31 December 2020 Half Year Financial Report
Released
Released
Announcement PDF
Coda Minerals Ltd.
ABN: 49 625 763 957
Directors’ Report and
Half Year Financial Report
31 December 2020
Half-Year Financial Report
DIRECTORS’ REPORT
For the period ended 31 December 2020
The directors present their report together with the financial statements of Coda Minerals Ltd (‘the Company’ or ‘Coda’) for the
half-year ended 31 December 2020 and the Auditor’s Review Report thereon. In order to comply with the provisions of the
Corporations Act 2001, the Directors’ report as follows:
1. DIRECTORS
The directors of the Company at any time during or since the end of the financial period were:
Name & Qualifications
Period of Directorship
Mr Keith F Jones
BBus, FCA, FAICD
Chairman
Mr Andrew Marshall
I Eng(UK), MAICD
Non-Executive Director
Mr Colin Moorhead
BSc (Hons), FAusIMM (CP), FSEG, GAICD
Non-Executive Director
Mr Paul Hallam
BE(Hons)Mining, FAICD, FAusIMM
Non-Executive Director
Mr Christopher Stevens
BA (Hons), MA (Oxon), MSc, GAICD, FAusIMM
Chief Executive Officer and Executive Director
Mr Li Zhiqi
Bachelor Degree of Engineering in Materials Management
Non-Executive Director
Mr Zhu Changjiang
Bachelor of Mining Mechanical Engineering
Non-Executive Director
Director and Chairman since 26 April
2018
Director since 19 July 2019
Director since 21 August 2019
Director since 21 August 2019
Director since 26 April 2018
Appointed Director 22 May 2020
Resigned 25 August 2020
Appointed Director 22 May 2020
2. PRINCIPAL ACTIVITIES
The principal activities of the Company during the year were the progression of exploration and evaluation activities
associated with the Elizabeth Creek Copper Cobalt Project (previously known as the Mt Gunson Copper Cobalt Project),
exploration for and evaluation of projects and potential joint ventures with other mining companies to explore for minerals.
3. REVIEW OF OPERATIONS
Overview and strategy
Coda’s business strategy is to build long term shareholder value through the exploration and commercialisation of
copper, gold, cobalt and other base and battery minerals in the world’s premier mining jurisdictions.
Coda’s primary focus is on exploration and development opportunities at its Elizabeth Creek Copper Project in South
Australia. The Company has a dual strategy for success at Elizabeth Creek. Firstly, it is working to further define and
extend known Zambian style copper-cobalt resources across multiple prospects, including Emmie Bluff, Powerline,
MG14 North and Hannibal. Secondly, it is now preparing to drill-test copper-gold IOCG targets including Elaine, Elizabeth
North, Chianti and also Emmie Bluff Deeps, which were recently redefined through extensive geophysical work.
Key events for the half year ended 31 December 2020:
Coda was officially admitted to the ASX on 26th October 2020 and commenced trading on the 28th of October 2020,
following a successful, heavily oversubscribed IPO.
The IPO raised a total of $8.5M at an issue price of $0.30 per share, which is funding an aggressive exploration campaign
across the Elizabeth Creek project.
Immediately following listing, Coda commenced exploration drilling at its flagship Emmie Bluff prospect, with 10 RC precollars and 7 diamond tails completed to the end of the half year.
On 22 January 2021 Coda announced that it had increased its holding to 70% in the Elizabeth Creek Copper Cobalt
Project as a result of satisfaction of the Stage 3 Earning Obligation under the Farm-in and Joint Venture Agreement with
Terrace Mining Pty Ltd. As a result of Coda reaching the Stage 3 Earning Obligation, Terrace has granted Coda an
irrevocable option to acquire an additional 5% interest in the Project for a payment of A$1.5M. This option may be
exercised at any time up to 60 days from the parties reaching a Decision to Mine.
Investment in Coda
On 3 July 2020, the Company granted 6,000,000 options to key management personnel as part of the Employee Incentive
Plan. The options issued were in the form of a Premium exercise price options “PEPO”. The options carry an exercise
price of $0.2145 per option and vesting conditions requiring continued service, and the Company’s ASX listed share price
DIRECTORS’ REPORT
For the period ended 31 December 2020
achieving the following hurdle prices of $0.23, $0.27, and $0.30 for each third of options granted. The options may be
exercised on or before 3 July 2024.
The Company issued 10,117,162 shares on 9 July 2020 following completion of its Entitlement Offer, (Prospectus dated
8th June 2020). An additional 13,603,037 shares were issued on 6 August 2020 on completion of the shortfall allocation
following the Entitlement Offer. The Entitlement Offer was a pro-rata non-renounceable entitlement offer of one New
Share for every Share held by Eligible Shareholders at an issue price of $0.10 per New Share. The funds raised were to
further exploration and evaluation of the Elizabeth Creek Project, general working capital and to fund the costs of the
Entitlement Offer.
The Company issued 28,333,334 shares on 22 October 2020 following an offer to the public under Prospectus dated 8th
June 2020 and Supplementary Prospectus dated 18 September 2020. Shares were issued at an issue price of $0.30
per share raising a total of $8,500,000. The funds raised will be used to further exploration and evaluation of the Elizabeth
Creek Project, general working capital and to fund the costs associated with the initial public offer.
Material business risks
The material business risks faced by Coda are considered below:
COVID-19
The ongoing COVID-19 pandemic affecting Australia and the world has had a limited impact on Coda’s operations with
restrictions on interstate travel and challenges associated with maintaining government recommended social distancing
practices being the key areas the Company has had to consider. Although these factors have the potential to impact Coda’s
ability to undertake fieldwork safely and cost effectively, the impact to date has been limited during the current field
programme. The Company has retained experienced, South Australia based geologists and field staff who are not required
to cross state borders. . The Company’s COVID-19 management plan has been established to address the ongoing potential
future impact. The Company will continue to monitor and manage the impact on its operations.
4. FINANCIAL POSITION
As at 31 December 2020, Coda had cash and cash equivalents of $11,781,926 (30 June 20: $4,192,295) and net current
assets of $13,220,130 (30 June 20: $5,771,377).
For the half year period ending on 31 December 2020, Coda recorded a loss of $2,497,886 (31 December 2019: $1,720,669)
and experienced net operating cash outflows of $2,218,864 (31 December 2019: $1,513,938).
5. GOING CONCERN
The Directors believe that Coda will continue as a going concern, and as a result the financial information has been prepared
on a going concern basis, which contemplates the continuity of normal business activity and the realisation of assets and
the settlement of liabilities in the normal course of business.
The Directors believe that, based on current conditions and performance assumptions, that Coda is sufficiently funded to
meet its anticipated near-term funding needs, including required expenditure under the Elizabeth Creek Copper Cobalt
Project over the next 12 months. Notwithstanding this, the Board may seek additional capital in the form of a further Equity
Capital Raising if required in furtherance of Coda’s business objectives, including to enable acceleration of the maturation
of the Elizabeth Creek exploration program.
6. EVENTS SUBSEQUENT TO REPORTING DATE
Other than as set out below or elsewhere in this Half Year Financial Report, no matters or circumstances have arisen since
the end of the financial year:
On 31 January 2021 the WA Government mandated a 5-day lockdown due to potential transmission of COVID-19 from
hotel quarantine into the wider WA community. The lockdown and associated requirements had no impact on Coda’s
operations during the lockdown period. As at the date of this report all associated restrictions have been removed. Please
refer to COVID-19 statement above for information regarding ongoing monitoring of COVID-19 impacts.
1
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
DIRECTORS’ REPORT
For the period ended 31 December 2020
7. AUDITOR INDEPENDENCE
A copy of the auditor’s independence declaration as required under section 307C of the Corporations Act 2001 is set out
on page 2.
Signed in accordance with a resolution of Directors at Perth, WA on 24 February 2021.
K F Jones
Director
2
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
AUDITOR’S INDEPENDENCE DECLARATION
For the period ended 31 December 2020
3
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
AUDITOR’S INDEPENDENCE DECLARATION
For the period ended 31 December 2020
4
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
AUDITOR’S INDEPENDENCE DECLARATION
For the period ended 31 December 2020
5
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
DIRECTORS’ DECLARATION
For the period ended 31 December 2020
In the opinion of the directors of Coda Minerals Ltd (“the Company”):
(a) the financial statements and notes, are in accordance with the Corporations Act 2001, including:
(i)
giving a true and fair view of the financial position of the Company as at 31 December 2020 and of its
performance, for the six month period ended on that date; and
(ii)
complying with Australian Accounting Standards and the Corporations Act 2001; and
(b) there are reasonable grounds to believe that the Company will be able to pay its debts as and when they become
due and payable.
Dated at Perth this 24 day of February 2021.
Signed in accordance with a resolution of the directors.
_______________________
KF Jones
Director
6
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
Coda Minerals Limited
Condensed Statement of Profit or Loss and Other Comprehensive Income
For the period ended 31 December 2020
Condensed statement of profit or loss and other
comprehensive income
Note
31 December
2020
$
31 December
2019
$
Other income
4
37,500
-
Administration expenses
Exploration & evaluation expenses
Corporate finance expenses
Other expenses
Results from operating activities
5(a)
5(b)
5(c)
5(d)
(782,905)
(1,421,506)
(271,248)
(59,363)
(2,535,022)
(710,837)
(559,949)
(396,855)
(55,663)
(1,723,304)
Finance income
Finance expenses
4
5(e)
3,678
(4,042)
9,451
(6,816)
Loss before income tax
(2,497,886)
(1,720,669)
Income tax benefit / (expense)
Loss for the period attributable to owners of the
Company
(2,497,886)
(1,720,669)
-
-
(2,497,886)
(1,720,669)
Other comprehensive income
Total comprehensive (loss) for the period attributable
to owners of the Company
Earnings per share
Basic and diluted (loss) per share
12
($0.039)
($0.05)
The condensed statement of profit or loss and other comprehensive income is to be read in conjunction with the notes to
the financial statements. Refer to Note 2 on basis of preparation.
7
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
Coda Minerals Limited
Condensed Statement of Financial Position
as at 31 December 2020
Condensed statement of financial position
Note
CURRENT ASSETS
Cash and cash equivalents
Trade and other receivables
Prepayments
Other assets
TOTAL CURRENT ASSETS
NON CURRENT ASSETS
Exploration licence bonds
Property, plant and equipment
Intangible assets
Exploration and evaluation assets
TOTAL NON-CURRENT ASSETS
6
8
7
TOTAL ASSETS
CURRENT LIABILITIES
Trade and other payables
Employee benefits
Lease liability
TOTAL CURRENT LIABILITIES
9
NON CURRENT LIABILITIES
Lease liability
TOTAL NON CURRENT LIABILITIES
31 December
2020
$
30 June
2020
$
11,781,926
97,726
86,030
11,965,682
4,192,295
118,173
23,304
230,295
4,564,067
55,000
141,962
151,219
1,416,359
1,764,540
55,000
142,120
157,886
1,416,359
1,771,365
13,730,222
6,335,433
420,544
34,662
54,886
510,092
434,517
29,884
91,652
556,053
-
8,002
8,002
510,092
564,056
13,220,130
5,771,377
9,906,195
12,040,106
41,444
(8,767,615)
1,000
12,040,106
(6,269,729)
13,220,130
5,771,377
9
TOTAL LIABILITIES
NET ASSETS
EQUITY
Issued capital
Capital contribution reserve
Share based payments reserve
Accumulated losses
10
11(a)
11(b)
TOTAL EQUITY
The condensed statement of financial position is to be read in conjunction with the notes to the financial statements. Refer
to Note 2 on basis of preparation.
.
8
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
Coda Minerals Limited
Condensed Statement of Changes in Equity
For the period ended 31 December 2020
31 December 2020
Condensed statement of changes in
equity
Opening balance at 1 July 2020
Loss for the period
Issued
capital
Share based
payments reserve
Accumulated
losses
Total
$
Capital
contribution
reserve
$
$
$
$
1,000
12,040,106
-
(6,269,729)
5,771,377
-
-
-
(2,497,886)
(2,497,886)
(2,497,886)
(2,497,886)
Total comprehensive loss for the period
Securities issued
10,872,020
-
-
-
10,872,020
Equity raising costs
Share-based payment expense
(966,825)
-
-
-
(966,825)
-
-
41,444
-
41,444
Closing balance at 31 December 2020
9,906,195
12,040,106
41,444
(8,767,615)
13,220,130
Issued
capital
Share based
payments reserve
Accumulated
losses
Total
$
Capital
contribution
reserve
$
$
$
$
31 December 2019
Condensed statement of changes in
equity
Opening balance at 1 July 2019
1,000
3,789,110
-
(2,331,965)
1,458,145
Loss for the period
-
-
-
(1,720,669)
(1,720,669)
Total comprehensive loss for the period
-
-
-
(1,720,669)
(1,720,669)
Share-based payment expense
Capital contribution
-
-
31,659
-
31,659
-
8,250,996
-
-
8,250,996
1,000
12,040,106
31,659
(4,052,634)
8,020,131
Closing balance at 31 December 2019
The statement of changes in equity is to be read in conjunction with the notes to the financial statements. Refer to Note 2 on basis of preparation.
9
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
Coda Minerals Limited
Condensed Statement of Cashflows
For the period ended 31 December 2020
Note
31 December
2020
$
31 December
2019
$
4
37,500
(1,295,317)
(961,047)
(638,101)
(875,837)
(2,218,864)
(1,513,938)
Cash flows from investing activities
Interest received
Payments for property, plant & equipment
3,678
(52,539)
9,451
(2,136)
Net cash outflow from investing activities
(48,861)
(7,315)
Cash flows from financing activities
Proceeds from the issue of shares
Payment associated with the issue of shares
Proceeds from contributions
Repayment of lease liabilities
10,872,020
(966,825)
(47,838)
8,190,707
(33,433)
Net cash inflow from financing activities
9,957,357
8,157,274
Net increase in cash and cash equivalents
7,589,632
6,650,651
Cash and cash equivalents at beginning of the period
4,192,295
17,542
Cash and cash equivalents at the financial period end
11,781,927
6,668,193
Condensed statement of cash flows
Cash flows from operating activities
Proceeds from government cash flow boost
Payments for exploration and evaluation expenditure
Payments for administration, listing and other expenditure
Net cash outflow from operating activities
The condensed statement of cash flows is to be read in conjunction with the notes to the financial statements. Refer to
Note 2 on basis of preparation.
10
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
Coda Minerals Limited
Notes to the Condensed Financial Statements
For the period ended 31 December 2020
1.
CORPORATE INFORMATION
Reporting entity
Coda Minerals Ltd (the ‘Company’ or ‘Coda’) is a company domiciled in Australia and listed on the Australian
Securities Exchange “ASX” (ASX:COD). The condensed interim financial report of the Company as at and for the six
months ended 31 December 2020 comprise the Company’s results.
The annual financial report of the Company as at and for the year ended 30 June 2020 is available upon request from
the Company’s registered office at 6 Altona Street, West Perth WA or at www.codaminerals.com
2.
SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
Statement of Compliance
The condensed interim financial statements is a general purpose financial report which has been prepared in
accordance with AASB 134 Interim Financial Reporting and the Corporations Act 2001. Compliance with AASB 134
ensures compliance with International Financing Reporting Standard IAS 34 Interim Financial Reporting.
The condensed interim financial statements do not include all the information required for a full annual report and
should be read in conjunction with the annual financial report of the Company as at and for the year ended 30 June
2020.
The condensed interim financial statements were approved by the Board of Directors on 24 February 2021.
Basis of preparation
The condensed financial statements have been prepared on the basis of historical cost basis where cost is based on
the fair value of the consideration given in exchange for assets. All amounts are presented in Australian dollars,
unless otherwise noted.
Use of estimates and judgements
The preparation of the condensed financial statements in conformity with AASB requires management to make
judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts
of assets, liabilities, income and expenses. Actual results may differ from these estimates.
In preparing these condensed interim financial statements, the significant judgements made by management in
applying the Company’s accounting policies and the key sources of estimation uncertainty were the same as those
that applied to the financial report for the period ended 30 June 2020.
Accounting Policies
The accounting policies and methods of computation adopted in the preparation of the half-year financial report are
consistent with those adopted and disclosed in the Company’s 2020 financial report for the period ended 30 June
2020 except where indicated below.
Change from the annual financial statements
Government responses to the impact of COVID-19
During the half-year, the Company became eligible for certain government support in response to the coronavirus
pandemic (Note 4). The Company’s accounting policy for government assistance is explained below.
Government grants are not recognised until there is reasonable assurance that the Company will comply with the
conditions attaching to them and that the grants will be received.
Government grants are recognised in profit or loss on a systematic basis over the periods in which the Group
recognises as expenses the related costs for which the grants are intended to compensate. Government grants
whose primary condition is that the Group should purchase, construct or otherwise acquire non-current assets
(including property, plant and equipment) are recognised as deferred income in the consolidated statement of
financial position and transferred to profit or loss on a systematic and rational basis over the useful lives of the related
assets.
Government grants that are receivable as compensation for expenses or losses already incurred or for the purpose
of giving immediate financial support to the Group with no future related costs are recognised in profit or loss in the
period in which they become receivable.
11
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
Coda Minerals Limited
Notes to the Condensed Financial Statements
For the period ended 31 December 2020
Adoption of new and revised Australian Accounting Standards
The Company has adopted all of the new and revised Standards and Interpretations issued by the Australian
Accounting Standards Board (the AASB) that are relevant to their operations and effective for the current half-year.
New and revised Standards and amendments thereof and Interpretations effective for the current year that are
relevant to the Company are:
AASB 2018-6 Amendments to Australian Accounting Standards – Definition of a Business
AASB 2018-7 Amendments to Australian Accounting Standards – Definition of Material
AASB 2019-1 Amendments to Australian Accounting Standards – References to the Conceptual Framework
AASB 2019-5 Amendments to Australian Accounting Standards – Disclosure of the Effect of New IFRS
Standards Not Yet Issued in Australia
AASB 2020-4 Amendments to Australian Accounting Standards – COVID-19-Related Rent Concessions.
In the current half-year, the Group has applied the below amendments to Australian Accounting Standards [and
Interpretations] issued by the Australian Accounting Standards Board (the Board) that are effective for the Group’s
annual reporting period that began on 1 July 2020.
Amendments to IFRS 3: Definition of a Business
The amendment to IFRS 3 Business Combinations clarifies that to be considered a business, an integrated set of
activities and assets must include, at a minimum, an input and a substantive process that, together, significantly
contribute to the ability to create output. Furthermore, it clarifies that a business can exist without including all of the
inputs and processes needed to create outputs. These amendments had no impact on the financial statements of the
Company, but may impact future periods should the Company enter into any business combinations.
Amendments to IAS 1 and IAS 8 Definition of Material
The amendments provide a new definition of material that states, “information is material if omitting, misstating or
obscuring it could reasonably be expected to influence decisions that the primary users of general purpose financial
statements make on the basis of those financial statements, which provide financial information about a specific
reporting entity.” The amendments clarify that materiality will depend on the nature or magnitude of information, either
individually or in combination with other information, in the context of the financial statements. A misstatement of
information is material if it could reasonably be expected to influence decisions made by the primary users. These
amendments had no impact on the financial statements of, nor is there expected to be any future impact to the
Company.
Conceptual Framework for Financial Reporting issued on 29 March 2018
The Conceptual Framework is not a standard, and none of the concepts contained therein override the concepts or
requirements in any standard. The purpose of the Conceptual Framework is to assist the IASB in developing
standards, to help preparers develop consistent accounting policies where there is no applicable standard in place
and to assist all parties to understand and interpret the standards. This will affect those entities which developed their
accounting policies based on the Conceptual Framework. The revised Conceptual Framework includes some new
concepts, updated definitions and recognition criteria for assets and liabilities and clarifies some important concepts.
These amendments had no impact on the financial statements of the Company.
AASB 2019-5 Amendments to Australian Accounting Standards – Disclosure of the Effect of New IFRS Standards
Not Yet Issued in Australia
This Standard makes amendments to AASB 1054 Additional Australian Disclosures by adding a disclosure
requirement for an entity intending to comply with IFRS Standards to disclose the information specified in paragraphs
30 and 31 of AASB 108 Accounting Policies, Changes in Accounting Estimates and Errors on the potential effect of
an IFRS Standard that has not yet been issued by the AASB. This amendment had no impact on the financial
statements of the Company.
Amendments to IFRS 16 COVID-19 Related Rent Concessions
On 28 May 2020, the IASB issued COVID-19-Related Rent Concessions - amendment to IFRS 16 Leases.
The amendments provide relief to lessees from applying IFRS 16 guidance on lease modification accounting for rent
concessions arising as a direct consequence of the COVID-19 pandemic. As a practical expedient, a lessee may
elect not to assess whether a COVID-19 related rent concession from a lessor is a lease modification. A lessee that
makes this election accounts for any change in lease payments resulting from the COVID-19 related rent concession
the same way it would account for the change under IFRS 16, if the change were not a lease modification. The
amendment applies to annual reporting periods beginning on or after 1 June 2020. Earlier application is permitted.
This amendment had no impact on the financial statements of the Company.
The Company has not early adopted any other standard, interpretation or amendment that has been issued but is
not yet effective.
12
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
Coda Minerals Limited
Notes to the Condensed Financial Statements
For the period ended 31 December 2020
3.
SEGMENT INFORMATION
Management has determined the operating segments based on the reports reviewed by the Board of Directors that
are used to make strategic decisions.
For management purposes, the Company has identified one reportable segment being exploration activities in the
Australasia geographical region: the Elizabeth Creek Copper Cobalt project. The Australasia segment includes the
activities associated with the determination and assessment of the existence of commercial reserves, from the
Company’s mineral assets in this geographical region.
The following is an analysis of the Company’s revenue and results by reportable operating segment for the half-years
under review:
Revenue
Half year ended
31 December
31 December
2020
2019
$
$
Continuing operations
Elizabeth Creek
Total segment
Other income
Administration costs
Other corporate costs
Finance income
Finance costs
Loss before tax
Income tax expense
Consolidated segment loss for the
period
Segment loss
Half year ended
31 December
31 December
2020
2019
$
$
-
-
(1,421,506)
(1,421,506)
(559,948)
(559,948)
37,500
3,678
-
9,451
-
37,500
(782,905)
(330,611)
3,678
(4,042)
(2,497,886)
(2,497,886)
(749,952)
(414,121)
9,451
(1,136)
(1,715,706)
(1,715,706)
The following is an analysis of the Group’s assets and liabilities by reportable operating segment:
Segment assets
Year ended
31 December
30 June
2020
2020
$
$
Segment liabilities
Year ended
31 December
30 June
2020
2020
$
$
Segment assets and liabilities
Elizabeth Creek
Total segment
1,622,578
1,622,578
1,629,245
1,629,245
353,532
353,532
68,984
68,984
Unallocated assets and liabilities
Consolidated assets and liabilities
12,107,644
13,730,222
4,726,188
6,335,433
156,559
510,092
495,072
564,056
13
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
Coda Minerals Limited
Notes to the Condensed Financial Statements
For the period ended 31 December 2020
4.
31 December
2020
$
31 December
2019
$
Finance income
Bank interest
3,678
9,451
Other income
Government cash flow boost(i)
37,500
-
INCOME
Note:
(i) The Company benefited from the government’s temporary Cash Flow Boost support package designed to assist
businesses manage cashflow challenges and help retain employees during the economic downturn associated
with COVID-19 19. Eligible businesses who employed staff received cash flow boosts delivered as credits via
the activity statement system (not as direct payments to the business). The cash flow boost payments were
made in two stages. The initial cash flow boost was based on the amount of the Company’s PAYG withholding
for the period April to June 2020. Eligible businesses that withheld tax on their employees’ salary and wages
received a credit equal to 100% of the amount withheld to a maximum payment of $50,000. The second
payments were made for the July to September 2020 quarter. Eligible businesses received an additional
payment equal to the total that they had been paid in the first round of payments to a maximum of $50,000,
regardless of the amount of PAYG tax actually paid to the Australian Taxation Office (ATO). Refer Note 2
Accounting Policies.
31 December
2020
$
5.
31 December
2019
$
EXPENSES
(a) Administration expenses
Audit fees
(13,900)
(10,000)
Corporate and consultant costs
(130,550)
(149,786)
Director Fees and employee benefits expense
(542,757)
(410,452)
Other administration costs
(95,698)
(140,600)
Total administration expenses
(782,905)
(710,839)
(1,421,506)
(559,948)
External advisors, consultants, brokers and legal expenses
(222,418)
(396,855)
Investor relations
(48,830)
-
Total corporate finance expenses
(271,248)
(396,855)
(59,363)
(55,663)
(4,042)
(5,680)
Other finance charges
-
(1,136)
Total finance expenses
(4,042)
(6,816)
(2,539,064)
(1,730,120)
(b) Exploration and evaluation expenses
Exploration and evaluation expenses
(c) Corporate finance expenses
(d) Other expenses
Amortisation & depreciation
(e) Finance expenses
Lease interest expense (refer Note 9)
Total expenses
14
CODA MINERALS LIMITED ACN 625 763 957
INTERIM FINANCIAL STATEMENTS
Coda Minerals Limited
Notes to the Condensed Financial Statements
For the period ended 31 December 2020
6.
PROPERTY, PLANT & EQUIPMENT
31 December 2020
Right of use asset
(leased offices)
$
Equipment,
fixtures and
fittings
$
Project
Equipment
$
Total
$
Cost
At 1 July 2020
Additions
At 31 December 2020
175,194
175,194
68,195
546
68,741
51,994
51,994
243,389
52,540
295,929
Accumulated depreciation
At 1 July 2020
Depreciation
At 31 December 2020
(82,195)
(43,799)
(125,994)
(19,074)
(5,900)
(24,974)
(2,999)
(2,999)
(101,269)
(52,698)
(153,967)
92,999
49,200
49,121
43,767
48,995
142,120
141,962
Right of use asset
(leased offices)
$
Equipment,
fixtures and
fittings
$
Project
Equipment
$
Total
$
Cost
At 1 July 2019
Additions
At 31 December 2019
175,194
175,194
62,425
62,645
-
237,619
237,619
Accumulated depreciation
At 1 July 2019
Depreciation
At 31 December 20
Share your feedback
Discover