March 2025 Quarterly Activities and Cashflow Reports
Released
Released
Announcement PDF
ASX RELEASE
29 April 2025
MARCH 2025
QUARTERLY ACTIVITIES REPORT
ASX Code: COD
Ongoing flowsheet advancements and exploration drilling further enhance the
Elizabeth Creek Copper-Cobalt-Silver Project in South Australia.
CONTENTS
1.0
Overview
2.0
Projects & Assets
2.1
Tenement
Schedule
HIGHLIGHTS
Elizabeth Creek – Copper-Cobalt Project (South Australia)
- Exploration diamond drilling successfully completed at the Emmie East exploration
prospect, encountering the first mineralised Tapley Hill Formation identified in the area
outside of the main Mineral Resource.
-
Elizabeth Creek
Copper Project
Update
Potentially large-scale second shale body identified to the south of Emmie Bluff, which
may provide additional tonnes to increase the overall scale of the Elizabeth Creek Project.
-
Two separate metallurgical testwork programmes commenced with the aim of enhancing
processing through recovery improvements and CAPEX reductions.
2.3
Future Work
Programme
-
Environmental and regulatory approvals processes for the Elizabeth Creek Project
continued to advance positively in South Australia.
3
Corporate
3.1
Finance &
2.2
Use of Funds
4
Events
Subsequent to
Quarter End
Corporate
- $4.97 million in cash on hand as at 31 March 2025.
-
Upcoming Work Programmes
- Results of the Emmie East drill programme currently being evaluated in order to better
target both copper-cobalt-silver and copper-gold mineralisation at Elizabeth Creek. The
recent drill campaign has materially improved the Company’s understanding of regional
geology and the application of geophysics to the Emmie Bluff area.
-
5
Appendix 1
Mr Chris Burton appointed as Chief Financial Officer.
Metallurgical testwork programmes currently in progress to evaluate the application of
ammoniacal leaching as well as the potential use of Halion Loop technology to processing
at Elizabeth Creek. These emerging technologies have the potential to increase recoveries
and reduce CAPEX.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN: 49 625 763 957
1. Overview
Discussing the quarter, Coda Minerals Chair, Keith Jones, said: “Coda’s primary focus during the March 2025 Quarter was
completing the exploration drilling programme at Emmie East. This programme resulted in a narrow intersection of copper
mineralisation in hole EB0038, approximately 1,600m south-east of the Emmie Bluff Resource. This is the first drill-backed
evidence of mineralised copper-bearing Tapley Hill Formation shale that we have encountered outside of Emmie Bluff
deposit itself1 – a significant development.
“The Emmie East drill programme was designed to make large step-outs from the main Resource with the goal of
identifying additional basins of copper-bearing Tapley Hill Formation shale. The success of using active seismic-based
geophysics to locate the copper host rock proximal to Emmie Bluff is extremely encouraging, and the team is now actively
investigating how these learnings can be applied to the next phase of exploration at Elizabeth Creek.
“We have recently commenced two major test work programmes aimed at both further enhancing recoveries and
reducing capital costs for the project. The first is the application of ammoniacal whole-ore leaching technology, which has
the potential to replace both flotation and Albion™ leaching within the flowsheet. The second is the use of Halion Loop
technology to replace Albion™. The team is continuing to progress these important initiatives during the June Quarter and
we look forward to reporting results in due course.
“We have continued important approvals process work as we continue to define and refine the Elizabeth Creek Project
scope under the South Australian approvals system.
“Although world markets have experienced significant turmoil during this quarter, the copper price has remained
extremely strong and we have seen an approximate 41%2 rise in the spot price of cobalt driven by reduced supply from
the DRC. Against the backdrop of a robust long-term demand outlook for critical minerals, Coda remains steadfast in our
commitment to advancing the Elizabeth Creek Project to become a major supplier of copper, cobalt and silver from South
Australia.”
Drilling at Emmie East February 2025
1 Please see here for original announcement including JORC Table 1, and compliance information.
Please see here for cautionary note on visual estimates and here for LR 5.19.2 statements.
2 Source: Benchmark Minerals – Q1 2025 Cobalt Forecast Report
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
2. Projects & Assets
2.1 Tenement Schedule
In accordance with ASX Listing Rule 5.3.3, Coda provides the following information about its tenements for the quarter ended 31 December 2024.
Table 1 Coda tenement schedule
3
Grant Date
Expiry Date
Area
km2
Ownership
SA
29 October 2017
28 October 2028
47
100%
Elizabeth Creek
SA
25 March 2020
24 March 2025
363
100%
Elizabeth Creek
Elizabeth Creek3
Cameron River
Cameron River
Kinloch
Kinloch
Kinloch
Kinloch
SA
SA
Queensland
Queensland
SA
SA
SA
SA
7 October 2018
17 October 2023
10 October 2019
14 February 2020
7 December 2023
13 December 2023
18 December 2023
18 December 2023
6 October 2029
16 October 2029
9 October 2029
13 February 2030
6 December 2029
12 December 2029
17 December 2029
17 December 2029
291
73
22.4
12.8
854
990
555
785
100%
100%
100%
100%
25%
25%
25%
25%
Tenement
Project
Location
EL 6141
Elizabeth Creek
EL 6518
EL 6265
EL 6945
EPM 27042
EPM 27053
EL 6962
EL 6963
EL 6964
EL 6965
Application Date
Tenure is adjacent to Elizabeth Creek but has not been formally integrated into the broader Elizabeth Creek Project.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Tenements are held in a 70:30 split between Coda
Minerals and Torrens Mining Ltd, a wholly owned
subsidiary of Coda Minerals, resulting in effective
100% control by Coda Minerals.
Held 100% by Coda Minerals.
Coda recently completed formal transfer of 100%
of the Cameron River project.
Held in a 25:75 split with Boss Energy. Coda has
100% base metals rights for the ground.
ELIZABETH CREEK
2.2 Elizabeth Creek Project
Emmie East Drilling4
Coda’s primary focus during the March Quarter was the completion of a 4-hole diamond drilling programme at
Emmie Bluff, designed to evaluate the potential to expand the mineralised envelope to the east and south-east.
Oxidation, in a geological context, occurs when oxygen rich fluids consume reductants which make up part of
rocks, such as the carbon which typically gives black shales their colour. Reductants are involved in the
precipitation of metals out of mineralising fluids as sulphides: if a potential host rock is oxidised before exposure
to mineralising fluids, as appears to have happened in these holes, the rock can generally no longer host
mineralisation. This is the most likely explanation for why this oxidised shale is unmineralised when the same
unit is mineralised just a few hundred metres further north at Emmie Bluff.
The four holes were designed, based primarily off geophysics, to target Tapley Hill Formation black shale, the
Emmie Bluff host rock. Of the four holes drilled, one (DD25EB0038 (“Hole 38”)) intersected a narrow band of
mineralised Tapley Hill Formation mudstone conglomerate – the first mineralised Tapley Hill Formation in the
area drilled outside of the Emmie Bluff Mineral Resource. A second nearby hole (“Hole 39”) intersected a
significantly thicker band of unmineralised, partially oxidised Tapley Hill formation shale, while two (“Hole 37”
and “Hole 39”) failed to intersect Tapley Hill formation.
Figure 1 Reducing black mud supported conglomerate in drillhole DD25EB0038, moderately mineralised with disseminated
chalcocite.
The programme’s key takeaways were:
1.
2.
3.
A significant volume of Tapley Hill formation shale exists outside the bounds of the existing Emmie
Bluff Mineral Resource, and this potential host rock is currently not closed off by drilling.
While some of that shale unit is oxidised and unmineralised, other parts are not, and the potential to
identify additional mineralisation to the south and south-east of the Emmie Bluff Mineral Resource
remains live.
The underlying basin in which the resource is hosted extends a considerable distance to the east, but
no Tapley Hill formation shale has yet been encountered in that area.
4
This section is adapted from an ASX announcement released 19 March 2025. Please see here for full details including JORC Table 1:
https://www.codaminerals.com/wp-content/uploads/2025/03/20250319_ANN_Coda_Drilling-Concludes-at-Elizabeth-Creek_vRelease.pdf
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
4.
In the absence of historical drill data, 2D seismic and depth-to-basin anomalism are the most successful
geophysical tools on which to base future drilling.
Figure 2 2025 Emmie East drill programme collar locations and estimated Tapley Hill Formation. Shale outline encountered
south of Emmie Bluff.
Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses
where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially
provide no information regarding impurities or deleterious physical properties relevant to valuations.
With a materially large second expression of Tapley Hill formation shale to the southeast of Emmie Bluff now
confirmed across three drillholes spanning approximately 1,600m, the potential scale of host rock at Emmie
Bluff has now been shown to be substantially larger than previously assumed. Although oxidation has prevented
much of the shale encountered so far from mineralising, there are significant areas to the west and northwest
of Hole 38 where potential exists for additional shale, and the area to the northeast of Hole 40 is untested by
either 2D seismic or drilling, leaving it effectively open.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
2.3 Future Work Programme
Coda is prioritising metallurgical flowsheet optimisation over the next quarter, with assessments currently
ongoing into whole-ore catalysed ammoniacal leaching and chloride leaching using the Halion Loop process, a
potentially lower cost alternative to Albion, designed to allow for the processing of copper-cobalt concentrates.
The Company intends to assess both methods and take forward the more economically attractive option with
further testwork during the June Quarter.
3. Corporate
3.1 Finance & Use of Funds
Pursuant to ASX Listing Rule 5.3.2, the Company confirms that there were no mining production and
development activities during the quarter by the Company.
Total cash outflow from operating activities for the quarter was $0.94 million. This included $0.59 million in
exploration and evaluation expenditure which included the February portion of the drilling programme, as well
as corporate administration costs of $0.46 million. Coda received interest on cash balances of $51k during the
quarter.
During the quarter ended 31 March 2025, a total of $154k was paid to the Directors of the Company as
remuneration including non-executive director fees and salary paid to the CEO & Executive Director. Please refer
to Section 6.1 of the Appendix 5B below.
During the quarter, the Company deferred the payment of 50% of Directors’ fees payable to Non-Executive Chair
and Non-Executive Directors of the Company. Following shareholder approval on 21 November 2024, these fees
are expected to be settled with the issue of shares based on the 10-day volume weighted average price in the
lead up to the end of the quarter.
The Company issued 14,616,234 quoted free attaching options with an exercise price of $0.15 and expiring on
28 March 2029 after receiving shareholder approval at a general meeting on 20 December 2024. The Company
agreed to issue the options on a 1 option for every 2 shares subscribed basis as part of the capital raising
undertaking in October and November 2024.
The Company had cash and cash equivalents of $4.97 million at the end of the quarter and is well placed to
progress its exploration and evaluation activities over the next year.
On 24 March 2025, the Company announced the appointment of Mr Chris Burton as its Chief Financial Officer.
4. Events Subsequent to Quarter-End
There were no material events subsequent to the end of the March 2025 quarter.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
This announcement has been authorised for release by the Board of Coda Minerals Ltd
Further Information:
Chris Stevens
Chief Executive Officer
Coda Minerals Limited
info@codaminerals.com
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
5. Appendix 1
5.1 Elizabeth Creek Mineral Resources
Table 2 Aggregated Mineral Resources at Elizabeth Creek
OPEN PIT
Resource
Category
Type
Proposed
Tonnage
Cut-off
Mining
Mt
Grade
Method
Copper
Cobalt
Silver
Zinc
Grade
Contained
Grade
Contained
Grade
Contained
Grade
Contained
Grade
Contained
(% Cu)
Metal (t)
(ppm Co)
Metal (t)
(g/t Ag)
Metal (Moz)
(ppm Zn)
Metal (t)
(% CuEq)
Metal (t)
684
4000
MG14
Indicated
Zambian
Open Pit
1.8
0.5% CuEq
1.2%
22,700
330
600
14
0.8
Cattle Grid South
Inferred
Breccia
Open Pit
5.8
0.2% Cu
0.6%
36,000
120
700
3.5
0.7
Windabout
Indicated
Zambian
Open Pit
17.7
0.5% CuEq
0.8%
136,100
490
8700
8
4.6
Sub Totals
Indicated
Zambian
Open Pit
19.5
0.5 CuEq
0.8%
158,800
480
9300
8.5
5.4
(Open Pit)
Inferred
Breccia
Open Pit
5.8
0.2% Cu
0.6%
36,000
120
700
3.5
1
Proposed
Tonnage
Cut-off
Mining
Mt
Grade
UNDERGROUND
Resource
Category
Type
Method
Copper Equivalent
Copper
Cobalt
1.7%
684
Silver
30,600
36,0005
1.4%
249,100
1.4%
316,000
4,000
Zinc
Copper Equivalent
Grade
Contained
Grade
Contained
Grade
Contained
Grade
Contained
Grade
Contained
(% Cu)
Metal (t)
(ppm Co)
Metal (t)
(g/t Ag)
Metal (Moz)
(ppm Zn)
Metal (t)
(% CuEq)
Metal (t)
Indicated
Zambian
Underground
37.5
1% CuEq
1.3%
485,000
590
22,000
17
20.6
1800
66000
1.9%
715,000
Emmie Bluff
Inferred
Zambian
Underground
2.7
1% CuEq
0.9%
46,000
280
1,000
12
1.1
1700
5000
1.3%
36,000
Sub Total
(Underground)
Combined Zambian
Underground
40.2
1% CuEq
1.3%
511,000
570
23,000
16.8
21.7
1700
70000
1.9%
751,000
Project Wide Total6
65.5 Mt
5
725,800t Contained Cu
33,000t contained Co
28 Moz Contained Ag
75,000t Contained Zn7
1,067,000t contain CuEq
No Copper Equivalent was calculated for Cattle Grid South. Contained CuEq tonnes quoted in this column for Cattle Grid South consist of contained copper only.
Total figures have been aggregated purely for convenience and to contextualise the specific contribution of individual Mineral Resource Estimates to the overall project scale. Grades reported are tonnage-weighted
averages of the individual Mineral Resource Estimates. Coda notes that the total figure includes resources reported at varying cut-off grades, with varying estimation techniques, metallurgical properties and proposed
mining methods. Individual Mineral Resource Estimates should be considered individually. A total copper equivalent figure has not been disclosed as Coda does not believe it is currently appropriate to calculate a
copper equivalent for the Cattle Grid South Mineral Resource Estimate. Please see below sections Statement Regarding Metal Equivalent Calculations and Competent Persons Statement for full details on the calculation
of copper equivalents and links to original releases/CP statements. Figures have been rounded for simplicity.
7 No Zinc estimate was provided for the MG14 and Windabout deposits. This figure reflects the contained tonnage solely from Emmie Bluff and Cattle Grid South.
6
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
5.2 Competent Persons’ Statements and Confirmatory Statement - Mineral Resource
Estimates
MG14 Indicated Mineral Resource: The information is extracted from the report entitled "Confirmation
Statements JORC" created on 26th October 2020 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-022989156A1003162&v=70bc033a22188bdfefb8a0b8ad3c24897ef2837d.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
Windabout Indicated Mineral Resource: The information is extracted from the report entitled "Confirmation
Statements JORC" created on 26th October 2020 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-022989156A1003162&v=70bc033a22188bdfefb8a0b8ad3c24897ef2837d.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
Emmie Bluff Mineral Resource: The information is extracted from the report entitled “Scoping Study Update
Delivers Materially Improved Economics" created on 30 January 2024 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-02766550-6A1191314.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
Cattle Grid South Mineral Resource: The information is extracted from the report entitled “Initial Copper
Resource for Cattle Grid South" created on 03 July 2024 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-028239896A1214274&v=4015c7b87631faf94ecd96975272ff9ad5cb14c3.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
5.3 Listing Rule 5.19.2
In relation to any Production Target or any forecast financial information based on any Production Target quoted
or referenced in this announcement, the Company confirms that all material assumptions underpinning both
the Production Target and any forecast financial information continue to apply and have not materially changed.
The original ASX announcement released on 3 December 2024 relating to any Production Target or forecast
financial information derived from any Production Target referenced within this announcement can be found
here.
5.4 Listing Rule 5.23.2
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements cited in this announcement and, in the case of estimates of
Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are presented have not
been materially modified from the original market announcement.
5.5 Statement Regarding Metal Equivalent Calculations
Metal Equivalent grades are quoted for one or more of the Emmie Bluff, Windabout and MG14 Mineral
Resources, or for exploration results considered by the company to be related directly to one of these Mineral
Resources, in this announcement.
For the Emmie Bluff Mineral Resource:
The Emmie Bluff Mineral Resource is reported as 40.2Mt @ 1.27% Cu, 569 ppm Co, 16.8 g/t Ag and 0.17% Zn
(1.87% Copper Equivalent (CuEq)) reported at a cut-off grade of 1% CuEq. The calculation of this metal equivalent
is based on the following assumptions.
Metal
Copper
Cobalt
Zinc
Silver
Coefficient
0.8
0.85
0.9
0.85
Forecast Price
$7,000
$55,000
$2,100
$18.50
Price Unit
USD/Tonne
USD/Tonne
USD/Tonne
USD/Oz
Price assumptions used when calculating copper equivalent grades were based primarily on Consensus
Economics forecasts of metals, except for Cobalt, which was sourced via communication with subject matter
experts. Metallurgical assumptions used when calculating copper equivalent grades were based on a simple bulk
float utilising rougher and minimal cleaner/scavenger circuits. The produced a reasonably consistent mean
recovery across most metals of between approximately 83 and 94 percent. For simplicity, and to in part account
for losses associated with less intensive cleaner floats and losses to the hydromet plant, these figures were
rounded down to the nearest 5%.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝑢𝐸𝑞% = 𝐶𝑢% + 0.00068 × 𝐶𝑜 𝑝𝑝𝑚 + 0.337 × 𝑍𝑛 % + 90.3 ×
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
𝐴𝑔 𝑝𝑝𝑚
10000
ELIZABETH CREEK
For the Windabout and MG14 Mineral Resource:
The Windabout and MG14 Mineral Resource are reported at a cut-off grade of 0.5% CuEq as:
•
•
Windabout: 17.67Mt @ 0.77% Cu, 492 ppm Co and 8 g/t Ag (1.41% CuEq)
MG14: 1.83Mt @ 1.24% Cu, 334 ppm Co and 14 g/t Ag (1.84% CuEq)
The calculation of this metal equivalent is based on the following assumptions.
Metal
Copper
Cobalt
Mining
Recovery %
0.9
0.9
Dilution %
Recovery %
Payability %
Forecast Price
Price Unit
0.05
0.05
0.6
0.85
0.7
0.75
$6,600
$55,000
USD/Tonne
USD/Tonne
Price assumptions used when calculating copper equivalent grades were based on recent historical metal prices
at the time of calculation (2018). Metallurgical assumptions are based on extensive metallurgical testwork
undertaken on the two deposits to 2018 across various potential flowsheets involving both floatation and
leaching. Ag analyses in the estimation and metallurgical testwork were considered insufficient at the time to
include in the metal equivalent calculation.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝑢𝐸𝑞% = 𝐶𝑢% + 0.0012 × 𝐶𝑜 𝑝𝑝𝑚
It is the opinion of the company that both sets of prices used in the calculations are reasonable to conservative
long-term forecasts for real dollar metal prices during the years most relevant to the deposits (approx. 20262030).
It is the opinion of the company that all of the elements included in the metal equivalent calculations have a
reasonable potential to be recovered and sold.
For full details of the Emmie Bluff Metal Equivalent calculation, please see “Scoping Study Update Delivers
Materially Improved Economics”, released to the ASX on 30th January 2024 and available at
https://www.codaminerals.com/wp-content/uploads/2024/01/20240130_Coda_ASX-ANN_Scoping-StudyUpdate-Delivers-Materially-Improved-Economics_RELEASE.pdf.
For full details of the MG14/Windabout Metal Equivalent Calculation, please see “Confirmation of Exploration
Target & Mineral Resource and Ore Reserve Statement”, released to the ASX on 23rd October 2020 and available
at https://www.codaminerals.com/wp-content/uploads/2020/10/20201026_Coda_ASX-ANN_ConfirmationStatements-JORC.pdf.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK
5.6 Forward Looking Statements
This announcement contains ‘forward-looking information’ that is based on the Company’s expectations, estimates
and projections as of the date on which the statements were made. This forward-looking information includes, among
other things, statements with respect to the Company’s business strategy, plans, development, objectives,
performance, outlook, growth, cash flow, projections, targets and expectations, mineral reserves and resources, results
of exploration and related expenses. Generally, this forward-looking information can be identified by the use of
forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘potential’, ‘likely’, ‘believe’, ‘estimate’,
‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’, ‘evolve’ and similar expressions.
Persons reading this announcement are cautioned that such statements are only predictions, and that the Company’s
actual future results or performance may be materially different. Forward-looking information is subject to known and
unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of activity,
performance or achievements to be materially different from those expressed or implied by such forward-looking
information.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Coda Minerals Ltd
ABN
Quarter ended (“current quarter”)
49 625 763 957
March 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(9 months)
$A’000
-
-
(585)
(1,313)
(b) development
-
-
(c) production
-
-
(d) staff costs
(184)
(769)
(e) administration and corporate costs
(276)
(963)
-
-
51
130
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(994)
(2,915)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
(4)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
-
(4)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
5,091
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(539)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (Lease payment including interest)
(30)
(93)
3.10
Net cash from / (used in) financing
activities
(30)
4,459
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
5,991
3,427
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(944)
(2,915)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
(4)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(30)
4,459
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equ
Share your feedback
Discover