March 2023 Quarterly Activities and Cashflow Reports
Released
Released
Announcement PDF
ASX RELEASE
27 April 2023
ASX Code: COD
QUARTERLY
ACTIVITIES REPORT
FOR THE QUARTER ENDED 31 MARCH 2022
HIGHLIGHTS
CONTENTS
1.0
Overview
2.0
Projects & Assets
2.1
Tenement
Schedule
2.2
Elizabeth Creek
Copper Project
Update
2.3
Cameron River
Exploration
Activities and
Results
2.4
Future Work
Programme
3
Corporate
3.1
Finance &
Use of Funds
4
Events
Subsequent to
Quarter End
• Elizabeth Creek – Copper-Cobalt Project (South Australia)
- Pivotal Scoping Study demonstrates robust economics from the development of a
low-technical risk operation in Tier-1 location.
-
Key Scoping Study highlights include:
o Average forecast steady-state annual production of approximately 25,000tpa
copper and 1,000tpa cobalt at a lifetime average grade of 1.86% CuEq (1.29%
Cu and 515ppm Co).
o Pre-production CAPEX of approximately $277 million. Payback period for total
capital of approximately 4.75 years (pre-tax).
o Estimated pre-tax NPV8 of approximately $570 million and 26.5% IRR.
o Total pre-tax revenue of approximately $5.73 billion over the life-of-mine.
• Elizabeth Creek – IOCG (South Australia)
- Tight-spaced gravity survey completed over Emmie IOCG and Ambient Noise
Tomography (ANT) geophysical survey completed over Emmie IOCG and Elaine.
- Detailed interpretation of Emmie IOCG ANT results released subsequent to quarterend, transforming the Company’s understanding of the IOCG opportunity and the
potential for extensions to the shallower Emmie Bluff copper-cobalt mineralisation.
• Corporate
- Coda Minerals remains well-funded to continue to progress the Elizabeth Creek
Project with $5.95 million cash on hand as at 31 March 2023.
- Strategic partner discussions continued regarding the future development of
Elizabeth Creek.
• Upcoming Milestones
- 3D geologically-constrained gravity inversion underway for Emmie IOCG with results
expected in the June Quarter.
- PFS work formally approved by the Board with ongoing work in June Quarter to
include:
o Ongoing flowsheet optimisation and XRF ore sorting study.
o Mechanical cutting underground mining study.
o Baseline environmental studies.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN: 49 625 763 957
1. Overview
Coda Minerals Chair, Keith Jones, said: “The Elizabeth Creek Copper Project Scoping Study published during the quarter
marked a huge milestone for Coda. Coda listed just two and a half years ago and in that time our team has delineated
two small-scale open pit deposits, discovered the flagship Emmie Bluff copper-cobalt Resource, delivered a robust Scoping
Study and made a significant IOCG copper-gold discovery.
“This is an enormous achievement in such a short period of time which positions Coda Minerals for growth and success in
the years ahead – against the backdrop of surging demand for copper as a key enabler of global decarbonisation.
“The Scoping Study demonstrated robust economics and a long-life, technically viable, low risk operation as the
foundational asset for Coda Minerals. Through this study, Coda’s team has established a viable go-forward processing
flowsheet as well as mineability across all three deposits.
“Pre-production CAPEX is just $277 million, peak net-debt of $438 million, and a pre-tax IRR of 26.5%. The Study indicates
that Emmie Bluff, Windabout and MG14 have one of the lowest capital intensities and highest rates of return of any
copper development project in Australia.
“The board has also approved a programme of Pre-Feasibility work that is designed to focus on key value uplift
opportunities within the Elizabeth Creek study, including the use of mechanical cutting underground and ore sorting
technology – these have the potential to materially further increase project economics. Field based environmental
monitoring work, approvals and heritage surveys are also underway.
“Located in South Australia, the world’s premier mining jurisdiction, close to both Carrapateena and Oak Dam West –
BHPs flagship copper assets – Elizabeth Creek boasts not only a robust go-forward copper-cobalt project but also
exceptional exploration potential.
“Our exploration team made substantial progress in advancing our Tier-1 IOCG exploration opportunity by undertaking
two significant geophysical surveys. The results of the first survey, released subsequent to quarter- end, have materially
enhanced our understanding of the structures controlling our two flagship assets, Emmie Bluff (sedimentary coppercobalt), and Emmie IOCG (copper-gold).
“The ANT geophysical survey combined with our drilling results has changed our interpretation of the structures
controlling the IOCG mineralisation providing exciting new drilling targets. The ongoing gravity survey inversions are
designed to further refine and support this updated targeting, with final results expected towards the end of the June
Quarter.
“Coda’s ongoing work programme will enhance both our pre-production and exploration assets over the next quarter.”
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
2. Projects & Assets
2.1 Tenement Schedule
In accordance with ASX Listing Rule 5.3.3, Coda provides the following information about its tenements for the quarter ended 31 March 2023.
Table 1 Coda tenement schedule
Grant Date
Expiry Date
Area
km2
Ownership
Ownership Structure
SA
29 October 2017
28 October 2022
47
100%
Elizabeth Creek
SA
25 March 2020
24 March 20221
363
100%
EL6265
EPM27042
Elizabeth Creek
Cameron River
SA
Queensland
7 October 2018
10 October 2019
6 October 2023
9 October 2024
291
22.4
100%
51%2
EPM27053
Cameron River
Queensland
14 February 2020
13 February 2025
12.8
51%3
Tenements are held in a 70:30 split between Coda
Minerals and Torrens Mining Ltd, a wholly owned
subsidiary of Coda Minerals, resulting in effective
100% control by Coda Minerals.
Coda is currently engaged in a Farm-in to the
Cameron River project and has the option to earn
up to 80% ownership by spending $2 million. The
company has reached the threshold for 51%
ownership under the Agreement.
EL5455
ELA7342
ELA7584
ELA6263
Club Terrace
Club Terrace
Club Terrace
Club Terrace
Victoria
Victoria
Victoria
NSW
19 August 2020
18 January 2021
22 October 2013
29 August 2022
29 August 2022
3 August 2021
21 October 2023
28 August 2027
28 August 2027
3 August 2027
8
375
108.5
260
100%
100%
100%
100%
EL7637
Balmoral
Victoria
17 June 2021
29 August 2022
28 August 2027
835
100%
EL2690
Rigo
Papua New
Guinea
26 January 2022
26 January 2024
1164
100%
ELA2022/00112
Booleroo
SA
14 November 2022
N/A (Under
review)
N/A (Under
review)
202
N/A
Application made wholly by Coda Minerals.
ELA2557
Laloki
Papua New
Guinea
16 November 2017
N/A (refused)
N/A (refused)
126
N/A
Application by wholly owned subsidiary Torrens
Mining (PNG) Limited.
Tenement
Project
Location
EL6141
Elizabeth Creek
EL6518
Application Date
Held by wholly owned subsidiary Torrens Mining
Ltd
Held by wholly owned subsidiary Torrens Mining
Ltd
Held by wholly owned subsidiary Torrens Mining
(PNG) Limited
Under Application
1
Currently under renewal application
2 Note tenement transfer is ongoing as at current time
3 Note tenement transfer is ongoing as at current time
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
2.2 Elizabeth Creek Copper-Cobalt Project Update
Elizabeth Creek Copper Cobalt Project Scoping Study
In March 2023, Coda released the results of the Elizabeth Creek Copper-Cobalt Project Scoping Study, which outlined an
economically robust, long-life project with potential to further improve on several key metrics. The project has a relatively
low CAPEX by comparison to its peers, and has a competitive AISC of US$2.13/lb Cu produced, with an approximate pretax NPV8 of $570M and an IRR of 26.5%.
A brief summary of key study results and metrics is provided below, however full details, including all associated caveats
and disclosures, is available at https://www.codaminerals.com/downloads/scoping-study.
Mining
Mining will consist of conventional open-pits at the Windabout and MG14 deposits and an underground, long-hole open
stope operation at Emmie Bluff. Production Targets for each deposits are set out in Table 2 and Figure 1, below. 0All
mining has been assumed to be undertaken by contractors.
Processing
Coda will take a phased approach to mineral processing at Elizabeth Creek. MG14 will be the first deposit mined, during
the construction and commissioning of the downstream processing plant. Material from MG14 will be processed in a
nominal 2.5 Mtpa capacity flotation concentrator as part of Phase 1. The concentrate produced will be directly sold into
the market without further downstream processing.
Later, material produced form Windabout and Emmie Bluff will be concentrated through the same flotation plant before
being further processed through a downstream hydrometallurgical plant as part of Phase 2. This downstream plant will
be centred around the Albion Process atmospheric leach technology, and will produce copper cathode via SX/EW and
battery grade cobalt sulphate as co-products, with zinc carbonate and silver dore produced as by-prodcuts. Anticipated
steady state production of co-products is approximately 25 ktpa Cu and 1 ktpa Co.
Infrastructure
Elizabeth Creek is already well served by transport and power infrastructure in particular, and the Scoping Study envisions
that minimal additional work will be required to upgrade these elements. An approximately 40km long haul road will be
required to ship open pit mine to the concentrator at Emmie Bluff, with electrical transmission lines running parallel to
this road having been connected at the Mt Gunson substation. The study also assumes a nominal 12 hole water borefield
for onsite extraction of groundwater and a 450 bed camp, which is expected to be sufficient for both construction and
ongoing operations.
Table 2 Mineral Resources underpinning the Elizabeth Creek Copper Cobaklt Project Scoping Study
Deposit
Name
Mining
Method
Resource
Category
Resource
Production Target
MG14
Open Pit
100% Indicated
1.83 Mt @ 1.24% Cu, 0.03% Co (1.67% CuEq) 1.26Mt @ 1.42% Cu, 0.04% Co (1.87% CuEq)
Windabout
Open Pit
100% Indicated
17.67 Mt @ 0.77% Cu, 0.05% Co (1.41% CuEq) 5.96Mt @ 1.03% Cu, 0.07% Co (1.71% CuEq)
Emmie Bluff
Underground 90% Indicated, 43.3 Mt @ 1.30% Cu, 0.05% Co (1.84% CuEq)* 26.2Mt @ 1.42% Cu, 0.04% Co (1.86% CuEq)
10% Inferred
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
3,500,000
3.50%
3,000,000
3.00%
2,500,000
2.50%
2,000,000
2.00%
1,500,000
1.50%
1,000,000
1.00%
500,000
0.50%
0
0.00%
MG14
Emmie Bluff - Indicated
Emmie Bluff - Inferred
Windabout
Phase 1 - Indicated CuEq Grade %
Phase 2 - Inferred CuEq Grade %
CuEq %
Tonnes Mined
Mined Production by Mineral Resource Category, Elizabeth
Creek
Phase 2 - Indicated CuEq Grade %
Figure 1 The anticipated mined production schedule for all three deposits by Resource Categorisation. CuEq% for MG14 and Windabout
is calculated as CuEq% = Cu% + 0.0012 × Co ppm. CuEq% for Emmie Bluff is calculated as CuEq% = Cu% + 0.00068 × Co ppm + 0.337 × Zn % + 90.3
× (Ag ppm)/10000. Mined production exceeds nominal plant capacity in several years. Equipment is scoped on the basis of Emmie Bluff
ore, which represents the majority of the project’s feed ore. Ores sourced from the MG14 and Windabout open pits have different
comminution properties and, in the case of Windabout, lose significant mass in the deslime step prior to being processed downstream.
This allows equipment to exceed nominal nameplate capacity in those years. There is a low level of geological confidence asso ciated
with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated
Mineral Resources or that the production target itself will be realised.
Costs and Key Economic Metrics
The Scoping Study makes macroeconomic assumptions as set out in Table 4, and delivers the results summarised as Table
3.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Table 4 Economic assumptions underpinning the Elizabeth Creek Copper
Cobalt Project Scoping Study
Unit
LOM
Area
Unit
Assumption
Mine Life
Years
14
Discount Rate
%
8.0%
Ore Process Rate
Mtpa
2.5
Exchange Rate
USD:AUD
0.68
Feed from Indicated Resource
%
94%
Tax Rate
%
30%
Feed from Inferred Resource
%
6%
Royalty Rates
Refined Product
3.5%
Copper Produced
Kt
317
Concentrate
5.0%
Cobalt Produced
Kt
14.4
Copper Price
USD/tonne
$8,800
Capital
Pre-Production Capital – Phase 1
A$M
277
Cobalt Price
USD/tonne
$60,627
Post-Production Capital – Phase 2
A$M
320
Silver Price
USD/Oz
$21
Zinc Price
USD/tonne
$2,700
Operating
Table 3 Summarised results of the Elizabeth Creek Copper Cobalt
Project Scoping Study
C1 Cash Cost
USD/lb Cu
1.88
All In Sustaining Cost
USD/lb Cu
2.19
Revenue
A$M
5,728
Net Cash Flow (Pre-Tax)
A$M
1,298
Net Present Value (NPV8)
A$M
570
Peak negative Cash Flow
A$M
438
Internal Rate of Return (IRR)
%
26.5%
Capital Payback5
Years
4.75
Financials (Pre Tax)4
Production
Area
Measure
Sensitivity Analysis
Sensitivity analysis was carried out to determine the impact of various factors on the Project’s financial performance. The
following factors were flexed:
•
•
•
•
Exchange Rate
Copper Revenue (Price, Recovery or Grade)
Cobalt Revenue (Price, Recovery or Grade)
Silver Revenue (Price, Recovery or Grade)
•
•
•
•
Discount Rate
Project CAPEX
Mining OPEX
Processing OPEX
Figure 2, below, illustrates how the estimated base case NPV ($570M) varies when each of the above factors increases
or decreases by 20%.
4 Including Royalties
5 Capital payback is calculated from first production.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Figure 2 Project pre-tax NPV sensitivity to key variables. Please note that the above chart does not account for correlation
between variables and the model remains ceteris paribus.
The figure shows how the estimated base case pre-tax NPV of $570M varies using 20% higher and 20% lower assumptions
for the key input variables. The Project is most sensitive to exchange rates, followed by copper revenue. Flexing of all
other variables result in a change in NPV of less than $200M in either direction and, under all of the flexed scenarios, the
Project’s NPV remains positive.
IOCG Exploration
During the quarter, Coda undertook two major geophysical surveys at Elizabeth Creek, principally focused on IOCG
exploration (though with secondary sediment-hosted targeting potential).
A series of four Ambient Nose Tomography (ANT) surveys were undertaken to cover the Emmie Bluff, Emmie IOCG and
Elaine prospects. The technology was deployed to provide a detailed sub-surface velocity map to assist in identifying
structures that may host extensions of and/or thicker mineralised portions of the Emmie IOCG deposit. Specific objectives
included the delineation of a detailed basement map which can be used to update and improve gravity inversions, and
the identification of potential additional sediment-hosted copper-cobalt mineralisation in the vicinity of the Emmie Bluff
Indicated Mineral Resource.
Detailed interpretation of the results at Emmie Bluff and Emmie IOCG were released subsequent to quarter-end. The
final model at Emmie IOCG shows a series of raised and lowered blocks of high-velocity basement rock, which the
Company interprets as horst and graben features. The majority of the best mineralised intercepts from the recent drill
campaign at Emmie IOCG appear to be clustered to the southeast of a previously unrecognised NE/SW structure, which
is clearly visible in the ANT data. This fault does not appear to have been directly tested by previous drilling, and is
considered to be an excellent candidate for the structural driver of the IOCG system.
In plan view (Figure 3), the central graben appears to form a roughly north-south trending valley in the interpreted
palaeosurface (i.e. the high velocity data). This valley is correlated with Tapley Hill Formation black shale known from
drilling and with a high velocity anomaly in the cover sequence at the same location. Both the graben-associated valley
and the velocity anomaly extend considerably beyond the drilled area around the Emmie Bluff Mineral Resource,
particularly to the south, but also in a number of apparently isolated sub-basins to the east. These represent excellent
potential extensions of the resource and are priority drill targets.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Figure 3 Plan view showing the ANT velocity model** at -213m RL (Emmie Bluff Copper-Cobalt Mineral Resource depth, red colours)
and at -688m RL (Emmie IOCG mineralised depths (green colours). Note the negative correlation between the (interpreted) Tapley Hill
Formation shale and the high velocity signatures in the basement, suggesting topographic control of the shale deposition.
Subsequent to the completion of the ANT survey, Coda undertook an extensive gravity survey consisting of 3,634 total
stations covering an area of just over 65 square kilometres, encompassing the Emmie IOCG prospect, Emmie Bluff Mineral
Resource and surrounding IOCG and sediment hosted prospects.
The objective of the gravity survey was to improve the resolution of historical gravity surveys, bringing the entire prospect
area to a consistent 125m by 125m grid. The survey was carried out by DaishSat, the same company which previously
surveyed in the area in 2008, 2009 and 2011, allowing for easier integration with historical data.
The final levelled dataset was provided by Daishsat subsequent to quarter end, and will be analysed in detail in the coming
months.
2.3 Cameron River
RC Drill Programme
Final assay results were received for RC drilling undertaken at Cameron River in September and October 2022, which
comprised 27 Reverse Circulation (RC) drill-holes for a total of 2,830m (Figure 4). The drilling had targeted the surface
expression of mineralisation at the Rebound, Copper Weed and Clifford prospects and the associated Gradient Array
Induced Polarisation (GAIP) and Dipole-Dipole Induced Polarisation (DDIP) geophysical anomalies, as well as the
coincident geophysical and surface geochemical anomalies at Bingo and Bluey. A total of 711 samples comprising 4m
composites of RC drill cuttings were collected and submitted to ALS in Mount Isa for analysis.
The assay results returned several intersections of weak to moderately anomalous copper predominantly associated with
drilling at the Copper Weed-Copper Weed South and Rebound trends, with gold, silver and cobalt assays displaying a
weakly positive relationship with these copper zones.
Down-dip extensions of outcropping copper mineralisation were intersected in several holes at the Copper Weed and
Rebound prospects (see Table 2) but were of lower grade than their expression in outcrop. Some limited persistence to
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
depth by copper was noted at Copper Weed in drillhole RC22CR0001 (4m at 0.59% Cu from 8m downhole), and by cobalt
(4m at 0.32% Co from 40m) in drillhole RC22CR0013 at Rebound6.
The drilling at Bluey and Bingo which targeted coincident geochemical and geophysical anomalies 4 did not return any
significant intersections or any indicators of a source for the anomalism previously defined at the prospects. The source
of the very strong conductivity anomalism at these prospects remains unexplained.
Drilling at the southern extensions of the mineralised Copper Weed and Rebound trends at the Clifford, Copper Weed
South and Rin Tin Tin prospects returned intervals weakly anomalous in copper.
Despite the relatively lower tenor of copper noted in these drill results, the pervasive presence of copper oxides as well
as sulphides at the surface and elevated pathfinder elements in soil sample programmes 7 both continue to suggest
hydrothermal activity, as does the local pervasive hydrothermal alteration noted by Coda field staff.
The grade and thickness of mineralisation noted in mapping and surface sampling both appear to rapidly attenuate from
the expression at surface to where mineralisation was intersected at depth. Supergene enrichment is a probable partial
explanation, but cannot explain the presence of sulphides such as chalcopyrite, which are not typical supergene products,
at and near the surface. This may suggest that the main mineral occurrences have been removed by weathering and
current exposures are of the base of the mineralised system, or that the sulphide expression is the result of late-stage
mobilisation and highly-localised recrystallisation of copper in a separate hydrothermal event.
Project Review
An external consultant has been commissioned to carry out a review of the Cameron River Project, the aim is to determine
the next steps for exploration at the project. Results of this review are expected to be received in late April.
6
For details, please see “Copper-Gold Target Zones Identified from High-Grade Rock Chips at Cameron River”, released to the ASX on 27 October
2021, and available at https://www.codaminerals.com/wp-content/uploads/2021/10/20211026_Coda_ASX-ANN_Copper-Gold-Target-ZonesIdentified-at-Cameron-River_RELEASE.pdf
7 For details, please see “Strong IP, Geochemistry, and High-grade Rock Chips at Cameron River”, released to the ASX on 26 April 2022, and available
at
https://www.codaminerals.com/wp-content/uploads/2022/04/20220426_Coda_ASX-ANN_Strong-IP-Geochem-Rock-Chips-at-CameronRiver_RELEASE.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Figure 4: September-October 2022 drill programme completed at Cameron River
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Table 5 Material assays from Cameron River drilling in September and October 2022. Cut off grades of 0.1% Cu, 100 ppm Co, 0.1 g/t
Au and 1 g/t Ag were used to determine materiality. All unreported samples can be assumed to fall below all 4 of those thresholds.
Prospect
Hole ID
Copper Weed
Rebound
Rebound
Rebound
Rebound
Rebound
Rebound
Rebound
Rebound
Rebound
Rebound
Rebound
Copper Weed South
Copper Weed South
Copper Weed South
Copper Weed South
Copper Weed South
Rebound
Rebound
Rebound
Rebound
Rebound
Rin Tin Tin
Rebound
Rebound
Clifford
Clifford
RC22CR0001
RC22CR0003
RC22CR0004
RC22CR0007
RC22CR0008
RC22CR0009A
RC22CR0009A
RC22CR0013
RC22CR0014
RC22CR0014
RC22CR0016
RC22CR0016
RC22CR0017
RC22CR0017
RC22CR0017
RC22CR0018
RC22CR0018
RC22CR0019
RC22CR0019
RC22CR0019
RC22CR0020
RC22CR0020
RC22CR0021
RC22CR0022
RC22CR0022
RC22CR0025
RC22CR0025
From (m) To (m) Length (m) Copper % Gold g/t Silver g/t Cobalt g/t
8
24
16
60
12
28
112
40
76
140
4
60
12
36
68
68
87
88
134
154
8
52
44
4
28
28
56
12
32
20
68
16
32
116
44
80
142
16
64
16
40
72
72
90
92
138
158
12
56
48
8
32
36
60
4
8
4
8
4
4
4
4
4
2
12
4
4
4
4
4
3
4
4
4
4
4
4
4
4
8
4
0.59
0.19
0.31
0.17
0.07
0.09
0.07
0.10
0.19
0.14
0.12
0.14
0.10
0.11
0.02
0.13
0.05
0.49
0.11
0.07
0.15
0.12
0.17
0.04
0.24
0.12
0.18
0.094
0.062
0.029
0.009
0.009
0.006
0.153
0.030
0.064
0.013
0.011
0.036
0.029
0.023
0.002
0.012
0.012
0.002
0.023
0.033
0.022
0.019
0.056
0.005
0.072
0.024
0.038
0.12
0.49
0.97
0.35
0.12
0.12
0.95
0.21
2.20
0.14
0.32
0.38
0.18
0.05
0.04
0.31
0.09
0.53
0.01
0.38
0.35
0.04
0.50
0.11
0.75
0.03
0.14
563
20
35
48
104
106
89
3180
622
29
37
37
31
68
166
98
391
9
11
106
35
42
51
163
75
42
59
2.4 Future Work Programme
Elizabeth Creek Pre-Feasibility Study
Coda is continuing to progress feasibility studies into the Elizabeth Creek Copper Cobalt Project. The Company will initiate
long-duration baseline environmental studies in the coming weeks and has commenced initial approvals processes for a
hydrogeological test bore programme at Emmie Bluff.
Emmie IOCG Geophysical Exploration
Having completed its principal surveys (ANT and gravity), the Company has engaged external consultants to undertake a
substantial geophysical modelling and inversion exercise, centred on a geologically constrained 3D inversion of the Emmie
system. This work will incorporate recent and historical geophysical surveys, as well as all known drilling in the area and
will result in what the company expects to be the most comprehensive and accurate sub-surface geological model of the
area yet developed. This model will allow for precise targeting of IOCG drilling in particular but will also be valuable for
further sediment-hosted exploration.
3. Corporate
Finance & Use of Funds
The Company issued a Prospectus dated 4th September 2020 (and Supplementary Prospectus dated 18th September 2020)
with ASIC and ASX seeking to raise a total of $8.5 million before costs. The Company closed its heavily oversubscribed
Initial Public Offer on 29th September 2020. The Company was officially admitted on ASX on the 26th October 2020 and
commenced trading on the 28th of October 2020 under the ASX ticker COD.
In June 2021 the Company raised $14.4 million through a placement to institutional and sophisticated shareholders under
Coda’s Listing Rule 7.1 placement capacity resulting in the issuance of 12 million new shares. There were no special terms
or features attached to the shares on offer.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
In November 2022 the Company raised $3.8 million through a placement to institutional and sophisticated shareholders
under Coda’s Listing Rules 7.1 and 7.1A placement capacity resulting in the issuance of 15.6 million new shares. There
were no special terms or features attached to the shares on offer. In February 2023, the Directors of the Company
received 1,341,667 shares in total raising an additional $322,000 under this placement, following shareholder approval
at the EGM on the 7th of February 2023.
The placement was managed by CPS Capital Group. In November 2022, CPS were issued 3,533,000 unquoted options in
the Company under the Company’s existing 15% Listing Rule 7.1 capacity with an exercise price of $0.36 per option and
a three-year expiry from the date of issue.
Pursuant to ASX Listing Rule 5.3.2, the Company confirms that there were no mining production and development
activities during the quarter by the Company.
Total cash outflow from operating activities for the quarter was $1.5 million. This included $0.8 million in exploration and
evaluation expenditure and interest received of $53k, with the remaining expenditure was attributed to corporate and
administration costs. Of the remaining expenditure, $69k was for Directors’ fees paid during the period (refer Appendix
5B 6.1).
Total cash inflow from financing activities for the quarter was $0.3 million from 1,341,667 shares issued to Directors
under the November 2022 placement, which was subsequently approved by shareholders at the EGM on the 7th of
February 2023. This included $322k in proceeds from the issue of equity securities, offset by $3k in transaction costs
related to the issue of those equity securities.
Coda ended the March 2023 quarter with $5.95 million in cash and deposits.
Total expenditure by Coda for the next quarter is estimated to be approximately $1.5 million which will fund the
investigation of the Elizabeth Creek Scoping Study upside opportunities, exploration expenditure along with normal
working capital.
4. Events Subsequent to Quarter-End
In April of 2023, Coda announced its interpretation of the Emmie Bluff ANT survey. The pertinent details of this
interpretation are covered in the above section.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
—
This announcement has been authorised for release by the Board of Coda Minerals Ltd
Further Information:
Chris Stevens
Chief Executive Officer
Coda Minerals Limited
info@codaminerals.com
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
About Coda Minerals
Coda Minerals Limited (ASX: COD) is focused on the discovery and development of minerals that are leveraged to the
global energy transformation through electrification and the adoption of renewable energy technologies.
Coda's flagship asset is the 100%-owned Elizabeth Creek Copper-Cobalt Project, located in the world-class Olympic
Copper Province in the Eastern Gawler Craton, South Australia’s most productive copper belt. Elizabeth Creek is centred
100km south of BHP’s Olympic Dam copper-gold-uranium mine, 15km from its new Oak Dam West Project and 50km
west of OZ Minerals’ Carrapateena copper-gold project.
Coda consolidated 100% ownership of the Elizabeth Creek Copper Project after completing the acquisition of its former
joint venture partner, Torrens Mining, in the first half of 2022.
In December 2021, Coda announced a maiden Indicated and Inferred Mineral Resource Estimate for the Emmie Bluff
copper-cobalt deposit at Elizabeth Creek comprising 43Mt @ 1.3% copper, 470ppm cobalt, 11g/t silver and 0.15% zinc
(1.84% CuEq) containing approximately 560kt copper, 20kt cobalt, 15.5Moz silver and 66kt zinc (800kt CuEq) 8.
Importantly, 92% of the contained metal is classified in the higher confidence ‘Indicated Resource’ category and is
available for use in mining studies.
Emmie Bluff is one of three known ‘Zambian-style’ copper-cobalt deposits at Elizabeth Creek, including JORC 2012
compliant Indicated Mineral Resources at the Windabout (18Mt @ 1.14% CuEq) and MG14 (1.8Mt @ 1.67% CuEq)
deposits9. Collectively, the three resources at Elizabeth Creek now host a total of 1.1 million tonnes of contained c
Share your feedback