Highlights
•
The next phase of metallurgical test work has successfully replicated initial laboratory work, confirming the ability
of newly tested oxide collectors to significantly improve copper recoveries from the Windabout deposit at the
Elizabeth Creek Copper-Cobalt Project in South Australia.
•
While initial test work was undertaken under idealised laboratory conditions (see ASX Announcement – 18 June
2024), later rounds utilised site water and were further optimised to replicate more realistic commercial processing
conditions through the application de-slime, multi-stage grinding and other changes.
•
Importantly, the recovery improvements achieved under these conditions are comparable to those achieved under
more permissive laboratory conditions during the previous tests.
•
Work is currently ongoing to convert results from rougher to final concentrate, and to expand the test work across
additional deposits (MG14 and Emmie Bluff).
•
The Company remains on track to include these results in updated project economics later this year.
Coda Minerals Limited (ASX: COD, “Coda”, or “the Company”) is pleased to report highly encouraging follow-up results
from the next stages of metallurgical test work being undertaken on material sourced from its 100%-owned Elizabeth
Creek Copper-Cobalt Project in South Australia. This work builds on and has successfully replicated the recently announced
improvements to flotation recoveries resulting from the application of alternative oxide collectors.
The updated results reported today relate to recently completed metallurgical test work using more commercially
representative conditions on material from Windabout, one of the open pit deposits at Elizabeth Creek. This work
represents the next important phase of work following the successful proof-of-concept laboratory tests completed earlier
in the year.
Previous test work undertaken on Windabout mineralisation was successful in increasing recoveries during the initial
“rougher” stages of flotation by improving the flotation of copper oxides, which are estimated to make up approximately
25% of the copper mineralisation in Windabout. 1
The new phase of test work reported in this announcement was designed principally to replicate those results in more
representative conditions (i.e., using saline site water) as well as to test several additional options to further improve
recovery. The tests were successful, with improvements in recovery achieved under all tested conditions (see Table 1,
Figure 1 and Figure 2).
1
For full details, see “Oxide Flotation Success Delivers Pathway to Improved Recoveries”, released to market on 18 June 2024 and available at
https://www.codaminerals.com/wp-content/uploads/2024/07/20240618_Coda_ANN_Flotation-Success_Release.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
The best results came from a two-stage grind and float process in which rougher tails were further ground down before
being re-floated. This process resulted in an improvement in recovery of approximately 11.6% relative to a baseline
flowsheet test 2, confirming the ability to improve recoveries under more commercially representative conditions.
ELIZABETH CREEK
Discussing the new results, Coda’s CEO Chris Stevens said: “The updated metallurgical test work results reported today are
unequivocally great news for the project.
“Following the first round of work completed under lab conditions we have now successfully replicated those initial results
under more realistic conditions using water sourced from Elizabeth Creek. This shows that the improvements we have seen
are robust and more directly applicable to project conditions, not just in a lab.
“We have now commenced the final stages of test work with Windabout, which will see the completion of a full roughercleaner cycle and provide an estimate of final, full-cycle recoveries and concentrate grades. We will also commence similar
testing on samples from the MG14 and Emmie Bluff deposits to demonstrate the broader applicability of these new
techniques across the project.
Once completed, we anticipate that this work will form the core of a series of improvements which we intend to present to
the market in the second half of this year in the form of a comprehensive review of the project’s Scoping Study and associated
economics.”
Conventional flotation is designed to separate copper, which is hosted as a sulphide, with the addition of oxide collectors
facilitating the flotation of copper held as oxides as well. Diagnostic leach tests suggest that approximately 25% of the copper
in this sample is held as oxide, a figure well within the typical range for this deposit and other deposits at Elizabeth Creek.
While the efficacy of the new collectors was established previously, the new round of tests was required to compare the
rougher flotation performance in saline site water. This involved evaluating the baseline flowsheet which underpins the
Elizabeth Creek Scoping Study (minus the deslime step) with a series of modified flowsheets which incorporate both the
new collectors (principally from the Syensquo Aero® Ox 100 series) and a series of additional steps additional techniques.
These are described in Table 1.
Table 1 Cumulative recovery and grade for multi-step rougher flotation. Please note that the low concentrate grades are due to the tests being rougher
flotation only – progression to cleaner concentrate is required to provide concentrate grades suitable for sale or treatment in a hydrometallurgical
processing plant. Coda has chosen to restrict these tests to rougher flotation due to this step being the most important for metal recovery, as well as to
ensure quicker and lower cost test work.
TestID
JR09
JR07
JR11
JR12
JR13
Description
Standard baseline
flowsheet as per
previous Scoping Study
(minus deslime)
Standard Flowsheet +
Oxide collectors
Standard Flowsheet +
Oxide collectors,
regrind during rougher
floats
Standard Flowsheet +
Oxide collectors with
deslime step restored
Standard Flowsheet +
Oxide collectors and
AERO MX-3714
Promoter
% Cu
Recovery (%
Cu)
% Cu
Recovery (%
Cu)
% Cu
Recovery (%
Cu)
% Cu
Recovery (%
Cu)
% Cu
Recovery (%
Cu)
Ro Conc 1
5.89
18.8
6.95
28.5
5.37
17.4
7.59
24.6
7.01
19.9
Ro Conc 1-2
5.51
27.5
5.78
34.6
3.89
36.1
5.70
35.6
4.89
30.2
Ro Conc 1-3
4.59
36.4
5.08
39.9
3.65
50.3
4.81
43.9
4.18
37.0
Ro Conc 1-4
3.71
42.0
4.47
44.0
3.26
57.4
3.93
46.8
3.30
44.2
Ro Conc 1-5
2.86
49.7
3.95
50.3
2.79
61.2
3.54
53.7
2.90
53.2
The modified flowsheets improved net recoveries in two ways. First, more total recovery was achieved after 33 minutes in
all tests compared with the baseline flowsheet, in some cases materially so. Additionally, in most cases, when concentrates
were produced to comparable grades, the modified flowsheets generally generated significantly higher recoveries.
2 Also conducted in site water
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Summary of Results
Tests JR09 (the baseline flowsheet used during the Scoping Study, excluding deslime) and JR07 (the same flowsheet with
the addition of alternative oxide collectors) demonstrated the efficacy of the collectors in saline water. While total copper
recovery after 33 improved only slightly, it produced a considerably higher grade concentrate, with significantly better
recovery of both copper (approximately 8%) and cobalt when comparing equivalent concentrate grades.
JR 11 (multi-stage grind (from 53 µm to 38µm) with addition of oxide collectors in latter stages) had, perhaps the best result
for this program, recovering 61% of the copper after 33 minutes, the highest recovery achieved during the test work
programme, and representing an 11.6% improvement relative to the baseline.
JR12 (de-slime ahead of flotation, addition of oxide collectors in latter stages) produced a roughly similar outcome to JR7,
however it consumed significantly less dispersant, and appeared to have a slight positive effect on cobalt recovery.
JR13 (similar to JR07 with the addition of Aero MX 3714, a promotor used in tarnished copper ores): Only a slight
improvement on the baseline flowsheet and a slightly worse result than simply adding the original oxide collectors.
Grade Recovery Curve - Cu
8.0
7.0
6.0
Grade (%)
ELIZABETH CREEK
Rougher flotation tests were carried out on material from the Windabout deposit at Elizabeth Creek. The material had a
head grade of approximately 1.06% Cu and 0.06% Co. Reagents were added according to the dosage detailed in Table 2.
Samples were ground to P80 of 53µm and flotation was carried out in five stages for a total of 33 minutes at a pulp density
of 35% w/w.
JR09 - Standard Flowsheet
5.0
JR07 - Standard Flowsheet +
Oxide Collectors
4.0
JR11 - Oxide Collectors +
Regrind
3.0
JR12 - Deslimed Flowsheet +
Oxide Collectors
2.0
JR13 - Standard Flowsheet +
Oxide Collectors, Promoter
1.0
0.0
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
Recovery (%)
Figure 1 Rougher flotation Grade/Recovery curve for tests undertaken during this round of test work. Note the improvement in both grade and recovery
relative to the baseline flowsheet, particularly in test JR11.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Next Steps
ELIZABETH CREEK
The Company is undertaking a full cycle of rougher and cleaner floats, which have been designed using the learnings from
this round of testwork. The procedure will use broadly similar conditions to JR11, however additional grinding will be
included:
1.
2.
3.
Grind sample to 53µm and conduct rougher float as per JR11
Re-grind rougher tail to 38µm and conduct a 2-stage scavenger float with alternative oxide collectors, +/- NaSH.
Re-grind the rougher concentrate to 15µm and float.
The introduction of ultra-fine (15µm) grinding has been included partially due to anticipated synergies with the proposed
Albion hydrometallurgical processing step that the Company intends to utilise at Elizabeth Creek.
Further flotation testwork will be undertaken to confirm the value of desliming and to fully optimise the cleaner flowsheet
before moving onto variability testwork (pending confirmation of available sample) and expanding the testing regime into
additional Zambian-style deposits at Elizabeth Creek (MG14 and Emmie Bluff).
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Grade Recovery Curve - Co
1.00
0.80
Grade (%)
ELIZABETH CREEK
1.20
JR09
JR07
0.60
JR11
JR12
0.40
JR13
0.20
0.00
0.0
20.0
40.0
60.0
80.0
100.0
Recovery (%)
Figure 2 Rougher flotation Grade/Recovery curve for cobalt under the Scoping Study flowsheet (excl deslime) (JR10) and modified with various oxide
collectors (JR11 and JR12). Baseline recovery of cobalt was reduced relative to the original scoping study due in part to lack of deslime, sample variability
and other factors.
Table 2 Test work reagent, pH and grinding regimes.
CuSO4
JR09
JR07
JR11
JR12
JR13
Subtotal
(g/t)
Subtotal
(g/t)
Subtotal
(g/t)
Subtotal
(g/t)
Subtotal
(g/t)
Lime
NaHS
50
PAX OX100 OX101 OX102 3418A
A9863
Cyquest3223
W22
Target pH
Grinding
Regime
350
-
-
-
-
120
500
5
Natural
P80: 53µm
700
7
9
P80: 53µm
50
200
2
250
65
60
30
5
50
200
3
350
130
100
40
5
-
950
12
9
P80: 60µm,
regrind to 38µm
50
200
2
250
85
75
40
5
-
500
7
9
P80: 53µm
50
200
200
50
30
700
4
9
P80: 53µm
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
-
ELIZABETH CREEK
This announcement has been authorised for release by the Board of Coda Minerals Ltd
Further Information:
Chris Stevens
Chief Executive Officer
Coda Minerals Limited
info@codaminerals.com
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
Competent Person’s Statement
The information in this report which relates to metallurgical results is based on information compiled by Mr. Neil
Ireland, who is an employee of Strategic Metallurgy, a metallurgical consultancy engaged by Coda Minerals. Mr Ireland
is a Member of the Australian Institute of Mining and Metallurgy and has sufficient relevant experience to the style of
metallurgical test work under consideration and interpretation thereof, and to the activities undertaken, to qualify as
a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Ireland consents to the inclusion in this
report of the matters based on the information compiled by him, in the form and context in which it appears.
About Coda Minerals
Coda Minerals Limited (ASX: COD) is focused on the discovery and development of minerals that are leveraged to the
global energy transformation through electrification and the adoption of renewable energy technologies.
Coda's flagship asset is the 100%-owned Elizabeth Creek Copper-Cobalt Project, located in the world-class Olympic
Copper Province in the Eastern Gawler Craton, South Australia’s most productive copper belt. Elizabeth Creek is centred
100km south of BHP’s Olympic Dam copper-gold-uranium mine, 15km from its new Oak Dam West Project and 50km
west of OZ Minerals’ Carrapateena copper-gold project.
Coda consolidated 100% ownership of the Elizabeth Creek Copper Project after completing the acquisition of its former
joint venture partner, Torrens Mining, in the first half of 2022.
In December 2021, Coda announced a maiden Indicated and Inferred Mineral Resource Estimate for the Emmie Bluff
copper-cobalt deposit at Elizabeth Creek, which was later updated in January of 2024. The Mineral Resource comprises
40.2Mt @ 1.27% copper, 569ppm cobalt, 17g/t silver and 0.17% zinc (1.87% Copper Equivalent (CuEq)) containing
approximately 510kt copper, 23kt cobalt, 21.7Moz silver and 70kt zinc (751kt CuEq) 3. Importantly, 95% of the contained
metal is classified in the higher confidence ‘Indicated Resource’ category and is available for use in mining studies.
2024.01.30 - Scoping Study Update Delivers Materially Improved Economics Competent Person: Dr Michael
Cunningham.
3
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
Emmie Bluff is one of three known ‘Zambian-style’ copper-cobalt deposits at Elizabeth Creek, including JORC 2012
compliant Indicated Mineral Resources at the Windabout (18Mt @ 1.14% CuEq) and MG14 (1.8Mt @ 1.67% CuEq)
deposits 4. Collectively, the three resources at Elizabeth Creek now host a total of over 1 million tonnes of contained
copper equivalent.
A scoping study into the development of these three deposits was released in March of 2023 and updated in January 5
and March of 2024. The updated study demonstrated an economically robust project with a 14 year mine life, capable
of producing approximately 25,700 tonnes of copper and 1,300 tonnes of cobalt at steady state production levels. The
project had a lifetime average AISC of USD $1.73/lb of Cu (after by-product credits) and an approximately pre-tax NPV8
of $826M 6.
Coda has also discovered a significant IOCG system adjacent to and below the Emmie Bluff target, with initial deep
diamond drilling in June 2021 intersecting 200m of intense IOCG alteration at the Emmie IOCG target, including
approximately 50m of copper sulphide mineralisation 7. Since then, Coda has drilled 21 holes into Emmie IOCG, with all
but three returning significant widths of mineralisation, some over 3% copper and 0.5g/t gold 8.
Coda has a dual strategy for success at Elizabeth Creek. Firstly, it is working towards the next step in the development
process for its Zambian-style copper cobalt projects by advancing technical and economic studies to build on the results
of the recently updated Scoping Study, while simultaneously undertaking exploration to further define and extend
known Zambian-style copper-cobalt resources across multiple prospects.
Secondly, it is undertaking a substantial geophysical and related assessment programme at the Emmie IOCG prospect
to further understand the structures and extent of the geological model defined through drilling.
Coda also has recently consolidated 100% ownership of the Cameron River Copper-Gold-Uranium Project, located in
the highly prospective Mount Isa Inlier in Queensland. The Project comprises 35km2 of copper and gold exploration
tenure spanning two Exploration Permits (EPMs 27042 and 27053).
2020.10.26 - Confirmation Statements JORC, Competent Person: Tim Callaghan.
2024.01.30 - Scoping Study Update Delivers Materially Improved Economics
6
2024.03.14 – Further Key Improvement in Underground Project Economics
7
2021.06.22 - Thick Zone of IOCG Mineralisation Intersected at Emmie Bluff Deeps, Competent Person: Mr Matthew
Weber.
8
2022.08.18 – Assays from IOCG Drilling Confirm Target Areas for Follow Up, Competent Person: Mr Matthew Weber.
4
5
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Competent Persons’ Statements and Confirmatory Statement - Mineral Resource Estimates
MG14 Indicated Mineral Resource: The information is extracted from the report entitled "Confirmation Statements
JORC" created on 26th October 2020 and is available to view at:
ELIZABETH CREEK
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-022989156A1003162&v=70bc033a22188bdfefb8a0b8ad3c24897ef2837d.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that
all material assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcement.
Windabout Indicated Mineral Resource: The information is extracted from the report entitled "Confirmation
Statements JORC" created on 26th October 2020 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-022989156A1003162&v=70bc033a22188bdfefb8a0b8ad3c24897ef2837d.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that
all material assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcement.
Emmie Bluff Mineral Resource: The information is extracted from the report entitled “Scoping Study Update Delivers
Materially Improved Economics" created on 30 January 2024 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-02766550-6A1191314.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that
all material assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcement.
Cattle Grid South Mineral Resource: The information is extracted from the report entitled “Initial Copper Resource for
Cattle Grid South" created on 03 July 2024 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-028239896A1214274&v=4015c7b87631faf94ecd96975272ff9ad5cb14c3.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that
all material assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcement.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
Listing Rule 5.23.2
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements cited in this announcement and, in the case of estimates of Mineral
Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcement continue to apply and have not materially changed. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcement.
Statement Regarding Metal Equivalent Calculations
Metal Equivalent grades are quoted for one or more of the Emmie Bluff, Windabout and MG14 Mineral Resources, or
for exploration results considered by the company to be related directly to one of these Mineral Resources, in this
announcement.
For the Emmie Bluff Mineral Resource:
The Emmie Bluff Mineral Resource is reported as 40.2Mt @ 1.27% copper, 569ppm cobalt, 17g/t silver and 0.17% zinc
(1.87% Copper Equivalent (CuEq)) reported at a cut-off grade of 1% CuEq. The calculation of this metal equivalent is
based on the following assumptions.
Metal
Copper
Cobalt
Zinc
Silver
Coefficient
0.8
0.85
0.9
0.85
Forecast Price
$7,000
$55,000
$2,100
$18.50
Price Unit
USD/Tonne
USD/Tonne
USD/Tonne
USD/Oz
Price assumptions used when calculating copper equivalent grades were based primarily on Consensus Economics
forecasts of metals, except for Cobalt, which was sourced via communication with subject matter experts. Metallurgical
assumptions used when calculating copper equivalent grades were based on a simple bulk float utilising rougher and
minimal cleaner/scavenger circuits. The produced a reasonably consistent mean recovery across most metals of
between approximately 83 and 94 percent. For simplicity, and to in part account for losses associated with less intensive
cleaner floats and losses to the hydromet plant, these figures were rounded down to the nearest 5%.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝐶𝐶𝐶𝐶𝐶𝐶𝐶% = 𝐶𝐶𝐶𝐶% + 0.00068 × 𝐶𝐶𝐶𝐶 𝑝𝑝𝑝𝑝𝑝𝑝 + 0.337 × 𝑍𝑍𝑍𝑍 % + 90.3 ×
𝐴𝐴𝐴𝐴 𝑝𝑝𝑝𝑝𝑝𝑝
10000
For the Windabout and MG14 Mineral Resource:
The Windabout and MG14 Mineral Resource are reported at a cut-off grade of 0.5% CuEq as:
• Windabout: 17.67Mt @ 0.77% Cu, 492 ppm Co and 8 g/t Ag (1.41% CuEq)
• MG14: 1.83Mt @ 1.24% Cu, 334 ppm Co and 14 g/t Ag (1.84% CuEq)
The calculation of this metal equivalent is based on the following assumptions.
Metal
Copper
Cobalt
Mining
Recovery %
0.9
0.9
Dilution %
Recovery %
Payability %
Forecast Price
Price Unit
0.05
0.05
0.6
0.85
0.7
0.75
$6,600
$55,000
USD/Tonne
USD/Tonne
Price assumptions used when calculating copper equivalent grades were based on recent historical metal prices at the
time of calculation (2018). Metallurgical assumptions are based on extensive metallurgical testwork undertaken on the
two deposits to 2018 across various potential flowsheets involving both floatation and leaching. Ag analyses in the
estimation and metallurgical testwork were considered insufficient at the time to include in the metal equivalent
calculation.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝐶𝐶𝐶𝐶𝐶𝐶𝐶% = 𝐶𝐶𝐶𝐶% + 0.0012 × 𝐶𝐶𝐶𝐶 𝑝𝑝𝑝𝑝𝑝𝑝
It is the opinion of the company that both sets of prices used in the calculations are reasonable to conservative longterm forecasts for real dollar metal prices during the years most relevant to the deposits (approx. 2026-2030).
It is the opinion of the company that all of the elements included in the metal equivalent calculations have a reasonable
potential to be recovered and sold.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
For full details of the Emmie Bluff Metal Equivalent calculation, please see “Scoping Study Update Delivers Materially
Improved Economics” released to the market on 30th January 2024 and available to view at
https://www.codaminerals.com/wp-content/uploads/2024/01/20240130_Coda_ASX-ANN_Scoping-Study-UpdateDelivers-Materially-Improved-Economics_RELEASE.pdf.
For full details of the MG14/Windabout Metal Equivalent Calculation, please see “Confirmation of Exploration Target
& Mineral Resource and Ore Reserve Statement”, released to the ASX on 23rd October 2020 and available at
https://www.codaminerals.com/wp-content/uploads/2020/10/20201026_Coda_ASX-ANN_Confirmation-StatementsJORC.pdf.
Forward Looking Statements
This announcement contains ‘forward-looking information’ that is based on the Company’s expectations, estimates
and projections as of the date on which the statements were made. This forward-looking information includes, among
other things, statements with respect to the Company’s business strategy, plans, development, objectives,
performance, outlook, growth, cash flow, projections, targets and expectations, mineral reserves and resources, results
of exploration and related expenses. Generally, this forward-looking information can be identified by the use of
forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘potential’, ‘likely’, ‘believe’, ‘estimate’,
‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’, ‘evolve’ and similar expressions.
Persons reading this announcement are cautioned that such statements are only predictions, and that the Company’s
actual future results or performance may be materially different. Forward-looking information is subject to known and
unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of activity,
performance or achievements to be materially different from those expressed or implied by such forward-looking
information.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
Appendix 2: Detailed Technical Information and JORC Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
• Nature and quality of sampling (e.g. cut channels,
techniques
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation
that are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant
disclosure of detailed information.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Commentary
• Metallurgical sample was taken from sample drilled and composited in
2018/2019.
• Samples were collected as 8 inch core from two drillholes in the Windabout
deposit.
• The material has been kept in cold storage since compositing/flotation to
minimise oxidation.
ELIZABETH CREEK
Criteria
Drilling
techniques
Drill
sample
recovery
JORC Code explanation
• Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
•
•
•
Logging
•
•
•
6 Altona Street
West Perth
Western Australia, 6005
Commentary
• Drilling has not been reported as part of this release.
• Metallurgical sample was taken from 8” diamond core (Windabout).
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
•
•
Drilling has not been reported as part of this release.
Metallurgical sample was taken from diamond drilling at Windabout, where
recovery is typically excellen