SEPTEMBER 2025
QUARTERLY ACTIVITIES REPORT
Transformational flowsheet breakthrough during the quarter fundamentally re-
bases the Elizabeth Creek Copper Silver Project.
HIGHLIGHTS
Elizabeth Creek – Copper-Silver Project (South Australia)
- Adoption of a simplified whole-ore leach flowsheet for the 100% owned Elizabeth Creek
Copper-Silver Project. The new flowsheet replaces the prior flotation & Albion circuit,
delivering higher copper & silver recoveries while reducing technical and marketing risk.
- Uplifted life-of-mine production: copper increased to approx. 454 kt Cu and silver to
approx. 20 Moz Ag under the revised flowsheet (from approx. 384 kt Cu and approx. 16
Moz Ag). Steady-state annual run-rate expected at ~31 kt pa copper and ~1.4 Moz pa
silver.
- Improved project economics: Pre-tax NPV(7) of ~A$1.29 billion and IRR of ~39% (versus
~A$1.2 billion & ~35% in the 2024 scoping case). Spot commodity prices have improved
materially since the model was run, offering a strong upside case.
- Reduced capital and operating cost metrics: Total CAPEX cut by ~A$74 million, and
operating cost (OPEX) reduced by ~A$7.50/t (approx. 19%), with payback period
shortened from ~4.0 years to ~3.25 years.
- Cobalt repositioned as optional upside rather than base-case dependency.
Corporate
- $3.01 million in cash on hand as at 30 September 2025.
- Subsequent to quarter end, the Company raised Approximately $12.33 million before
costs by way of an Entitlement Offer and Institutional Placement.
- Cash on hand following completion of the raise expected to be approximately $14
million.
Upcoming Work Programmes
- Drilling on site has commenced (three rigs currently operating onsite) with major news
flow to come from ambitious work programme in the remainder of 2025 and into 2026.
- Elizabeth Creek Copper-Silver Project Pre-Feasibility Study (PFS) now fully funded to
completion of all material workstreams including piloting and contingency.
ASX RELEASE
30 October 2025
ASX Code: COD
CONTENTS
1.0 Overview
2.0 Projects & Assets
2.1 Tenement
Schedule
2.2 Elizabeth Creek
Copper Project
Update
2.3 Future Work
Programme
3 Corporate
3.1 Finance &
Use of Funds
4 Events
Subsequent to
Quarter End
5 Appendix 1
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
1. Overview
Discussing the quarter, Coda Minerals Chair, Keith Jones, said: “The September quarter was an important period for the
Company. In August, we released updated project economics for Elizabeth Creek under a whole-ore chloride leach
flowsheet. The results demonstrated a materially stronger outcome, with a post-tax NPV(7) of $1.23 billion at then-spot
prices, which have since improved further.1
“The update established a clearer and more robust foundation for the project. By focusing on copper and silver, we have
aligned the development strategy with commodities that offer greater liquidity and lower execution risk. Cobalt remains
part of the longer-term opportunity, but the base case now reflects a simpler and more resilient pathway to development.
“The market’s response was positive, with a lift in our share price and the successful completion of a fully underwritten
capital raising. This leaves Coda well-funded to advance the current PFS work program.
“Field activity has now commenced with a 19-hole, 6,000-metre drilling program at Elizabeth Creek. This program will
provide essential samples for geotechnical, metallurgical and hydrogeological studies, all of which form key components
of the PFS.
“We look forward to keeping shareholders informed as the drilling progresses and as the PFS continues to advance over
the coming months.”
Figure 1: PFS drilling at Emmie Bluff
1 Please see announcement on 28 August 2025.
Please see Appendix below for confirmatory statements LR5.19.2, LR5.23.2
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
2. Projects & Assets
2.1 Tenement Schedule
In accordance with ASX Listing Rule 5.3.3, Coda provides the following information about its tenements for the quarter ended 30 September 2025.
Table 1 Coda tenement schedule
Tenement Project Location Application Date Grant Date Expiry Date
Area
km2 Ownership
EL 6141 Elizabeth Creek SA 29 October 2017 28 October 2028 47 100% Tenements are held in a 70:30 split between Coda
Minerals and Torrens Mining Ltd, a wholly owned
subsidiary of Coda Minerals, resulting in effective
100% control by Coda Minerals.
EL 6518 Elizabeth Creek SA 25 March 2020 24 March 20252 363 100%
EL 6265 Elizabeth Creek SA 7 October 2018 6 October 2029 291 100%
EL 6945 Elizabeth Creek3 SA 17 October 2023 16 October 2029 73 100% Held 100% by Coda Minerals.
EPM 27042 Cameron River Queensland 10 October 2019 9 October 2029 22.4 100% Coda recently completed formal transfer of 100%
of the Cameron River project.
EPM 27053 Cameron River Queensland 14 February 2020 13 February 2030 12.8 100%
EL 6962 Kinloch SA 7 December 2023 6 December 2029 854 25% Held in a 25:75 split with Boss Energy. Coda has
100% base metals rights for the ground.
EL 6963 Kinloch SA 13 December 2023 12 December 2029 990 25%
EL 6964 Kinloch SA 18 December 2023 17 December 2029 555 25%
EL 6965 Kinloch SA 18 December 2023 17 December 2029 785 25%
2
A renewal application for EL 6518 was lodged with the SA DEM on the 5th
of February 2025, in line with standard renewal procedures. All tenement obligations have been met, and the Company anticipates renewal
will be authorised in the coming weeks.
3
Tenure is adjacent to Elizabeth Creek but has not been formally integrated into the broader Elizabeth Creek Project.
ELIZABETH
CREEK
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
2.2 Elizabeth Creek Project
Elizabeth Creek Economic Update4
During the September Quarter, Coda released an updated economic estimate for the Elizabeth Creek Project
based on breakthrough metallurgical improvements first announced to the market in the previous quarter. The
new flowsheet, based on whole-ore chloride leaching, saw numerous improvements across several areas:
Increased Production
Planned production of 454kt of copper and 20Moz of silver over the life-of-mine represents a
material increase from the previous estimate (384kt of copper and 16Moz of silver).
Improvements have been driven by increased recoveries (94.8% Cu and 98.2% Ag for whole-
ore chloride leach vs 82.8% Cu and 82% Ag for flotation).
Annual estimated steady state production has improved to approximately 31ktpa copper,
1.4MOzpa silver5.
Simplified Project
Streamlined flowsheet making use of whole-ore leach to entirely eliminate the flotation
circuit, replacing it with straightforward tank leach.
Reduced CAPEX/OPEX
Total CAPEX has been reduced by a total of $74 million, with the estimated total CAPEX
payback period reduced from 4.0 years to 3.25 years. The new estimate suggests the project
as designed would see a capital intensity of $10,222 USD/t Cu, based on steady-state annual
production.
Project Financials
The revised economics delivered an estimated pre-tax NPV(7) of approximately $1.29 billion
and a pre-tax IRR of 39%. Post-tax, the estimated NPV(7) was estimated at $855 million with an
IRR of 30%.
These results are based on US$9,260/t (US$ 4.20/lb) copper and US $30/oz silver and AUD
exchange rate of 0.68USD.
These figures increased materially when they were calculated at then-current SPOT copper
and silver prices ($9,718 USD/t Cu and $39/Oz Ag respectively) to NPV(7) of approximately
$1.81 billion and 48% IRR pre-tax and $1.23 billion and 38% post tax. Since that announcement,
both commodities have continued to improve, with copper today materially exceeding
$10,500 USD/t and silver approaching $50 USD/Oz.
Economic estimates based on the earlier flowsheet saw slightly weaker economic returns, with
Pre-tax NPV(7) of ~A$1.2B and IRR of 35% in the 2024 Scoping Study6.
The new results are based on a purely copper-silver base case, with cobalt currently not
accounted for in the economics. The Company is continuing to develop its cobalt extraction
flowsheet, and anticipates that cobalt will be reintroduced following additional test work,
offering attractive future potential upside.
4
This section is adapted from an ASX announcement released 28 August 2025. Please see here for full details including JORC Table 1:
https://codaminerals.com/announcements/7126651
5
Increased from 26.7ktpa copper and 1.1MOzpa under the previous flowsheet.
6
Coda’s last Scoping Study Update, released to the market on 3 December 2024, is available at
https://codaminerals.com/announcements/6690414
ELIZABETH
CREEK
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
This re-modelling is not intended to suggest that the Company has chosen to abandon the
extraction of cobalt; rather, it is intended to demonstrate the metallurgical improvements
achieved to date, and also to demonstrate the project’s robust economics with revenue purely
from copper and silver, which exhibit significantly less commodity risk than cobalt.
Environmental Approvals
On 11 July, Coda announced that it had submitted a Draft Scoping Report for the Elizabeth Creek Copper-
Cobalt Project to the South Australian Department for Energy and Mining (DEM) 7. In the weeks since, Coda has
received feedback on the report and is currently preparing a Final Scoping Report for submission and final sign
off by the SA Government.
Once this final step is completed and the Scoping Report is gazetted, it will formalise an agreement between
Coda and the State outlining the specific scope of environmental studies and data collection required before a
Mining Lease can be granted. This will provide Coda with a clear, transparent pathway to project approvals and
help reduce the risks typically associated with this crucial stage of project development.
3. Corporate
3.1 Finance & Use of Funds
Pursuant to ASX Listing Rule 5.3.2, the Company confirms that there were no mining production and
development activities during the quarter by the Company.
The Company incurred total cash outflow from operating activities of $0.9 million for the quarter ended 30
September 2025. This included $0.39 million in exploration and evaluation expenditure with activity focused on
continued metallurgical test work and early-stage pre-feasibility planning costs. The quarterly corporate costs
included a number of year end compliance items as well as statutory costs and administration costs totalling
$0.33 million. Coda received its 30 June 2024 R&D tax incentive claim of $34k in additional to interest on cash
balances of $34k during the quarter.
During the quarter ended 30 September 2025, a total of $192k was paid to the Directors of the Company as
remuneration including non-executive director fees, and salary (including a short-term incentive bonus) paid to
the CEO & Executive Director. Please refer to Section 6.1 of the Appendix 5B below.
The Company issued 400,000 fully paid ordinary shares at an issue price of $0.075 pursuant to an investor
relations agreement with Cumulus Wealth Pty Ltd as part of the on-going corporate advisory support.
The Company ended the quarter with $3.01 million in cash and cash equivalents and subsequent to quarter end
completed a non-renounceable pro-rata entitlement offer to place the Company in a strong cash position to
progress the next phase of its exploration activities.
On the 8th September 2025 announced an underwritten non-renounceable, pro rata entitlement offer of 1 New
Share for every 3 Shares held by Eligible Shareholders, together with 1 attaching New Option (exercisable at 15
cents, expiry 28 March 2029) for every 4 New Shares subscribed, at an issue price of $0.10 per New Share, to
raise up to approximately $8,331,831.9 before costs to advance pre-feasibility studies and project
development at the Elizabeth Creek Copper-Silver Project.
Cumulus Wealth Pty Ltd (AFSL 524450) (Cumulus) and Leeuwin Wealth Pty Ltd (AFSL 561674) (Leeuwin) have
been engaged as joint lead managers to the Entitlement Offer (Joint Lead Managers). The Entitlement Offer was
fully underwritten by Leeuwin (83,318,319 New Shares for $8,331,831.90).
7
Please see “Key Approvals Milestone Achieved at Elizabeth Creek”, released 11 July 2025, available at https://www.codaminerals.com/wp-
content/uploads/2025/07/20250711_ANN_Coda_Key-Approvals-Milestone-Achieved-at-Elizabeth-Creek_vRelease.pdf
ELIZABETH
CREEK
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
4. Events Subsequent to Quarter-End
On the 1st of October, the Company released its 2024-25 annual report8.
On 22nd October 2025 the Company announced that the Entitlement Offer had closed oversubscribed raising
the full amount contemplated under the Prospectus.
On 27th October 2025 the Company announced that it had undertaken a placement to Institutional and
Sophisticated to raise approximately $4m before costs. The Placement, led by Cumulus Wealth Pty Ltd (AFSL
524450) (“Cumulus Wealth”) and Leeuwin Wealth Pty Ltd (AFSL561674) (“Leeuwin Wealth”), has closed fully
subscribed with firm commitments received to raise approximately $4 million (before costs). The Placement was
made to institutional and sophisticated investors. The Placement was undertaken at $0.105 per Share and with
the same entitlement to attaching Options as the Entitlement Offer.
The commitments comprise 38,095,239 new Shares at $0.105 per Placement Share, together with 9,523,810
quoted, attaching CODO Options, to be issued on the basis of one (1) attaching Option for every four (4)
Placement Shares subscribed under the Placement. The Placement was very well supported with bids received
materially exceeding the targeted amount.
The Company expects to have approximately $14m in cash at bank after costs and following settlement of the
Entitlement off and Placement.
On early October, Coda mobilised drill rigs to Elizabeth Creek to commence a major drill programme as part of
its ongoing PFS. The programme, which is anticipated to run until the end of the year, will consist of a planned
19 holes across all four established Mineral Resources, for a total of approximately 6,000 – 7,000m. The drilling
is designed to improve data density within Mineral Resources, confirm geotechnical properties in support of
upcoming mining studies, and provide sufficient sample to undertake metallurgical test work required to
complete the PFS, including, if needed, piloting of the whole-ore leach flowsheet.
Figure 2 Drill rig on site at Elizabeth Creek during the October drill programme.
8
The 2024-25 Annual Report is available at https://codaminerals.com/announcements/7178934
ELIZABETH
CREEK
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
This announcement has been authorised for release by the Board of Coda Minerals Ltd
Further Information:
Chris Stevens
Chief Executive Officer
Coda Minerals Limited
info@codaminerals.com
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
ELIZABETH
CREEK
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
5. Appendix 1
5.1 Elizabeth Creek Mineral Resources
Table 2 Aggregated Mineral Resources at Elizabeth Creek
OPEN PIT Proposed Tonnage Cut-off Copper Cobalt Silver Zinc Copper Equivalent
Resource Category Type Mining Mt Grade Grade Contained Grade Contained Grade Contained Grade Contained Grade Contained
Method (% Cu) Metal (t) (ppm Co) Metal (t) (g/t Ag) Metal (Moz) (ppm Zn) Metal (t) (% CuEq) Metal (t)
MG14 Indicated Zambian Open Pit 1.8 0.5% CuEq 1.2% 22,700 330 600 14 0.8 1.7% 30,600
Cattle Grid South Inferred Breccia Open Pit 5.8 0.2% Cu 0.6% 36,000 120 700 3.5 0.7 684 4000 36,0009
Windabout Indicated Zambian Open Pit 17.7 0.5% CuEq 0.8% 136,100 490 8700 8 4.6 1.4% 249,100
Sub Totals Indicated Zambian Open Pit 19.5 0.5 CuEq 0.8% 158,800 480 9300 8.5 5.4 1.4% 316,000
(Open Pit) Inferred Breccia Open Pit 5.8 0.2% Cu 0.6% 36,000 120 700 3.5 1 684 4,000
UNDERGROUND Proposed Tonnage Cut-off Copper Cobalt Silver Zinc Copper Equivalent
Resource Category Type Mining Mt Grade Grade Contained Grade Contained Grade Contained Grade Contained Grade Contained
Method (% Cu) Metal (t) (ppm Co) Metal (t) (g/t Ag) Metal (Moz) (ppm Zn) Metal (t) (% CuEq) Metal (t)
Indicated Zambian Underground 37.5 1% CuEq 1.3% 485,000 590 22,000 17 20.6 1800 66000 1.9% 715,000
Emmie Bluff Inferred Zambian Underground 2.7 1% CuEq 0.9% 46,000 280 1,000 12 1.1 1700 5000 1.3% 36,000
Sub Total
(Underground)
Combined Zambian Underground 40.2 1% CuEq 1.3% 511,000 570 23,000 16.8 21.7 1700 70000 1.9% 751,000
Project Wide Total10 65.5 Mt 725,800t Contained Cu 33,000t contained Co 28 Moz Contained Ag 75,000t Contained Zn11 1,067,000t contain CuEq
9
No Copper Equivalent was calculated for Cattle Grid South. Contained CuEq tonnes quoted in this column for Cattle Grid South consist of contained copper only.
10
Total figures have been aggregated purely for convenience and to contextualise the specific contribution of individual Mineral Resource Estimates to the overall project scale. Grades reported are tonnage-weighted
averages of the individual Mineral Resource Estimates. Coda notes that the total figure includes resources reported at varying cut-off grades, with varying estimation techniques, metallurgical properties and proposed
mining methods. Individual Mineral Resource Estimates should be considered individually. A total copper equivalent figure has not been disclosed as Coda does not believe it is currently appropriate to calculate a
copper equivalent for the Cattle Grid South Mineral Resource Estimate. Please see below sections Statement Regarding Metal Equivalent Calculations and Competent Persons Statement for full details on the calculation
of copper equivalents and links to original releases/CP statements. Figures have been rounded for simplicity.
11
No Zinc estimate was provided for the MG14 and Windabout deposits. This figure reflects the contained tonnage solely from Emmie Bluff and Cattle Grid South.
ELIZABETH
CREEK
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
5.2 Competent Persons’ Statements and Confirmatory Statement - Mineral Resource
Estimates
MG14 Indicated Mineral Resource: The information is extracted from the report entitled "Confirmation
Statements JORC" created on 26th October 2020 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-02298915-
6A1003162&v=70bc033a22188bdfefb8a0b8ad3c24897ef2837d.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
Windabout Indicated Mineral Resource: The information is extracted from the report entitled "Confirmation
Statements JORC" created on 26th October 2020 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-02298915-
6A1003162&v=70bc033a22188bdfefb8a0b8ad3c24897ef2837d.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
Emmie Bluff Mineral Resource: The information is extracted from the report entitled “Scoping Study Update
Delivers Materially Improved Economics" created on 30 January 2024 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-02766550-6A1191314.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
Cattle Grid South Mineral Resource: The information is extracted from the report entitled “Initial Copper
Resource for Cattle Grid South" created on 03 July 2024 and is available to view at:
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-02823989-
6A1214274&v=4015c7b87631faf94ecd96975272ff9ad5cb14c3.
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in the case of estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
ELIZABETH
CREEK
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
5.3 Listing Rule 5.19.2
In relation to any Production Target or any forecast financial information based on any Production Target quoted
or referenced in this announcement, the Company confirms that all material assumptions underpinning both
the Production Target and any forecast financial information continue to apply and have not materially changed.
The original ASX announcement released on 3 December 2024 relating to any Production Target or forecast
financial information derived from any Production Target referenced within this announcement can be found
here.
5.4 Listing Rule 5.23.2
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements cited in this announcement and, in the case of estimates of
Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are presented have not
been materially modified from the original market announcement.
5.5 Statement Regarding Metal Equivalent Calculations
Metal Equivalent grades are quoted for one or more of the Emmie Bluff, Windabout and MG14 Mineral
Resources, or for exploration results considered by the company to be related directly to one of these Mineral
Resources, in this announcement.
For the Emmie Bluff Mineral Resource:
The Emmie Bluff Mineral Resource is reported as 40.2Mt @ 1.27% Cu, 569 ppm Co, 16.8 g/t Ag and 0.17% Zn
(1.87% Copper Equivalent (CuEq)) reported at a cut-off grade of 1% CuEq. The calculation of this metal equivalent
is based on the following assumptions.
Metal Coefficient Forecast Price Price Unit
Copper 0.8 $7,000 USD/Tonne
Cobalt 0.85 $55,000 USD/Tonne
Zinc 0.9 $2,100 USD/Tonne
Silver 0.85 $18.50 USD/Oz
Price assumptions used when calculating copper equivalent grades were based primarily on Consensus
Economics forecasts of metals, except for Cobalt, which was sourced via communication with subject matter
experts. Metallurgical assumptions used when calculating copper equivalent grades were based on a simple bulk
float utilising rougher and minimal cleaner/scavenger circuits. The produced a reasonably consistent mean
recovery across most metals of between approximately 83 and 94 percent. For simplicity, and to in part account
for losses associated with less intensive cleaner floats and losses to the hydromet plant, these figures were
rounded down to the nearest 5%.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝑢𝐸𝑞% = 𝐶𝑢% + 0.00068 × 𝐶𝑜 𝑝𝑝𝑚 + 0.337 × 𝑍𝑛 % + 90.3 ×
𝐴𝑔 𝑝𝑝𝑚
10000
ELIZABETH
CREEK
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
For the Windabout and MG14 Mineral Resource:
The Windabout and MG14 Mineral Resource are reported at a cut-off grade of 0.5% CuEq as:
• Windabout: 17.67Mt @ 0.77% Cu, 492 ppm Co and 8 g/t Ag (1.41% CuEq)
• MG14: 1.83Mt @ 1.24% Cu, 334 ppm Co and 14 g/t Ag (1.84% CuEq)
The calculation of this metal equivalent is based on the following assumptions.
Metal Mining
Recovery %
Dilution % Recovery % Payability % Forecast Price Price Unit
Copper 0.9 0.05 0.6 0.7 $6,600 USD/Tonne
Cobalt 0.9 0.05 0.85 0.75 $55,000 USD/Tonne
Price assumptions used when calculating copper equivalent grades were based on recent historical metal prices
at the time of calculation (2018). Metallurgical assumptions are based on extensive metallurgical testwork
undertaken on the two deposits to 2018 across various potential flowsheets involving both floatation and
leaching. Ag analyses in the estimation and metallurgical testwork were considered insufficient at the time to
include in the metal equivalent calculation.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝑢𝐸𝑞% = 𝐶𝑢% + 0.0012 × 𝐶𝑜 𝑝𝑝𝑚
It is the opinion of the company that both sets of prices used in the calculations are reasonable to conservative
long-term forecasts for real dollar metal prices during the years most relevant to the deposits (approx. 2026-
2030).
It is the opinion of the company that all of the elements included in the metal equivalent calculations have a
reasonable potential to be recovered and sold.
For full details of the Emmie Bluff Metal Equivalent calculation, please see “Scoping Study Update Delivers
Materially Improved Economics”, released to the ASX on 30th January 2024 and available at
https://www.codaminerals.com/wp-content/uploads/2024/01/20240130_Coda_ASX-ANN_Scoping-Study-
Update-Delivers-Materially-Improved-Economics_RELEASE.pdf.
For full details of the MG14/Windabout Metal Equivalent Calculation, please see “Confirmation of Exploration
Target & Mineral Resource and Ore Reserve Statement”, released to the ASX on 23rd October 2020 and available
at https://www.codaminerals.com/wp-content/uploads/2020/10/20201026_Coda_ASX-ANN_Confirmation-
Statements-JORC.pdf.
ELIZABETH
CREEK
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
5.6 Forward Looking Statements
This announcement contains ‘forward-looking information’ that is based on the Company’s expectations, estimates
and projections as of the date on which the statements were made. This forward-looking information includes, among
other things, statements with respect to the Company’s business strategy, plans, development, objectives,
performance, outlook, growth, cash flow, projections, targets and expectations, mineral reserves and resources, results
of exploration and related expenses. Generally, this forward-looking information can be identified by the use of
forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘potential’, ‘likely’, ‘believe’, ‘estimate’,
‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’, ‘evolve’ and similar expressions.
Persons reading this announcement are cautioned that such statements are only predictions, and that the Company’s
actual future results or performance may be materially different. Forward-looking information is subject to known and
unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of activity,
performance or achievements to be materially different from those expressed or implied by such forward-looking
information.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Coda Minerals Ltd
ABN Quarter ended (“current quarter”)
49 625 763 957 September 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(a) exploration & evaluation (388) (388)
(b) development - -
(c) production - -
(d) staff costs (245) (245)
(e) administration and corporate costs (333) (333)
1.3 Dividends received (see note 3) - -
1.4 Interest received 34 34
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives 34 34
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(898) (898)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities - -
(b) tenements - -
(c) property, plant and equipment (20) (20)
(d) exploration & evaluation - -
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report