KZR: Kalamazoo Acquires Mt Piper Gold Project in Victoria
Released
Released
Announcement PDF
ASX Announcement
4 July 2022
Victorian Portfolio Expanded with Acquisition of
Mt Piper Gold Project
Highlights
•
Kalamazoo has acquired the 1,609km2 Mt Piper Gold Project from Coda Minerals Limited (ASX: COD),
which is strategically located adjacent to Agnico Eagle Mine Limited’s (NYSE: AEM) large exploration
land tenure and 30km from its world-class Fosterville gold mine in Central Victoria
•
The Project is also situated between Mandalay Resources’ (TSX: MND) high-grade Costerfield goldantimony mine (1km) and the Sunday Creek Project (Southern Cross Gold, ASX: SXG) which recently
announced significant drilling intersections including 119.2m @ 3.2 g/t Au and 0.4% Sb (3.9 g/t Au Eq)1
•
The Mt Piper Gold Project (EL6775, EL7331, EL7337, EL7366, EL7380 and application ELA7481) is
considered highly prospective for epizonal, high-grade gold and antimony deposits (i.e. Fostervillestyle) with all tenements considered under-explored, limited to very shallow drilling, and not subjected
to modern exploration techniques
•
Recent systematic rock chip sampling at the south-western Goldie Prospect (EL6775) has defined highgrade gold mineralisation with best rock chip assay results including 31.1 g/t and 30.4 g/t Au2
•
Kalamazoo’s gold exploration tenure is increased to 2,094km2 and is the largest exploration holding in
the southern section of the Central Victorian Goldfields including the 100% owned Castlemaine
(historical production of 5.6Moz Au), South Muckleford, Myrtle and Tarnagulla Gold Projects
•
The acquisition is consistent with Kalamazoo’s strategy of acquiring and developing major resource
projects with significant exploration and development potential in Victoria and the Pilbara - two of the
world’s leading mineral provinces
•
Kalamazoo will immediately start the important Community Engagement process before commencing
with an initial “low impact” exploration program
Kalamazoo’s Chairman and CEO Luke Reinehr said today, “We are delighted to have acquired this major
exploration project from Coda Minerals. This is a very positive development for our shareholders and is an
outstanding addition to our prospective portfolio of gold projects in Victoria. Our continued consolidation
of highly prospective exploration ground in the Central Victorian Goldfields is enhanced by the on-going
success at the high-grade Fosterville and Costerfield gold mines. These projects contain high-grade goldantimony mineralisation near the main fault margin separating the Bendigo and Melbourne Zones and are
reported to be the No. 1 and No. 7 highest milled grade gold mines worldwide in 2021, respectively. 3
As a major player in the Central Victorian Goldfields, we will systematically continue our exploration
activities in the search for the next world class gold discovery in Victoria. Coupled with our Pilbara gold
activities at the 1.65Moz Ashburton Gold project and our lithium exploration in JV with the major Chilean
lithium producer SQM, the next 12 months is sure to be an exciting time.”
1 ASX: SXG 30 May 2022
2 ASX: TRN 13 December 2021 and Table 1
3 Kitco and Mining Intelligence Data
Kalamazoo Resources Limited (ASX: KZR) (“Kalamazoo” or “the Company”) is pleased to announce that it
has purchased from Coda Minerals Limited (“Coda”) the highly prospective Mt Piper Gold Project in Victoria.
Coda inherited the project as part of its recently completed take-over of its Elizabeth Creek Copper Project
joint venture partner, Torrens Mining Limited (ASX: TRN), the previous owners of the Mt Piper Gold Project4.
Situated approximately 75km north of Melbourne, the project area is traversed by the Hume Freeway and
boasts excellent access to local infrastructure. Located along the western margin of the Melbourne Zone
and adjacent to the Bendigo Zone in the Central Victorian Goldfields, the project area is considered to have
outstanding potential for the discovery of high-grade gold and antimony deposits.
This acquisition is an important addition to Kalamazoo’s Victorian gold assets. In a similar investment
strategy to the acquisition of its flagship Castlemaine Gold Project in Victoria in 2018, the deal structure
enables Kalamazoo to invest funds directly “into the ground”.
Under the terms of the agreement, Kalamazoo has acquired the Mt Piper Gold Project by paying Coda:
1.
2.
3.
cash of $300,000
1,525,000 fully paid ordinary shares (“Shares”) in Kalamazoo, escrowed for 12 months from issue
a 1% Net Smelter Royalty (“NSR”) payable on any minerals extracted from the tenements
The Shares will be issued to Torrens Gold Exploration Pty Ltd (“Torrens”) (a wholly owned subsidiary of
Coda) under the Company’s available placement capacity pursuant to Listing Rule 7.1. Torrens is not a
related party of the Company.
The Central Victorian Goldfields continues to deliver high-grade gold and antimony production and
exploration success. This is led by Agnico Eagle’s world-class Fosterville gold mine and Mandalay
Resources’ Costerfield gold-antimony mine (Figure 1).
Figure 1: Location of Kalamazoo’s Central Victorian Goldfields tenements, including the Mt Piper Gold Project
4
ASX: COD 22 April 2022
ASX: KZR
Page 2 of 14
In recent months, field activity in the immediate area to the south of the Mt Piper Gold Project, has also seen
major gold exploration success by Southern Cross Gold at its Sunday Creek Gold Project with major drilling
intersections that have included 119.2m @ 3.2 g/t Au and 0.4% Sb (3.9 g/t Au Eq) (Figure1).
Coda’s Chief Executive Officer Chris Stevens said, “Following on from Coda’s takeover of Torrens Mining
earlier this year, our focus is on developing our 100% owned Elizabeth Creek Copper-Cobalt Project in
South Australia. It made sense for Coda to sell Torrens’ Victorian Mt Piper Gold Project to Kalamazoo, which
is an experienced explorer in the Central Victorian Goldfields with a major land package. We were keen
however to retain an ongoing exposure to the very prospective Mt Piper Gold Project and the Kalamazoo
scrip consideration and royalty structure achieves this. Coda is excited to see Mt Piper’s next phase of
development under Kalamazoo ownership and is pleased the agreed transaction structure helps enable
Kalamazoo to put its funds directly into exploration.”
Project Geology
The Mt Piper Gold Project is located within the Melbourne Zone, a major tectonic block bounded by the
Mount William Fault to the west and the Governor Fault to the east. Specifically, the Project is situated
largely along the westernmost margin of the Melbourne Zone either within, or in proximity, to the major
bounding Mount William Fault Zone. The Melbourne Zone consists largely of folded and faulted Middle
Ordovician to Middle Devonian deep water marine clastic sedimentary units that overlie the
Paleoproterozoic to Cambrian Selwyn Basement Block and intruded by Late Devonian Granites.
Significant known gold mineralisation in the Melbourne Zone includes the high-grade Costerfield goldantimony mine and the historical Heathcote, Nagambie, Rushworth, and Bailieston goldfields. These
goldfields are part of a broad epizonal gold-antimony province largely confined to the Melbourne Zone and
the adjacent overlapping easternmost margin of the Bendigo Zone which hosts the world-class Fosterville
gold mine and historic Malmsbury Goldfield.
The position of the Mt Piper Gold Project along the major fault-bounded margin between the Melbourne
and Bendigo Zones is considered highly prospective for significant economic high-grade gold-antimony
deposits. This is further supported by the Mt Piper Gold Project being located between the high-grade AuSb Costerfield mine and the recently announced major drilling intersections at the Sunday Creek Project.
Project Exploration History
Records indicate that there has been limited exploration work on the tenements that comprise the Mt Piper
Gold Project. Historical work has largely consisted of localised programs of geological mapping with soil,
stream sediment and rock chip sampling, Induced Polarisation geophysical surveys and limited reverse
circulation (<100m deep) and diamond drilling5.
More recently in 2021, the previous owners Torrens Mining had identified 31 gold targets that were to be
the subject of follow-up exploration programs (Figure 2). Torrens Mining had completed the following:
•
Systematic rock chip sampling at the south-western Goldie Prospect (EL6775) that defined highgrade gold mineralisation over a minimum strike length of 120m and included several parallel reefs
identified within a potentially 150m wide corridor (Figure 3). Best rock chip assay results included
31.1 g/t and 30.4 g/t Au6 (Table 1)
•
The Goldie Prospect encompasses a series of historical shallow mine workings over a strike length
of 1.2km and was prioritised due to a pronounced ~200m wide gold-in-soil anomaly with a best soil
assay result of 1,800ppb Au6
5 Torrens Mining Limited IPO Prospectus 2020, ASX: TRN 6 January 2021
6 ASX: TRN 13 December 2021
ASX: KZR
Page 3 of 14
Figure 2: Torrens Mining - Mt Piper Gold Project regional targets and structural trends on background regional aeromagnetic
image (ASX: TRN 29 October 2021)
ASX: KZR
Page 4 of 14
Figure 3: Torrens Mining – Mt Piper Project: Plan view map of the Goldie Prospect showing the location of rock chip samples (g/t)
and soil (ppb) assay results (ASX: TRN 29 Oct 2021 and Table 1)
ASX: KZR
Page 5 of 14
Table 1. Torrens Mining – Goldie Prospect rock chip sample assays
Sample ID
RC001A
RC001A
RC001B
RC001C
RC002A
RC002B
RC003A
RC003B
RC003C
RC003D
RC003E
RC004
RC005
RC006
GRC007
GRC008
GRC009
GRC010
GRC011
GRC012
GRC013
GRC014
GRC015
GRC016
GRC017
GRC018
GRC019
GRC020
GRC021
GRC022
GRC023
GRC024
GRC025
GRC026
GRC027
GRC028
GRC029
GRC030
GRC031
GRC032
GRC033
GRC034
GRC035
GRC036
GRC037
GRC038
GRC039
GRC040
GRC041
GRC042
GRC043
GRC044
GRC045
GRC046
GRC047
GRC048
GRC049
GRC050
ASX: KZR
Easting (mE)*
302566
302566
302566
302566
302496
302496
302501
302501
302501
302501
302501
302512
302512
302512
302493
302494
302494
302494
302494
302502
302502
302497
302497
302501
302501
302501
302495
302495
302494
302494
302500
302498
302500
302500
302500
302493
302477
302477
302477
302595
302591
302585
302576
302576
302573
302580
302579
302585
302590
302590
302595
302612
302505
302505
302505
302505
302505
302505
Northing (mN)*
5879151
5879151
5879151
5879151
5879096
5879096
5879060
5879060
5879060
5879060
5879060
5879034
5879034
5879034
5879060
5879066
5879066
5879066
5879066
5879054
5879054
5879066
5879066
5879075
5879075
5879075
5879084
5879086
5879085
5879085
5879092
5879087
5879099
5879099
5879099
5879093
5879075
5879075
5879075
5879166
5879148
5879161
5879158
5879158
5879154
5879155
5879165
5879161
5879165
5879165
5879185
5879245
5879051
5879051
5879051
5879051
5879051
5879051
Comments
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
Stacked quartz from historic workings
In-situ quartz from base of workings
In-situ quartz from base of workings
In-situ quartz from base of workings
In-situ quartz from base of workings
In-situ quartz from base of workings
In-situ quartz from base of workings
Lithology
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Quartz
Au (g/t)
<0.04
<0.04
<0.04
0.12
<0.04
19.15
19.78
17.93
14.72
9.28
4.19
14
8.6
3.57
8.95
0.25
0.62
30.45
1.43
5.29
7.42
16.1
16.18
0.47
4.31
14.42
8.41
6.87
2.71
5.12
0.08
<0.04
0.53
0.53
0.46
0.78
2.08
8.72
2.13
<0.04
<0.04
0.04
0.38
0.06
<0.04
0.1
0.08
<0.04
0.05
<0.04
<0.04
4.49
1.78
4.21
31.08
11.38
16.97
7.94
Page 6 of 14
Project Generation
Kalamazoo believes that the acquisition of the Mt Piper Gold Project is consistent with its strategy of
acquiring and developing major resource projects with significant exploration and development potential
in Victoria and the Pilbara.
Kalamazoo considers the Mt Piper Gold Project to be an excellent fit with the Company’s Victorian strategy
of acquiring and exploring high-quality gold projects with a target threshold of 1Moz at grades >10 g/t Au.
Included with Kalamazoo’s existing projects, the Company’s Victorian ground holding has now increased
to 2,094km2 and is the largest exploration holding in the southern section of the Central Victorian
Goldfields. This portfolio includes the 100% owned Castlemaine (historical production of 5.6Moz Au), South
Muckleford, Myrtle and Tarnagulla Gold Projects which are all subject to ongoing exploration programs.
Next Steps
Kalamazoo’s priority at the Mt Piper Gold Project is to progress the work commenced by Torrens Mining on
advancing prospects towards a drill-ready status, which will include the following:
•
•
•
Continue with the important Community Engagement process
Expand the target generation analysis
Design of initial “low impact” exploration programs for high priority target areas
This announcement has been approved for release to the ASX by Luke Reinehr, Chairman and CEO,
Kalamazoo Resources Limited.
For further information, please contact:
Luke Reinehr
Chairman/CEO
luke.reinehr@kzr.com.au
Media & Investor Relations (Australia)
Victoria Humphries
victoria@nwrcommunications.com.au
Media & Investor Relations (Canada)
Leo Karabelas: leo@fcr.ca
Tom Panoulias: tom@fcr.ca
About Kalamazoo Resou rces Li mited
Kalamazoo Resources Limited (ASX: KZR) is an ASX-listed exploration company with a portfolio of highquality gold and lithium projects in Victoria and the Pilbara, WA. Kalamazoo is exploring at its 100% owned
Castlemaine Goldfield (historical production of ~5.6Moz Au) and south of the Maldon Goldfield (historical
production of ~2Moz) near the world class Fosterville gold mine in Victoria. In the Pilbara, Kalamazoo’s
extensive exploration program is advancing the 100% owned Ashburton Gold Project to further increase
the 1.65Moz Au resource and progress development plans. Kalamazoo’s lithium projects include the DOM’s
Hill and Marble Bar Lithium Projects in an exploration joint venture with the major Chilean lithium producer
Sociedad Química y Minera de Chile S.A. (SQM) (NYSE: SQM) and the 100% owned Pear Creek Lithium
Project.
Kalamazoo has become the first gold and lithium explorer operating in Australia to be certified carbon
neutral for its business operations under the Federal Government’s Climate Active Program, with projected
2022 emissions fully offset achieved with a verified environmental reforestation program in Western
Australia.
ASX: KZR
Page 7 of 14
R es p o ns e to CO V I D - 1 9
Kalamazoo has been proactively managing the potential impact of COVID-19 and has developed systems and policies
to ensure the health and safety of its employees and contractors, and of limiting risk to its operations. These systems
and policies have been developed in line with the formal guidance of State and Federal health authorities and with
the assistance of its contractors and will be updated should the formal guidance change. Kalamazoo’s first and
foremost priority is the health and wellbeing of its employees and contractors.
To ensure the health and wellbeing of its employees and contractors, Kalamazoo has implemented a range of
measures to minimise the risk of infection and rate of transmission to COVID-19 whilst continuing to operate. All
operations and activities have been minimised only to what is deemed essential. Implemented measures include
employees and contractors completing COVID-19 risk monitoring, increased hygiene practices, the banning of nonessential travel for the foreseeable future, establishing strong infection control systems and protocols across the
business and facilitating remote working arrangements, where practicable and requested. Kalamazoo will continue to
monitor the formal requirements and guidance of State and Federal health authorities and act accordingly.
C o mp e te n t Pe rso ns S ta t em en t
The information for the Mt Piper Project is based on information compiled by Dr Luke Mortimer, a competent person
who is a Member of The Australian Institute of Geoscientists. Dr Mortimer is an employee engaged as the Exploration
Manager for the Company and has sufficient experience which is relevant to the style of mineralisation and type of
deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration results, Mineral Resources and Ore Reserves’.
Dr Mortimer consents to the inclusion in this document of the matters based on his information in the form and context
in which it appears.
Fo r wa r d Lo o king S ta tem e nt s
Statements regarding Kalamazoo’s plans with respect to its mineral properties and programs are forward-looking
statements. There can be no assurance that Kalamazoo’s plans for development of its mineral properties will proceed
as currently expected. There can also be no assurance that Kalamazoo will be able to confirm the presence of
additional mineral resources/reserves, that any mineralisation will prove to be economic or that a mine will successfully
be developed on any of Kalamazoo’s mineral properties. The performance of Kalamazoo may be influenced by a
number of factors which are outside the control of the Company and its Directors, staff, and contractors.
ASX: KZR
Page 8 of 14
Table 1. JORC Code, 2012 Edition
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling
techniques
Drilling
techniques
Drill sample
recovery
Logging
ASX: KZR
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may
be required, such as where there is coarse
gold that has inherent sampling problems.
Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant
disclosure of detailed information.
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• Method of recording and assessing core and
chip sample recoveries and results assessed.
• Measures taken to maximise sample
recovery and ensure representative nature of
the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
Commentary
• Samples referred to in this report were
obtained from random in-situ rock chip
samples collected by Torrens Mining Ltd
during standard field reconnaissance
exercises.
• The random rock chip samples were
irregularly spaced which is considered
appropriate for “regional-scale”
reconnaissance-level gold exploration.
• Rock chips were random, subject to bias and
often unrepresentative for the typical widths
required for economic consideration. They are
by nature difficult to duplicate with any
acceptable form of precision or accuracy.
• Torrens’ rock chip samples were analysed by
Gekko Assay Laboratory in Ballarat, Victoria.
• Torrens’ gold grades were determined by 30g
fire assay.
• Not applicable.
• Not applicable.
• Not applicable.
Page 9 of 14
Criteria
JORC Code explanation
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
relevant intersections logged.
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
Verification
of sampling
and assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
Data spacing
and
distribution
ASX: KZR
Commentary
• All rock chip samples were oven dried,
crushed then pulverised to a nominal 90%
passing 75 microns.
• The sample preparation techniques are
considered appropriate for the sample type.
• A blank flush consisting of 20 mm blue metal
is put through the pulveriser between batches
and on a ‘as needed’ basis.
• Sample sizes are considered to be large
enough to be a localised representation of the
sample site.
• Where applicable, samples were dried to a
constant weight and ground to 75μm (90%).
• Primary assaying of samples was been
undertaken by Gekko Systems, Ballarat.
Analysis is by 30g Fire Assay with Atomic
Absorption Spectrometer (AAS) finish to 0.04
g/t detection limit.
• This process is considered total.
• Assay data quality was determined through
laboratory standards, duplicates and blanks.
• Acceptable levels of accuracy (lack of bias)
have been established.
• The analytical techniques and quality control
protocols used are considered appropriate for
the data to be used for reporting early-stage
exploration rock chip results.
• Rock chip and geological information is
written in field books and coordinates saved
from handheld GPS’s used in the field.
• All rock chips were inspected and logged by
Torrens Mining geologists.
• Field data is entered into Excel spreadsheets
before being loaded into a database.
• No analytical result adjustments have been
applied.
• All rock chips were surveyed and recorded in
the Torrens Mining database.
• All rock chip sample locations (x-y) were
recorded with a Handheld GPS with assumed
3-5m accuracy and height (z) relative to AHD.
• All sample location coordinates are provided
in the Geocentric Datum of Australia (GDA94
Zone 55).
• The rock chip sampling reported was
conducted randomly.
• Sample spacing and distribution is not
sufficient to establish the degree of geological
Page 10 of 14
Criteria
JORC Code explanation
•
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
The measures taken to ensure sample
security.
Orientation
of data in
relation to
geological
structure
•
Sample
security
•
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
•
Commentary
and grade continuity appropriate for a Mineral
Resource.
• No sample compositing is applied to samples.
• Samples were collected from the outcropping
lodes which are interpreted to strike ~N-S
• The rock chip sampling was reconnaissance
and random in nature.
• Chain of custody was managed by Torrens
Mining. Samples are stored at a secure site,
before being transported by Torrens’
personnel to Gekko Systems Analytical
Laboratory in Ballarat, Victoria.
• No external audits or reviews have been
undertaken.
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
• Acknowledgment and appraisal of
exploration by other parties.
• The Mt Piper Project is comprised of EL6775, EL7331,
EL7337, EL7366, EL7380 and application ELA7481
• All granted tenements that comprise the Mt Piper
Project are in good standing with no known
impediments.
• The majority of application ELA7481 is located within
the Puckapunyal Military Area. Whilst mineral
exploration is not prohibited in this area Kalamazoo are
yet to determine what, if any, licence conditions may
be applied upon eventual grant.
Exploration
done by other
parties
• The historical Heathcote, Lancefield. Reedy Creek,
Baillieston, Graytown, Costerfield and Sunday Creek
goldfields were exploited in areas immediately
adjacent of the project area and there is only very
minor artisanal gold and antimony production
recorded within the existing tenements. The most
recent previous work in the region was undertaken by
Oroya Mining Limited, on previous tenements EL4947
and EL4948 in 2006, with some minor work before
Oroya.
• Historical Work on EL6775
• Several historical workings are present on
EL6775, although the total gold production is
unknown. To date, no detailed mapping or
sampling has been undertaken over these
ASX: KZR
Page 11 of 14
Criteria
JORC Code explanation
Commentary
•
Geology
• Deposit type, geological setting and
style of mineralisation.
Drill hole
Information
• A summary of all information
material to the understanding of the
exploration results including a
tabulation of the following
information for all Material drill
holes:
o easting and northing of the drill
hole collar
o elevation or RL (R
Share your feedback
Discover