September 2023 Quarterly Activities and Cashflow Reports
Released
Released
Announcement PDF
ASX RELEASE
30 October 2023
ASX Code: COD
QUARTERLY
ACTIVITIES REPORT
FOR THE QUARTER ENDED 30 SEPTEMBER 2023
HIGHLIGHTS
CONTENTS
1.0
Overview
2.0
Projects & Assets
2.1
Tenement
Schedule
2.2
Elizabeth Creek
Copper Project
Update
2.3
Future Work
Programme
Elizabeth Creek – Copper-Cobalt Project (South Australia)
- Substantial progress achieved in advancing both technical and economic studies for
the optimisation, funding and development of the Elizabeth Creek Copper Project,
with key milestones including:
• Project Optimisation
- Significant advances in mineral processing flowsheet development including a 40%
increase in copper recoveries from the MG14 open pit deposit and ongoing testwork
for applicability of this enhancement to the Windabout and Emmie Bluff deposits.
- Pivotal underground ore-sorting study completed with positive results released
immediately subsequent to quarter-end.
- Advanced work to add significant project value through the implementation of
mechanical cutting as a more selective, lower cost mining method at Emmie Bluff.
Results are expected in the December Quarter.
• Elizabeth Creek – IOCG (South Australia)
- Interpretation of tight-spaced forward gravity completed, integrating all previous and
recently acquired IOCG related datasets to generate IOCG targeting vectors.
- Results released in early October indicate the presence of a structural corridor
controlling the IOCG mineralisation and extending up to 2.4km to the northern
tenement boundary, significantly expanding the prospective IOCG search space.
3
Corporate
3.1
Finance &
Use of Funds
4
Events
Subsequent to
Quarter End
• Corporate
- $2.8 million cash on hand as at 30 September 2023.
- Strategic partner discussions continued regarding the future development of
Elizabeth Creek including technical and economic studies.
• Upcoming Milestones
- Scoping Study update expected to be completed in the December Quarter, including
the results of all recent work incorporating an updated Emmie Bluff mining method,
underground ore sorting and flowsheet optimisation.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN: 49 625 763 957
1. Overview
Coda Minerals Chair, Keith Jones, said: “Our focus during the quarter was on three key work streams: Firstly, advancing
discussions with potential long-term funding partners for the Elizabeth Creek Copper Project; secondly optimising the
recent Scoping Study; and, thirdly, advancing the IOCG targeting at Elizabeth Creek.
“The copper-cobalt Resource at Elizabeth Creek is one of the largest and highest-grade undeveloped copper projects in
Australia. The Scoping Study, published in March 2023, demonstrated a long-life, technically viable, low-risk operation
with a pre-production CAPEX of just $277 million, NPV 8 of $570 million, and a pre-tax IRR of 27%.
“In this quarter we have progressed the underground mining model at Emmie Bluff to reduce mining costs, increase
selective mining and improve resource conversion to mineable tonnes. The results of this work will be delivered in the
December Quarter.
“The project has attracted interest from multiple parties, and we are evaluating funding options for the project.
“Our IOCG mineralisation at Emmie IOCG continues to offer the potential for a Tier-1 scale discovery.
“During the quarter, we completed a large-scale review of our IOCG exploration model with results released to market in
early October. This has transformed our understanding of the IOCG exploration model, and, for the first time, we have a
model that explains previous intercepts and will assist in planning the next stage of work.
“We have an exciting opportunity and will continue to progress the exploration and development of the Elizabeth Creek
copper assets which will continue in the December Quarter.”
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
2. Projects & Assets
2.1 Tenement Schedule
In accordance with ASX Listing Rule 5.3.3, Coda provides the following information about its tenements for the quarter ended 30 September 2023.
Table 1 Coda tenement schedule
Grant Date
Expiry Date
Area
km2
Ownership
Ownership Structure
SA
29 October 2017
28 October 2028
47
100%
SA
25 March 2020
24 March 2025
363
100%
7 October 2018
25 July 2023
10 October 2019
6 October 20231
24 July 2029
9 October 2024
291
202
22.4
100%
N/A
51%2
14 February 2020
13 February 2025
12.8
51%3
Tenements are held in a 70:30 split between Coda
Minerals and Torrens Mining Ltd, a wholly owned
subsidiary of Coda Minerals, resulting in effective
100% control by Coda Minerals.
Held 100% by Coda Minerals.
Coda is currently engaged in a Farm-in to the
Cameron River project and has the option to earn
up to 80% ownership by spending $2 million. The
company has reached the threshold for 51%
ownership under the Agreement.
Tenement
Project
Location
EL6141
Elizabeth Creek
EL6518
Elizabeth Creek
Application Date
EL6265
EL6917
EPM27042
Elizabeth Creek
Booleroo
Cameron River
SA
SA
Queensland
1 September 2023
EPM27053
Cameron River
Queensland
EL5455
EL7342
EL7584
EL9238
Club Terrace
Club Terrace
Club Terrace
Club Terrace
Victoria
Victoria
Victoria
NSW
19 August 2020
18 January 2021
22 October 2013
29 August 2022
29 August 2022
3 August 2021
21 October 2023 4
28 August 2027
28 August 2027
3 August 2027
8
375
108.5
260
100%
100%
100%
100%
EL7637
Balmoral
Victoria
17 June 2021
29 August 2022
28 August 2027
835
100%
EL2690
Rigo
Papua New
Guinea
26 January 2022
26 January 2024
1164
100%
N/A (refused)
N/A (refused)
126
N/A
Held by wholly owned subsidiary Torrens Mining
Ltd
Held by wholly owned subsidiary Torrens Mining
Ltd
Held by wholly owned subsidiary Torrens Mining
(PNG) Limited
Under Application5
ELA2557
Laloki
Papua New
Guinea
16 November 2017
1
Currently under renewal application
Note tenement transfer is ongoing as at current time
3
Note tenement transfer is ongoing as at current time
4 EL 5455 expired without renewal subsequent to quarter end
5 Tenure associated with the Kinloch Project applied for in JV with Boss Energy was granted subsequent to quarter end and is not included in this table.
2
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Application by wholly owned subsidiary Torrens
Mining (PNG) Limited.
2.2 Elizabeth Creek Copper-Cobalt Project Update
Elizabeth Creek Copper Cobalt Project Scoping Study
During the quarter, Coda continued optimisation of the previously released Scoping Study into the Elizabeth Creek
Scoping Study, focussing on areas such as reagent optimisation, underground mining methods, ore sorting and more.
The results of some of these studies were released during the quarter, with others either released in early October or still
in progress.
Metallurgical Flowsheet Improvements
In September, Coda announced the results of metallurgical testwork carried out on samples from Elizabeth Creek. Two
programmes of test work were carried out, one focusing on reduction of reagents consumed during flotation, the other
on leaching of flotation tailings.
Flotation Reagent Optimisation
A series of rougher flotation tests were carried out on material from the open pit Windabout deposit to begin the process
of optimisation of flotation conditions, specifically to decrease costs associated with reagent consumption. In addition to
a standard baseline test, three variant tests were carried out:
•
•
•
Reducing Cyquest (a slimes dispersant) by 50%
Reducing PAX (potassium amyl xanthate, a collector) by approximately 40%; and
Substituting PAX for SIBX (sodium isobutyl xanthate, a lower cost collector compared to PAX)
The test results showed no material change in copper or cobalt grade or final recovery for the lower cost reagent regimes
relative to the baseline, with the variations after 33 minutes generally being within the margin of error expected for single
tests.
This suggested that flotation can likely be carried out at Elizabeth Creek at a lower cost than was assumed in the Scoping
Study without compromising recovery, thereby improving overall project economics
Tails Leaching
A total of six bottle roll tests were carried out on flotation tailings from the MG14 open pit deposit6, followed by two
bottle roll tests on a more representative combined slimes and tails mix 7.
The recovery of copper to concentrate at MG14 is 57.9%, with the remainder reporting to the slimes/tails streams. A
significant percentage of the copper remaining in this stream is believed to be oxide or silicate copper, which is largely
unavailable to flotation, but may be available to leaching under certain conditions.
The bottle rolls tested a variety of principally alkaline or neutral lixiviants to avoid acid consumption given the dolomitic
component of the host shale.
The concentrations and results are summarised below as Table 2 and Table 3 respectively.
The majority of tests were “sighter” tests, where lixiviant concentrations were deliberately overdosed to ensure that
lixiviant concentration was not a limiting factor. Sample JR008 was an exception to this rule, with a more realistic lixiviant
mix tested, with concentrations based on earlier, more comprehensive testwork undertaken on tailings from the Emmie
Bluff deposit).8
This mix and the lower cyanide concentration was then carried into tests 9 and 10.
6
Tails grade: 0.42% Cu, 105 ppm Co, 6 g/t Ag, 525 ppm Zn
Combined Tails and Slimes grade: : 0.54% Cu, 130 ppm Co, 7.3 g/t Ag, 515 ppm Zn
8 See Appendix 1
7
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Table 2 Lixiviant regimes of all bottle roll tests undertaken on MG14 Slimes and Tails
640
380
50
150
100
5
5
5
15
15
10
10
10
Ammonia
523.5
Lime
100
Glycine
1,000
Sodium
Hypochlorite
Cyanide
50
Hydrochloric
Acid
Sodium
Hydroxide
70
Sodium Sulfite
Lixiviant
Cyanide
Reducing Acid
Hypochlorite
Glycine & Cyanide
Ammonia
Glycine & Cyanide
Glycine & Cyanide
Cyanide
Ferrous Sulfate
Sample Type
Tails
Tails
Tails
Tails
Tails
Tails
Slimes/Tails
Slimes/Tails
Sulfuric Acid
Test/Sample ID
JR002
JR003
JR004
JR005
JR006
JR008
JR009
JR010
1,000
Table 3 Lixiviant regimes of all bottle roll tests undertaken on MG14 Tails and Slimes
Sample Type
JR002 FINAL
JR003 FINAL
JR004 FINAL
JR005 FINAL
JR006 FINAL
JR008 FINAL
JR009 FINAL
JR010 FINAL
Tails
Tails
Tails
Tails
Tails
Tails
Slimes/Tails
Slimes/Tails
Extraction (Products)
Net Cu recovery
Lixiviant
Ag %
Cu (%)
Co (%)
Zn (%)
Assumes 57.9% recovery to float
Cyanide
Reducing Acid
Hypochlorite
Glycine & Cyanide
Ammonia
Glycine & Cyanide
Glycine & Cyanide
Cyanide
82.5%
33.6%
0.0%
70.7%
21.5%
12.0%
25.1%
0.0%
90.0%
52.6%
74.0%
82.8%
37.6%
67.7%
65.4%
33.5%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
15.4%
12.7%
0.0%
40.1%
0.0%
0.0%
0.0%
0.0%
1.8%
0.0%
95.8%
80.0%
89.1%
92.8%
73.7%
86.4%
85.4%
72.0%
Preparation for Scoping Study Update
Additional work was undertaken during the quarter in preparation for the Scoping Study update, which is expected to be
released in the December quarter. As well as the above reagent optimisation, work focussed on high-impact adjustments
including mechanical cutting, XRF ore sorting and optimisation of the metallurgical flowsheet. Much of this work was
announced subsequent to quarter end and is detailed below. The remainder, particularly the work undertaken to assess
mechanical cutting, is expected to be released early next quarter in advance of the update itself.
Copper-Cobalt (Sedimentary) Exploration
New Targets identified: ANT and Mira Geoscience
The company identified a number of drill targets adjacent to the Emmie Bluff Mineral Resource on the basis of a
combination of MT, 2D Seismic and Ambient Noise Tomography (ANT). A summary image showing these targets is
included as Figure 1, below.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Figure 1 Proposed drill hole locations and exploration rationales for exploration drilling at the Emmie Bluff deposit. 9
Magnetotelluric Programme
During the quarter, the company completed a 61-station magnetotelluric programme, focussed on defining the basin
which hosts the Tapley Hill Formation at Emmie Bluff, and in turn the Emmie Bluff Copper Cobalt Mineral Resource. Final
reports have not been received as of the publication date of this report.
IOCG Exploration
Work during the quarter focussed on geophysical interpretation of the IOCG system through a major study conducted by
Coda and geophysical consultants. This study was released in October, with some details available in “Coda does not
expect the current level of net operating cash outflows to continue in the short term, as the Company completed major
work streams during the September Quarter relating to the updated Elizabeth Creek Copper Cobalt Study, which is
expected to be delivered in the December Quarter. Future expenditure is not committed and remains at the Company’s
discretion. There were also a number of one-off administration costs during the September 2023 Quarter which will not
recur during the remainder of the 2024 financial year.
Coda ended the September 2023 Quarter with $2.8 million in cash and deposits.
The Company is currently in discussions with a range of strategic partners regarding funding for the Elizabeth Creek
Project, including the Pre-Feasibility Study. In the meantime, measures have been implemented to reduce costs wherever
possible.
Events Subsequent to Quarter-End”, below.
2.3 Future Work Programme
Coda is currently awaiting final reports into the assessment of mechanical cutting as a potential alternative underground
mining technique at Emmie Bluff. Assuming that this report confirms the technical and economic viability of mechanical
cutting, this report, in addition to the other work recently completed into optimising the Emmie Bluff project, will form
the basis of an update to the Scoping Study which was released in March of this year.
9
Map is based on results released to market on 20 April 2023. For full details, including JORC Table 1, please see “ANT Survey Transforms Understanding
of Emmie Bluff, IOCG”, available at https://www.codaminerals.com/wp-content/uploads/2023/04/20230420_COD_ANT-Survey-TransformsUnderstanding-of-Emmie-Bluff-IOCG_Release.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Coda will also undertake preparation and seek heritage and associated approvals for drill testing targets identified by
recent geophysical surveys.
The Company is undertaking peer review of recently completed geophysical studies at Emmie IOCG and will continue to
refine its model prior to designating final proposed drill targets.
Outside of the Elizabeth Creek project, the Company will advance land access negotiations at its recently granted
Booleroo (EL 6917) and Moseley East (EL 6954) tenure in South Australia.
3. Corporate
Finance & Use of Funds
Pursuant to ASX Listing Rule 5.3.2, the Company confirms that there were no mining production and development
activities during the quarter by the Company.
Total cash outflow from operating activities for the quarter was $1.9 million. This included $0.9 million in exploration and
evaluation expenditure and interest received of $42k, with the remaining expenditure was attributed to corporate and
administration costs. Of the remaining expenditure, $69k was for Directors’ fees paid during the period (refer Appendix
5B 6.1).
Coda does not expect the current level of net operating cash outflows to continue in the short term, as the Company
completed major work streams during the September Quarter relating to the updated Elizabeth Creek Copper Cobalt
Study, which is expected to be delivered in the December Quarter. Future expenditure is not committed and remains at
the Company’s discretion. There were also a number of one-off administration costs during the September 2023 Quarter
which will not recur during the remainder of the 2024 financial year.
Coda ended the September 2023 Quarter with $2.8 million in cash and deposits.
The Company is currently in discussions with a range of strategic partners regarding funding for the Elizabeth Creek
Project, including the Pre-Feasibility Study. In the meantime, measures have been implemented to reduce costs wherever
possible.
4. Events Subsequent to Quarter-End
A significant amount of activity has been undertaken in the weeks following the end of the September quarter. Please
refer to referenced announcements for additional details on each item.
Kinloch Project Granted
On the 3rd of October10, Coda announced that it, in partnership with Boss Energy, had been successful in the application
for a package of highly prospective tenure covering the Cambrian-Ordovician Delamerian Orogen basement rocks and
the overlying Cenozoic Murray Basin sediments in eastern South Australia. The tenure, awarded through the competitive
Exploration Release Area (ERA) process will be held in a JV at a formal 75:25 ownership split, with Coda holding 25%,
However, Boss and Coda have agreed to progress the mineral rights sharing arrangement, under which Coda will be
entitled to 100% of the base metal rights while Boss will be entitled to 100% of the uranium rights on the tenements. It
is expected that the parties will enter into a mineral rights sharing agreement on customary terms, with Coda to focus on
the copper and base metal potential and Boss to focus on the uranium potential as part of regional growth strategy.
Grant of ELA 2023/00034 as EL 6954
In October, Coda received confirmation from the South Australian Department for Energy and Mining of the formal grant
of EL 6954. This 72 square kilometre tenement is adjacent to and immediately south of Elizabeth Creek. The company
considers it prospective for additional shallow sediment-hosted copper-cobalt mineralisation.
10
Please
see
“Coda
Strengthens
Regional
Exploration
Pipeline”,
available
at
https://www.codaminerals.com/wpcontent/uploads/2023/10/20231003_Coda_ASX-ANN_Coda-Strengthens-Regional-Exploration-Pipeline_RELEASE.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
IOCG Geophysical Model
On the 3rd of October11, Coda announced a new geophysical interpretation of the Emmie IOCG prospect following a major
geophysical review and modelling exercise by Coda’s technical team and geophysical consultants Mira Geoscience and
NewGen Geo.
The new interpretation suggests the presence of a vast, laterally extensive mineralising system with demonstrated
potential to extend at least the 2.4km NNE from the existing Emmie IOCG discovery to Coda’s northern tenement
boundary as well as further to the south. The model developed helps explain the structural controls underpinning the
Emmie IOCG mineralisation and offers valuable explanatory and predictive power.
The review also reaffirmed the significance of a major new IOCG target, “Maggie IOCG”, located approximately 6km to
the south-east of Emmie Bluff.
Ore Sorting
On the 5th of October12, Coda released details of its assessment of the applicability of XRF ore sorting to the Emmie Bluff
deposit. The work strongly indicated the suitability of the Emmie Bluff ore body for the technology and suggested it could
effectively sort and improve the grade prior to crushing. It is expected to be particularly useful in a scenario wherein
Emmie Bluff is mechanically cut rather than mined through drill and blast methodologies.
ESG Reporting
On the 11th of October13, in line with its commitment to high levels of environmental and social governance, Coda initiated
stand-alone ESG reporting with the release of its first standalone Sustainability Report.—
This announcement has been authorised for release by the Board of Coda Minerals Ltd
Further Information:
Chris Stevens
Chief Executive Officer
Coda Minerals Limited
info@codaminerals.com
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
11
For full details, please see “Updated Geological Model Transforms IOCG Understanding”, available at https://www.codaminerals.com/wpcontent/uploads/2023/10/2023101.pdf
12
Please see “Underground Ore Sorting Success Enhances Emmie Bluff”, available at https://www.codaminerals.com/wpcontent/uploads/2023/10/2023101-1.pdf
13 Please see “Sustainability Report 2023”, available at https://www.codaminerals.com/wp-content/uploads/2023/10/2023101-1.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Coda Minerals Ltd
ABN
Quarter ended (“current quarter”)
49 625 763 957
September 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(3 months)
$A’000
-
-
(852)
(852)
(b) development
-
-
(c) production
-
-
(d) staff costs
(464)
(464)
(e) administration and corporate costs
(609)
(609)
-
-
42
42
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(1,883)
(1,883)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(2)
(2)
(d) exploration & evaluation
-
-
(e) investments
-
-
(54)
(54)
(c) property, plant and equipment
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(3 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(56)
(56)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
(20)
(20)
3.10
Net cash from / (used in) financing
activities
(20)
(20)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4,717
4,717
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(1,883)
(1,883)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(56)
(56)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(20)
(20)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(3 months)
$A’000
-
-
2,758
2,758
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,758
2,758
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,758
2,758
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
69
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,883)
8.4
Cash and cash equivalents at quarter end (item 4.6)
2,758
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
2,758
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1.46
-
$A’000
(1,883)
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: The Company does not expect the current level of net operating cash outflows to
continue in the short term, as the Company completed major work streams relating
to an imminent update to its Elizabeth Creek Scoping Study during the September
2023 Quarter and future expenditure is not committed and remains at the
Company’s discretion. Furthermore, there were a number of one-off administration
costs during the September 2023 Quarter which will not recur during remainder of
the 2024 financial year.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Yes, as an exploration company that does not generate any income, the company
maintains regular discussions with financiers in order to raise capital as and when
required. The Company is also in discussions with a range of strategic partners
regarding funding for the Elizabeth Creek Project Pre-Feasibility Study.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes, due to the reduced future expenditure along with the ability to raise capital as
and when required as explained at 8.8.1 and 8.8.2 above.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
30 October 2023
Authorised by: The Board of Coda Minerals Ltd
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.