0%
-0.25
Capital
Production
Mine Life
Ore Process Rate
Feed from Indicated Resource
Feed from Inferred Resource
Copper Produced – Total Mined
Cobalt Produced – Total Mined
Copper – Steady State Average12
Cobalt – Steady State Average
Pre-Production Capital
Post-Production Capital
Total Capital
Total Financing Requirement
Operating
Measure
Scoping Study
Update
Financials
(Pre Tax)14
Area
Scoping Study
Update
MT Survey Results
On the 13th of February16, Coda released results from 2D and 3D inversions of MT data collected in the second half of
2023. The results showed very strong correlation between known Tapley Hill Formation black shale at Emmie Bluff and
modelled low-resistivity anomalism, while also providing strong evidence for an additional shale body located to the east
of Emmie Bluff, further supporting similar indications from preexisting 2D seismic and ANT datasets.
12
Steady State average is calculated from year 4 to year 14
13 All-In Sustaining Cost (AISC) includes all mining, processing, tailings management, transport including freight, sustaining capital, royalties & G&A
costs
14 Including royalties
15 Capital payback is calculated from first production
16 Please see “MT Data Reinforces Evidence for Emmie Bluff Extension”, available at https://www.codaminerals.com/wpcontent/uploads/2024/02/20240213_Coda_ASX-ANN_MT-Data-Reinforces-Evidence-for-Emmie-Bluff-Extension_RELEASE.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Figure 7 Orthographic view showing currently understood extent of Tapley Hill Formation black shale at Emmie Bluff (yellow) as well
as the 3D resistivity inversion of the recent MT survey (brown) and 2D resistivity inversion point data (<2.2 Ohm.m). The 3D resistivity
model is filtered to show very low resistivity anomalism (<2.6 Ohm.m). Note the strong correlation between known Tapley Hill
Formation and MT anomalism on the western boundary, but the extension of low resistivity material to the east. 2D inverted low
resistivity material to the south not resolved in the 3D inversion lines up with previous interpretation of southern extension of Tapley
Hill Formation black shale by Mira Geoscience17.
Fieldwork was undertaken in mid-2023 with final reports and interpretation deliver to Coda in January 2024. 61 stations
were selected along 5 transects to the southeast of earlier MT transects collected in 2010. A total of 60 new soundings
and 3 repeat soundings were collected for a total of 123 recent and historical stations across 11 SE/NW oriented transects.
These stations were collectively 3D inverted, with confirmatory 2D inversions run across 3 of the transects.
The final model showed a very high conductivity anomaly tightly correlated with known Tapley Hill Formation black shale.
(Figure 7). The western boundary of the shale (as determined by drilling and 2D Seismic) is sharply defined by MT,
providing high-confidence calibration of the technique and confirming the ability of this type of geophysics to accurately
discriminate the high-conductivity Tapley black shale. To the east however, low-resistivity a
Share your feedback
Discover