QUARTERLY ACTIVITIES REPORT
Elizabeth Creek Project in South Australia advancing towards Pre-Feasibility Study,
following key flowsheet improvements and with approvals pathway locked in.
HIGHLIGHTS
Elizabeth Creek – Copper-Cobalt Project (South Australia)
-
Exceptional Copper Recoveries: Whole ore leach testing achieved copper recoveries
of 92.5% (catalysed ammonia) and 95.9% (ammonium chloride), materially
improving on the 82.8% average from flotation-based flowsheets in current base
case.
-
Silver Uplift: Silver recoveries reached up to 97.3% using the ammonium chloride
leach, again, far exceeding prior assumptions and boosting potential project
economics.
-
Reduced Complexity & Costs: Both leach processes have the potential to simplify
processing of mineralisation from Emmie Bluff, lowering both CAPEX and OPEX.
-
Approvals Pathway Advancing: A Draft Scoping Report was submitted to DEM postquarter, establishing a transparent and fixed environmental approvals path for
Elizabeth Creek.
Use of Funds
Upcoming Work Programmes
4
5
Events
Subsequent to
Quarter End
Appendix 1
-
Flow Sheet Optimisation Underway: Coda is progressing metallurgical testwork to
select a preferred leaching technology for pre-feasibility study (PFS) assessment.
-
PFS Advancement: Multiple parts of the PFS scope, plan, and budget completed with
finalisation of tenders for key work programmes including processing and process
engineering, mine design, metallurgy, and infrastructure. Key workstreams, including
hydrogeology commenced in the current Quarter.
Corporate
- $3.96 million in cash on hand as at 30 June 2025.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN: 49 625 763 957
1. Overview
Discussing the quarter, Coda Minerals Chair, Keith Jones, said: “The June Quarter has been a period of strong technical
momentum for Coda, with meaningful progress made on multiple fronts at our flagship Elizabeth Creek Project.
“A particular highlight this quarter has been the breakthrough metallurgical results achieved from using from whole-ore
leach testwork. Using mineralised material from the Emmie Bluff deposit, our technical team trialled two innovative
oxidative leach techniques. Both delivered copper recoveries of over 92%, with the highest reaching nearly 96%—a
significant uplift compared to our existing flotation-based assumptions. The results also included silver recoveries up to
97%, offering a step-change improvement to our metal recovery profile.
“These encouraging outcomes point to the potential for a simplified, lower-cost flowsheet that could unlock substantial
value as we progress Pre-Feasibility Study (PFS) work. The PFS scope, plan, and budget has been materially finalised and
critical path items already well underway.
“Subsequent to the end of the quarter, we reached another important milestone with the submission of our Draft Scoping
Report to the South Australian Government. Once accepted, this report will formalise our project-specific environmental
terms of reference, providing Coda with a transparent and stable approvals pathway towards securing a Mining Lease.
“Our strategy is to advance the Elizabeth Creek Project through the study phases and position the Company to capture
the value uplift typically seen in more advanced peers as they have progressed their own projects toward development.
Recent M&A in the junior copper sector provides some insights into the compelling returns that can be achieved by
advancing quality assets like Elizabeth Creek down the development pathway.”
Figure 1 Liquor samples collected during metallurgical test work. Please note this is illustrative only, does not constitute an
exploration result and no information can be inferred from the picture.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
2. Projects & Assets
2.1 Tenement Schedule
In accordance with ASX Listing Rule 5.3.3, Coda provides the following information about its tenements for the quarter ended 31 December 2024.
Table 1 Coda tenement schedule
Grant Date
Expiry Date
Area
km2
Ownership
SA
29 October 2017
28 October 2028
47
100%
Elizabeth Creek
SA
25 March 2020
24 March 20251
363
100%
Elizabeth Creek
Elizabeth Creek2
Cameron River
Cameron River
Kinloch
Kinloch
Kinloch
Kinloch
SA
SA
Queensland
Queensland
SA
SA
SA
SA
7 October 2018
17 October 2023
10 October 2019
14 February 2020
7 December 2023
13 December 2023
18 December 2023
18 December 2023
6 October 2029
16 October 2029
9 October 2029
13 February 2030
6 December 2029
12 December 2029
17 December 2029
17 December 2029
291
73
22.4
12.8
854
990
555
785
100%
100%
100%
100%
25%
25%
25%
25%
Tenement
Project
Location
EL 6141
Elizabeth Creek
EL 6518
EL 6265
EL 6945
EPM 27042
EPM 27053
EL 6962
EL 6963
EL 6964
EL 6965
Application Date
Tenements are held in a 70:30 split between Coda
Minerals and Torrens Mining Ltd, a wholly owned
subsidiary of Coda Minerals, resulting in effective
100% control by Coda Minerals.
Held 100% by Coda Minerals.
Coda recently completed formal transfer of 100%
of the Cameron River project.
Held in a 25:75 split with Boss Energy. Coda has
100% base metals rights for the ground.
1 A renewal application for EL 6518 was lodged with the SA DEM on the 5th of February 2025, in line with standard renewal procedures. All tenement obligations have been met, and the Company anticipates renewal
will be authorised in the coming weeks.
2 Tenure is adjacent to Elizabeth Creek but has not been formally integrated into the broader Elizabeth Creek Project.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Emmie Bluff Metallurgy (Whole Ore Leach)3
During the June Quarter, Coda’s technical team were focussed primarily on metallurgical improvements based
on whole ore leaching, with the interim results of this work released in June.
Mineralised material from the Emmie Bluff deposit was used to trial two whole-ore leach methods, both of
which delivered encouraging results, with short leach times and copper recoveries substantially exceeding those
assumed during the Company’s most recent Scoping Study.
The first method, catalysed ammonia oxidative leach (using a readily available, low-cost catalyst) achieved 92.5%
copper recovery and 51% silver recovery. The second method, ammonium chloride and air oxidative leach
achieved 95.9% copper recovery and 97.3% silver recovery. This represents a 14.5% boost over the flotation and
Albion Process flowsheet that the company assessed during the most recent iteration of its project Scoping
Study.
These compare favourably to the 82.8% average copper recovery from previous testwork utilising flotation and
assuming Albion downstream processing. Both methods are near-neutral or alkaline, making them well-suited
to the carbonate-rich Emmie Bluff ore. In addition to suggesting the potential to improve overall recoveries, by
processing the full ore stream directly—without prior flotation—these approaches both offer the potential to
lower both the company’s assumed capital and operating costs, and flowsheet complexity.
Recovery Curve - Cu
Cu Extraction (%)
ELIZABETH CREEK
2.2 Elizabeth Creek Project
100
90
80
70
60
50
40
30
20
10
0
Catalysed
Ammonia
Leach
Ammonium
Chloride
Leach
0
1
2
3
4
5
6
7
8
Hours
Figure 2 Copper recovery curves under the two oxidative leach processes under consideration.
3 This section is adapted from an ASX announcement released 26 June 2025. Please see here for full details including JORC Table 1:
https://www.codaminerals.com/wp-content/uploads/2025/06/20250626_ANN_Coda_Material-Uplift-in-Copper-and-SilverRecoveries_vRelease.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Cu Extraction (%)
ELIZABETH CREEK
Recovery Curve - Ag
100
90
80
70
60
50
40
30
20
10
0
Catalysed
Ammonia,
Reductive
Leach
Residue
Ammonium
Chloride
Oxidative
Leach
0
1
2
3
4
5
6
7
8
Hours
Figure 3 Silver recovery curves via ammonium thiosulphate reductive leach of the residues from the catalysed
ammonia leach process and ammonium chloride oxidative leach of whole ore.
Emmie East Drill Results4
During the quarter, the company also released the assay results from the Emmie East drilling which was
undertaken in the March quarter of this year. Results were in line with expectations based off visuals
previously released to market, with the only
reported mineralised interval being 0.76m @
0.81% Cu from 435.6m in drillhole DD25EB0038.
2.3 Future Work Programme
Coda is continuing to advance metallurgical
flowsheet optimisation over the coming quarter,
to determine its preferred leaching technology,
which will be taken through to a PFS level study.
Short term priorities will include ongoing work on
cobalt recovery and optimisation of the oxidative
leach step, as well as determination of CAPEX and
OPEX associated with the selected flowsheet.
Several key components of the PFS scope,
planning, and budgeting have been completed,
including the finalisation of tenders for critical
work programmes, including processing, process
engineering, mine design, metallurgy, and
infrastructure. In addition, major workstreams,
including hydrogeological studies, commenced
during the September quarter and remain
ongoing.
Figure 4, Left Recent drilling completed at Emmie East.
Only drillhole DD25EB0038 was submitted for assay.
4 This section is adapted from an ASX announcement released 26 June 2025. Please see here for full details including JORC Table 1:
https://www.codaminerals.com/wp-content/uploads/2025/06/20250626_ANN_Coda_Material-Uplift-in-Copper-and-SilverRecoveries_vRelease.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
3. Corporate
3.1 Finance & Use of Funds
Pursuant to ASX Listing Rule 5.3.2, the Company confirms that there were no mining production and
development activities during the quarter by the Company.
Total cash outflow from operating activities for the quarter was $0.97 million. This included $0.61 million in
exploration and evaluation expenditure which included the final portion of the drilling programme and on-going
metallurgical work, as well as corporate administration costs of $0.40 million. Coda received interest on cash
balances of $38k during the quarter.
During the quarter ended 31 March 2025, a total of $131k was paid to the Directors of the Company as
remuneration including non-executive director fees and salary paid to the CEO & Executive Director. Please refer
to Section 6.1 of the Appendix 5B below.
During the quarter, the Company issued 671,687 shares to settle the 50% of Directors’ fees payable to the NonExecutive Chair and the Non-Executive Directors of the Company for the period 1 October 2024 to 31 March
2025. The issue of shares was based on the 10-day volume weighted average price up to the end of each quarter.
The Company expects to continue to issue shares in lieu of 50% of the Directors fees for the 30 June 2025 quarter
and going forward.
The Company ended the quarter with $3.96 million in cash and cash equivalents and will continue to further its
exploration and evaluation activities over the coming periods.
4. Events Subsequent to Quarter-End
On the 11th of July, Coda announced that it had submitted a Draft Scoping Report for the Elizabeth Creek CopperCobalt Project to the South Australian Department for Energy and Mining (DEM)5. This report is a key step along
the approvals pathway in South Australia, and following review and acceptance by the South Australian
Government, will define as a formal agreement between Coda and the State the project specific scope of
environmental studies and data collection required prior to the grant of a Mining Lease. This will give secure
Coda a fixed, transparent pathway to project approvals, lowering the risks which can be associated with this
critical step in project development.
5 Please see “Key Approvals Milestone Achieved at Elizabeth Creek”, released 11 July 2025, available at https://www.codaminerals.com/wp-
content/uploads/2025/07/20250711_ANN_Coda_Key-Approvals-Milestone-Achieved-at-Elizabeth-Creek_vRelease.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
This announcement has been authorised for release by the Board of Coda Minerals Ltd
Further Information:
Chris Stevens
Chief Executive Officer
Coda Minerals Limited
info@codaminerals.com
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
5. Appendix 1
5.1 Elizabeth Creek Mineral Resources
Table 2 Aggregated Mineral Resources at Elizabeth Creek
OPEN PIT
Resource
Category
Type
Proposed
Tonnage
Cut-off
Mining
Mt
Grade
Method
Copper
Cobalt
Silver
Zinc
Grade
Contained
Grade
Contained
Grade
Contained
Grade
Contained
Grade
Contained
(% Cu)
Metal (t)
(ppm Co)
Metal (t)
(g/t Ag)
Metal (Moz)
(ppm Zn)
Metal (t)
(% CuEq)
Metal (t)
1.7%
30,600
684
4000
1.4%
249,100
1.4%
316,000
MG14
Indicated
Zambian
Open Pit
1.8
0.5% CuEq
1.2%
22,700
330
600
14
0.8
CaUle Grid South
Inferred
Breccia
Open Pit
5.8
0.2% Cu
0.6%
36,000
120
700
3.5
0.7
Windabout
Indicated
Zambian
Open Pit
17.7
0.5% CuEq
0.8%
136,100
490
8700
8
4.6
Sub Totals
Indicated
Zambian
Open Pit
19.5
0.5 CuEq
0.8%
158,800
480
9300
8.5
5.4
(Open Pit)
Inferred
Breccia
Open Pit
5.8
0.2% Cu
0.6%
36,000
120
700
3.5
1
Proposed
Tonnage
Cut-off
Mining
Mt
Grade
UNDERGROUND
Resource
Category
Type
Method
Copper Equivalent
Copper
Cobalt
684
Silver
36,0006
4,000
Zinc
Copper Equivalent
Grade
Contained
Grade
Contained
Grade
Contained
Grade
Contained
Grade
Contained
(% Cu)
Metal (t)
(ppm Co)
Metal (t)
(g/t Ag)
Metal (Moz)
(ppm Zn)
Metal (t)
(% CuEq)
Metal (t)
Indicated
Zambian
Underground
37.5
1% CuEq
1.3%
485,000
590
22,000
17
20.6
1800
66000
1.9%
715,000
Emmie Bluff
Inferred
Zambian
Underground
2.7
1% CuEq
0.9%
46,000
280
1,000
12
1.1
1700
5000
1.3%
36,000
Sub Total
(Underground)
Combined Zambian
Underground
40.2
1% CuEq
1.3%
511,000
570
23,000
16.8
21.7
1700
70000
1.9%
751,000
Project Wide Total7
65.5 Mt
725,800t Contained Cu
33,000t contained Co
28 Moz Contained Ag
75,000t Contained Zn8
1,067,000t contain CuEq
6 No Copper Equivalent was calculated for Cattle Grid South. Contained CuEq tonnes quoted in this column for Cattle Grid South consist of contained copper only.
7 Total figures have been aggregated purely for convenience and to contextualise the specific contribution of individual Mineral Resource Estimates to the overall project scale. Grades reported are tonnage-weighted
averages of the individual Mineral Resource Estimates. Coda notes that the total figure includes resources reported at varying cut-off grades, with varying estimation techniques, metallurgical properties and proposed
mining methods. Individual Mineral Resource Estimates should be considered individually. A total copper equivalent figure has not been disclosed as Coda does not believe it is currently appropriate to calculate a
copper equivalent for the Cattle Grid South Mineral Resource Estimate. Please see below sections Statement Regarding Metal Equivalent Calculations and Competent Persons Statement for full details on the calculation
of copper equivalents and links to original releases/CP statements. Figures have been rounded for simplicity.
8 No Zinc estimate was provided for the MG14 and Windabout deposits. This figure reflects the contained tonnage solely from Emmie Bluff and Cattle Grid South.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
5.2 Competent Persons’ Statements and Confirmatory Statement - Mineral
Resource Estimates
MG14 Indicated Mineral Resource: The information is extracted from the report entitled "Confirmation
Statements JORC" created on 26th October 2020 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-022989156A1003162&v=70bc033a22188bdfefb8a0b8ad3c24897ef2837d.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
Windabout Indicated Mineral Resource: The information is extracted from the report entitled "Confirmation
Statements JORC" created on 26th October 2020 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-022989156A1003162&v=70bc033a22188bdfefb8a0b8ad3c24897ef2837d.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
Emmie Bluff Mineral Resource: The information is extracted from the report entitled “Scoping Study Update
Delivers Materially Improved Economics" created on 30 January 2024 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-02766550-6A1191314.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
Cattle Grid South Mineral Resource: The information is extracted from the report entitled “Initial Copper
Resource for Cattle Grid South" created on 03 July 2024 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-028239896A1214274&v=4015c7b87631faf94ecd96975272ff9ad5cb14c3.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
5.3 Listing Rule 5.19.2
In relation to any Production Target or any forecast financial information based on any Production Target quoted
or referenced in this announcement, the Company confirms that all material assumptions underpinning both
the Production Target and any forecast financial information continue to apply and have not materially changed.
The original ASX announcement released on 3 December 2024 relating to any Production Target or forecast
financial information derived from any Production Target referenced within this announcement can be found
here.
5.4 Listing Rule 5.23.2
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements cited in this announcement and, in the case of estimates of
Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are presented have not
been materially modified from the original market announcement.
5.5 Statement Regarding Metal Equivalent Calculations
Metal Equivalent grades are quoted for one or more of the Emmie Bluff, Windabout and MG14 Mineral
Resources, or for exploration results considered by the company to be related directly to one of these Mineral
Resources, in this announcement.
For the Emmie Bluff Mineral Resource:
The Emmie Bluff Mineral Resource is reported as 40.2Mt @ 1.27% Cu, 569 ppm Co, 16.8 g/t Ag and 0.17% Zn
(1.87% Copper Equivalent (CuEq)) reported at a cut-off grade of 1% CuEq. The calculation of this metal equivalent
is based on the following assumptions.
Metal
Copper
Cobalt
Zinc
Silver
Coefficient
0.8
0.85
0.9
0.85
Forecast Price
$7,000
$55,000
$2,100
$18.50
Price Unit
USD/Tonne
USD/Tonne
USD/Tonne
USD/Oz
Price assumptions used when calculating copper equivalent grades were based primarily on Consensus
Economics forecasts of metals, except for Cobalt, which was sourced via communication with subject matter
experts. Metallurgical assumptions used when calculating copper equivalent grades were based on a simple bulk
float utilising rougher and minimal cleaner/scavenger circuits. The produced a reasonably consistent mean
recovery across most metals of between approximately 83 and 94 percent. For simplicity, and to in part account
for losses associated with less intensive cleaner floats and losses to the hydromet plant, these figures were
rounded down to the nearest 5%.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝑢𝐸𝑞% = 𝐶𝑢% + 0.00068 × 𝐶𝑜 𝑝𝑝𝑚 + 0.337 × 𝑍𝑛 % + 90.3 ×
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
𝐴𝑔 𝑝𝑝𝑚
10000
ELIZABETH CREEK
For the Windabout and MG14 Mineral Resource:
The Windabout and MG14 Mineral Resource are reported at a cut-off grade of 0.5% CuEq as:
•
•
Windabout: 17.67Mt @ 0.77% Cu, 492 ppm Co and 8 g/t Ag (1.41% CuEq)
MG14: 1.83Mt @ 1.24% Cu, 334 ppm Co and 14 g/t Ag (1.84% CuEq)
The calculation of this metal equivalent is based on the following assumptions.
Metal
Copper
Cobalt
Mining
Recovery %
0.9
0.9
Dilution %
Recovery %
Payability %
Forecast Price
Price Unit
0.05
0.05
0.6
0.85
0.7
0.75
$6,600
$55,000
USD/Tonne
USD/Tonne
Price assumptions used when calculating copper equivalent grades were based on recent historical metal prices
at the time of calculation (2018). Metallurgical assumptions are based on extensive metallurgical testwork
undertaken on the two deposits to 2018 across various potential flowsheets involving both floatation and
leaching. Ag analyses in the estimation and metallurgical testwork were considered insufficient at the time to
include in the metal equivalent calculation.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝑢𝐸𝑞% = 𝐶𝑢% + 0.0012 × 𝐶𝑜 𝑝𝑝𝑚
It is the opinion of the company that both sets of prices used in the calculations are reasonable to conservative
long-term forecasts for real dollar metal prices during the years most relevant to the deposits (approx. 20262030).
It is the opinion of the company that all of the elements included in the metal equivalent calculations have a
reasonable potential to be recovered and sold.
For full details of the Emmie Bluff Metal Equivalent calculation, please see “Scoping Study Update Delivers
Materially Improved Economics”, released to the ASX on 30th January 2024 and available at
https://www.codaminerals.com/wp-content/uploads/2024/01/20240130_Coda_ASX-ANN_Scoping-StudyUpdate-Delivers-Materially-Improved-Economics_RELEASE.pdf.
For full details of the MG14/Windabout Metal Equivalent Calculation, please see “Confirmation of Exploration
Target & Mineral Resource and Ore Reserve Statement”, released to the ASX on 23rd October 2020 and available
at https://www.codaminerals.com/wp-content/uploads/2020/10/20201026_Coda_ASX-ANN_ConfirmationStatements-JORC.pdf.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
5.6 Forward Looking Statements
This announcement contains ‘forward-looking information’ that is based on the Company’s expectations, estimates
and projections as of the date on which the statements were made. This forward-looking information includes, among
other things, statements with respect to the Company’s business strategy, plans, development, objectives,
performance, outlook, growth, cash flow, projections, targets and expectations, mineral reserves and resources, results
of exploration and related expenses. Generally, this forward-looking information can be identified by the use of
forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘potential’, ‘likely’, ‘believe’, ‘estimate’,
‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’, ‘evolve’ and similar expressions.
Persons reading this announcement are cautioned that such statements are only predictions, and that the Company’s
actual future results or performance may be materially different. Forward-looking information is subject to known and
unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of activity,
performance or achievements to be materially different from those expressed or implied by such forward-looking
information.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Coda Minerals Ltd
ABN
Quarter ended (“current quarter”)
49 625 763 957
June 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
-
-
(612)
(1,925)
(b) development
-
-
(c) production
-
-
(d) staff costs
(122)
(890)
(e) administration and corporate costs
(273)
(1,236)
-
-
38
168
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(969)
(3,883)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(8)
(12)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets – Deposits
2
2
(f)
(1)
(1)
other non-current assets – Deposits
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(7)
(11)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
5,091
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(539)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (Lease payment including interest)
(28)
(122)
3.10
Net cash from / (used in) financing
activities
(28)
4,430
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4,967
3,427
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(969)
(3,883)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(7)
(11
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(28)
4,430
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(12 months)
Share your feedback
Discover