Annual Report
Released
Released
Announcement PDF
ANNUAL REPORT
2025
1
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
TABLE OF CONTENTS
02
LETTER FROM THE CHAIR
04
CEO’S REPORT
06
OPERATIONAL REVIEW
16
DIRECTORS’ REPORT
36
AUDITOR’S INDEPENDENCE DECLARATION
38
INDEPENDENT AUDITOR’S REPORT
44
DIRECTORS’ DECLARATION
46
CONSOLIDATED STATEMENT OF PROFIT OR LOSS
AND OTHER COMPREHENSIVE INCOME
47
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
48
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
49
CONSOLIDATED STATEMENT OF CASH FLOWS
50
CONSOLIDATED NOTES TO THE FINANCIAL STATEMENT
84
CONSOLIDATED ENTITY DISCLOSURE STATEMENT
85
ASX ADDITIONAL INFORMATION
TABLE
OF
CONTENTS
1
93
CORPORATE DIRECTORY
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
LETTER FROM
THE CHAIR
22
MINERALS
LIMITED
ANDCONTROLLED
ITS CONTROLLED
ENTITIES
CODACODA
MINERALS
LIMITED
AND ITS
ENTITIES
ACN ACN
6 25 76625
3 975673 9 5 7
ANNUAL
REPORT
AND FINANCIAL
STATEMENTS
ANNUAL
REPORT
AND FINANCIAL
STATEMENTS
20252025
LE T TER FROM THE CHAIR
Dear Shareholders,
FY25 has been a year of steady and important progress for Coda Minerals as we continue to advance the Elizabeth Creek
Copper-Silver Project in South Australia.
In December 20241, we published an updated study which delivered a material improvement in the project’s economics.
This reflected the significant work undertaken to refine our understanding of the orebody and optimise our approach, and
it gave us a stronger foundation from which to move toward the next stage of development.
In March 20252, we announced the results of drilling at Elizabeth Creek which reinforced the quality of the Resource base.
Our team also made major advances in approvals, positioning the project well as we transition into the Pre-Feasibility
Study (PFS) phase. The submission of the Draft Scoping Report to the South Australian Department of Energy and Mining
post financial year3 end continued our progress toward project development.
While outside the formal reporting period, it is important to acknowledge the metallurgical breakthrough achieved in
mid-2025 4 which built on a work programme that ran through the first half of 2025. The adoption of a copper-silver based
flowsheet has been transformational for Elizabeth Creek. The new approach materially improves recoveries of copper
and silver significantly de-risks the project, and delivers economics that are compelling. The updated study, published in
August 2025 5, makes clear the scale of the opportunity that lies ahead.
This year has demonstrated the value of disciplined, technically rigorous work. Each step - study refinement, drilling,
approvals, and metallurgical test work - has brought us closer to unlocking the potential of Elizabeth Creek as a
significant copper project. The upcoming PFS will be a critical stage in demonstrating the full commercial potential of
the project.
On behalf of the Board, I would like to thank our management team, led by Chris Stevens, for their dedication and
professionalism in advancing the project. I also thank our shareholders for their continued support.
We remain committed to delivering value as we move into the next stage of Coda’s journey.
Yours sincerely,
Keith Jones
Chair
Coda Minerals Ltd
1
2
3
4
5
2024.12.03
2025.03.19
2025.07.11
2025.06.26
2025.08.28
3
New Resources, Higher Recoveries Boost Elizabeth Creek Value
Drilling Identifies Potential Emmie Bluff Extension
Key Approvals Milestone Achieved at Elizabeth Creek
Material Uplift in Copper and Silver Recoveries
New Flowsheet Delivers Significant Cu-Ag Economic Uplift
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
CEO’S
REPORT
4
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
CEO ’S REPORT
I am pleased to present my address to shareholders as we look ahead to the 2026 Financial Year, which promises to be a
defining period for Coda.
The year has begun with what we consider the most important development in the history of the Elizabeth Creek Project:
the successful shift to a copper-silver flowsheet6. This change places the project on a far stronger foundation, anchored
by two globally traded commodities with deep, liquid markets.
Throughout FY25 our focus was firmly on unlocking value at Elizabeth Creek. Through determined and technically
rigorous work, we have achieved a step-change in the project, clearly demonstrating the strength of this strategy.
In September 2025 7, we launched a fully underwritten entitlement offer that received overwhelming support from
both institutional investors and major shareholders. This is a significant capital raising, undertaken only after careful
consideration, and it now provides the funding required to accelerate our path to pre-feasibility. Critical technical
programs and approvals work are already underway.
We are also beginning to see encouraging signs of renewed strength in the copper market, alongside heightened M&A
activity across the sector. With increasingly fewer copper development peers remaining on the ASX, these broader
industry dynamics coincide with a year in which we have materially improved the technical and economic foundations of
Elizabeth Creek. Together, these factors place us in a strong position to move decisively towards commercialisation.
Looking ahead, FY26 will be marked by an intensive program of technical and economic work that will generate a steady
flow of results. Importantly, the groundwork completed in FY25 has given us the confidence to now transition into a
period of rapid advancement. The hard yards have been done; the project has been materially de-risked and enhanced.
Our task now is to follow a proven path—progressing Elizabeth Creek methodically and efficiently through the prefeasibility stage and beyond.
Chris Stevens
CEO
Coda Minerals Ltd
6
7
2025.08.28
2025.09.09
5
New Flowsheet Delivers Significant Cu-Ag Economic Uplift
Fully Underwritten A$8.33M Entitlement Offer
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
OPERATIONAL
REVIEW
6
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
OPER ATIONAL RE VIE W
CODA MINERALS LIMITED (ASX: COD) is focused on the discovery and development of minerals that are leveraged to
the global energy transformation through electrification and the adoption of renewable energy technologies.
Coda’s flagship asset is the 100%-owned Elizabeth Creek Copper-Silver Project, located in the world-class Olympic
Copper Province in the Eastern Gawler Craton, South Australia’s most productive copper belt. Elizabeth Creek is centred
100km south of BHP’s Olympic Dam copper-gold-uranium mine, 15km from its new Oak Dam West Project and 50km west
of OZ Minerals’ Carrapateena copper-gold project.
7
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
OPER ATIONAL RE VIE W
ELIZABETH CREEK PROJECT
The Elizabeth Creek project consists of 4 tenements, EL6265, EL6518, EL6141 and the recently acquired EL6945, granted
in May 2024, covering a total area of 774sq km. The tenure hosts three distinct mineralisation styles, the ZambianStyle Copper Cobalt Mineralisation, the Iron Oxide Copper Gold (IOCG) mineralisation and the Cattle Grid copper breccia
mineralisation.
EMMIE BLUFF
FLAGSHIP
Zambian Style
Underground Deposit
~ 400m depth
EMMIE DEEPS
Iron Oxide Copper Gold (IOCG)
Underground Deposit
~ 800m depth
WINDABOUT
Zambian Style
Open Pit Deposit
~ 50 - 70m depth
TOTAL AREA
774km2
MG14
Zambian Style
Open Pit Deposit
~ 20m depth
LEGEND
Mineral resource outline
Infrastructure footprint
Camp
OAKDEN
Cu-Co-Ag Prospect
~ 30m depth
CATTLE GRID
SOUTH
Cu Breccia
Open Pit Deposit
~ 30m depth
Process Plant
TSF
EB Decline
Pit Outlines
Haul road
Base Case route
Alternative route
Carrapateena road
The Elizabeth Creek project hosts over 1 million tonnes of contained copper equivalent, spread across four JORC 2012
Mineral Resources, all of which fall broadly into the same geological category of “sediment-hosted” copper deposits.
Additional large-scale copper mineralisation is known from the Emmie Deeps IOCG deposit, but the company has not yet
attempted to estimate a JORC compliant Mineral Resource for that deposit.
8
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
OPER ATIONAL RE VIE W
JORC 2012 MINERAL RESOURCES
RESOURCE
CONFIDENCE
CUTTOFF
Mt
Cu
(%)
Co
(%ppm)
Ag
(g/t)
CuEq
(%)
CuEq
Contained
Metal
(kt)
Emmie Bluff
93% Indicated,
7% Inferred
1.0%
CuEq
40.2
1.3%
569
17
1.87%
751
MG14
Indicated
0.5%
CuEq
1.8
1.2%
334
14
1.67%
31
Windabout
Indicated
0.5%
CuEq
17.7
0.8%
492
8
141%
249
Cattle Grid South
Inferred
0.2%
Cu
5.8
0.6%
121
4
N/A
36*
1.60%
1,067
TOTAL
*
65.5
Contained Cu tonnes only
Scoping Study
Coda released it’s initial Scoping Study into the Elizabeth Creek Project in March of 20231. This initial Scoping Study
demonstrated an economically robust project with a 14 year mine life, capable of producing 25,000 tonnes of copper and
1,000 tonnes of cobalt at steady state production levels with an average AISC USD $2.19/lb of Cu (after by-product credits)
and an approximate pre-tax NPV8 of $570M.
During the 2023-2024 financial year, the Company released two updates to this study 2,3 , which further optimised the
project and improved project economics.
Two important updates have occurred in the subsequent reporting period. The first was one further update during the
reporting year4, which refined the flotation processing flowsheet and introduced the Cattle Grid South deposit, previously
excluded from earlier studies, and first reported to the market in July of 20245. This resulted in an estimated pre-tax
NPV 7 of $1.18 billion ($802M post-Tax), with an average steady state production rate of 26,700tpa copper, 1,300tpa cobalt
and 1.1MOz pa silver. AISC was estimated at USD $1.80/lb Cu after by-product credits, and mine life was estimated at 15.5
years.
The second major change occurred in June of 2025, with the announcement of significant improvements in net copper
recovery using whole-ore leach methods6. Chloride leaching, which ultimately proved to be the more economically
attractive of the tested options, achieved copper and silver recoveries of 95.9% and 97.3% respectively from material
from the Emmie Bluff deposit, This preliminary testwork was undertaken at a relatively coarse grind and required only
8 hours of residence time.
Subsequent to the end of the reporting period, and following further refinement of the leaching techniques, Coda
released updated CAPEX and OPEX estimates, as well as a preliminary update to project economics7. Under this new
metallurgical paradigm, Elizabeth Creek would see an increase in both economic performance (pre and post-tax NPV 7 of
$1.29B and $855M respectively) and to overall copper and silver production (steady state average production of 31.4ktpa
Cu and 1.4MOzpa Ag). The key economic assumptions underpinning this update were unchanged from the December
study. A summary comparing both studies is included below as Table 1 and a summary of the financial changes is detailed
in Table 2.
1
2
3
4
5
6
7
2023.03.23
2024.01.30
2024.03.14
2024.12.03
2024.07.03
2025.06.26
2025.08.28
9
Elizabeth Creek Copper-Cobalt Project Scoping Study
Scoping Study Update Delivers Materially Improved Economics
Further Key Improvement in Underground Project Economics
New Resources, Higher Recoveries Boost Elizabeth Creek Value
Initial Copper Resource for Cattle Grid South
Material Uplift in Copper and Silver Recoveries
New Flowsheet Delivers Significant Cu-Ag Economic Uplift
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
OPER ATIONAL RE VIE W
STUDY SECTION
DECEMBER 2024 SCOPING STUDY UPDATE
(PROCESSING BY FLOTATION/ALBION)
UPDATED SCOPING STUDY SUBSEQUENT
TO YEAR END (PROCESSING BY WHOLE-ORE
LEACH)
Mineral Resources
MG14: 1.83Mt @ 1.24%Cu, 0.03%C
(100% Indicated)
No Change
Windabout: 17.67Mt @ 0.77%Cu, 0.05%Co
(100% Indicated)
Emmie Bluff 8: 40.2Mt @ 1.27%Cu, 0.06%Co
(93% Indicated, 7% inferred)
Cattle Grid South 9: 5.8Mt @ 0.6% Cu,
0.012%Co (100% Inferred)
Processing Capacity
3Mtpa Throughput
No Change
Products
MG14, Cattle Grid South: Copper Concentrate
All Deposits: Copper Cathode, Silver Dore
& Zinc Carbonate
Windabout & Emmie Bluff: Copper Cathode,
Cobalt Sulphate, Zinc Carbonate & Silver Dore
Mineral Processing
Stage 1: Flotation
All ore will undergo primary crushing followed by grinding in a SAG mill with a pebble
crushing circuit. Crushed ore from MG14 and
Windabout will pass through an additional
deslime circuit before flowing through a
conventional rough-cleaner-scavenger
flotation circuit to produce a copper cobalt
concentrate.
Stage 2: Hydromet
The concentrates from Windabout and Emmie Bluff will then proceed to a downstream
hydrometallurgical processing plant based
on an Albion Process™ leach circuit. The
overflow liquor, containing copper, cobalt,
and zinc, will be directed to an SXEW plant,
followed by a Cobalt SX and Zinc precipitation circuit. The CCD discharge slurry,
containing silver, will be processed through
a lime boil and cyanidation circuit.
All Deposits: The whole ore leach flowsheet
consists of a single stage oxidative circuit,
wherein sample is ground to p80 75µm before
being pumped into a series of tanks for leaching. A 4-hour chloride leach under air-sparged,
oxidative conditions at 90 degrees C and an ore
solids ratio of 6%. The mixture is then passed
through a series of thickeners, with the resultant pregnant liquor solution being pumped away
for hydrometallurgical processing, while the
residue is sent to tailings.
Hydrometallurgical processing will consist of
an SX/EW plant producing copper cathode, followed by a Merrill Crowe circuit producing silver
dore and a zinc carbonate precipitation circuit.
Copper Recovery
MG14: 57.93%
Windabout: 66.5%
Emmie Bluff: 77.2%
Cattle Grid South: 90%
94.8%
Production
Copper: 384 kt
Cobalt: 18.9 kt
Silver: 16.1 Moz
Zinc: 48.4 kt
Copper: 454 kt
Silver: 20.3 Moz
Zinc: 50.6 kt
2024.01.30 Scoping Study Update Delivers Materially Improved Economics - For full details, see Appendix 1 – Section Mineral Resource
Update – Detailed Information
8
2024.07.03 Initial Copper Resource for Cattle Grid South - For full details, see Appendix 2 – Detailed Technical Information and
JORC Table 1
9
10
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
OPER ATIONAL RE VIE W
Table 2: Economic Comparison of updated Scoping Study (December 2024) and most recent Scoping Study update
accounting for whole-ore leach (subsequent to end of reporting period).
FINANCIALS (PRE
TAX)_12
OPERATING
CAPITAL
PRODUCTION
AREA
MEASURE
UNIT
UPDATED
SCOPING STUDY
WHOLE-ORE
LEACH STUDY
DEC-24
AUG-25
Mine Life
Years
15.5
15.5
Processing Throughput
Mtpa
3
3
Feed from Indicated Resource
%
87%
87%
Feed from Inferred Resource
%
13%
13%
Copper Produced – Total
Kt
384
454
Silver Produced – Total
Moz
16.1
20.3
Cobalt Produced – Total
Kt
18.9
-
Copper – Steady State Average10
Tpa
26,736
31,400
Silver – Steady State Average
Mozpa
1.13
1.4
Cobalt – Steady State Average
Tpa
1,258
-
Pre-Production Capital
A$M
331
472
Post-Production Capital
A$M
358
143
Total Capital
A$M
689
615
Total Financing Requirement
A$M
504
478
All In Sustaining Cost11
USD/lb Cu
1.80
2.15
Revenue
A$M
7,574
7,264
Net Cash Flow (Pre-Tax)
A$M
2,244
2,397
Net Present Value (NPV7)
A$M
1,181
1,289
Internal Rate of Return (IRR)
%
35%
39%
Total Capital Payback
Years
4.0
3.25
13
Steady State Average” is calculated from year 5 to year 16
All-In Sustaining Cost (AISC) includes all mining, processing, tailings management, transport including freight, sustaining capital, royalties & G&A costs
12
Including royalties
13
Capital payback is calculated from first production
10
11
11
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
OPER ATIONAL RE VIE W
NEXT STEPS – ELIZABETH CREEK (SHORT-TERM CATALYSTS)
Coda intends to commence drilling for a detailed PFS into Elizabeth Creek in October of 2025. This drill programme will
provide sample for metallurgical and geotechnical testwork which will serve as the baseline for further and more detailed
project design work.
Potential catalysts during the next year include:
Variability Testwork: Verification of applicability and consistency of copper and silver recovery of whole-ore leach across
all deposits will provide final confirmation that the new flowsheet will be applicable across all major deposits.
Reoptimised Mine Schedules: Current economic models around whole-ore leach assume the same mining schedule and
cut-off grades as were originally developed for flotation. Reoptimisation of this mining schedule for the new flowsheet
may result in increased average profit per tonne.
Environmental Approvals: Subsequent to the end of the reporting period, Coda submitted its Scoping Report to the
South Australian Department of Energy and Mining (SA DEM) 8. This is one of the final steps in the development of the
project specific environmental studies and associated work plans for Elizabeth Creek, which will provides a clear and
transparent pathway towards the grant of a Mining Lease, which Coda will pursue over the coming year.
Reintroduction of Cobalt: Test work to confirm the leachability of cobalt from Elizabeth Creek mineralisation is ongoing.
Coda believes that the future re-integration of cobalt into the flowsheet represents an attractive upside opportunity but
is not integral to the progression of the copper-silver based flowsheet.
EXPLORATION – SED-HOSTED
Exploration during the year focused on drilling south and east of the Emmie Bluff deposit, commencing in February 20259.
The four-hole program tested geophysical anomalies identified in seismic and magnetotelluric (MT) surveys, interpreted
as possible Tapley Hill Formation black shale, and was completed in March 2025.
One hole (DD25EB0038, “Hole 38”) intersected a narrow band of mineralised Tapley Hill Formation mudstone conglomerate
— the first such mineralisation encountered outside the Emmie Bluff Mineral Resource. A second hole (Hole 39)
intersected a thicker but unmineralised, partially oxidised shale sequence, while two holes (37 and 40) did not intersect
the formation.
The program confirmed that Tapley Hill Formation shale extends beyond the existing Mineral Resource and that parts of
this unit are mineralised, with mineralisation not closed off by current drilling. Coda intends to further investigate out-fill
opportunities during feasibility work.
8
9
2025.07.11
2025.02.11
12
Key Approvals Milestone Achieved at Elizabeth Creek
Drilling Commences at Emmie Bluff
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
OPER ATIONAL RE VIE W
13
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
TIMELINE
CORPORATE
2024
SUCCESSFUL COMPLETION OF $5.1M
CAPITAL RAISE TO SUPPORT SCOPING
STUDY UPDATE AND EXPLORATION AT
ELIZABETH CREEK
Coda Minerals successfully raised $5.1m at
$0.07 per share through an oversubscribed
entitlement offer and follow-on placement,
providing a strong cash position to progress
exploration and a Scoping Study update
at its 100% owned Elizabeth Creek Copper
Project.
OCTOBER 2024
MAIDEN MINERAL RESOURCE
AT CATTLE GRID SOUTH
An Inferred Mineral Resource Estimate (MRE)
was completed for Cattle Grid South of
5.8 Mt at 0.62% Cu for approximately 36 kt
of contained copper and 0.5 kt of contained
cobalt with accessory silver and zinc.
JULY 2024
PROJECT
ELIZABETH CREEK
APPROVALS PROCESS
COMMENCES
SCOPING STUDY UPDATE NEW RESOURCES, HIGHER RECOVERIES
SIGNIFICANTLY BOOST ELIZABETH
CREEK’S UNDERLYING VALUE
The updated scoping study incorporates
improvements to the metallurgical flowsheet,
including oxide collectors and a second millfloat stage, which have boosted copper and
silver recoveries. The inclusion of the Cattle
Grid South deposit extends mine life and adds
more than 20,000 tonnes of copper.
DECEMBER 2024
Coda submitted the Preliminary
Impact Assessment (PIA) for its
flagship Elizabeth Creek CopperCobalt Project in South Australia,
formally commencing the
environmental scoping process.
AUGUST 2024
14
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
TIMELINE
2025
APPOINTMENT OF CHIEF
FINANCIAL OFFICER
Coda welcomed Mr Chris Burton, a
chartered accountant and finance
professional with over 27 years’
experience, as CFO on a part-time
consulting basis.
MARCH 2025
DRILLING COMMENCES
AT EMMIE EAST
MATERIAL UPLIFT IN COPPER
AND SILVER RECOVERIES
Drilling programme covered up to
2,000m across 4 holes, targeting
extension of the Emmie Bluff
mineralisation to the east and
south-east of the main Emmie
Bluff resource.
Test work at Emmie Bluff
delivered copper recoveries of
up to 96% using whole-ore leach,
marking a material uplift from
previous flotation results and
highlighting potential for lower
costs and stronger economics at
Elizabeth Creek.
FEBRUARY 2025
DRILLING IDENTIFIES
POTENTIAL EMMIE BLUFF
EXTENSION
4-hole drill programme completed at Emmie
East, identifying mineralised Tapley Formation
host rock outside of the existing Resource for
the first time and offering scope for expansion.
MARCH 2025
An updated Scoping Study
incorporating the new flowsheet
was announced subsequent
to the end of the financial year
in August 2025. This resulted
in a transformational update
to the project with a revised
copper-silver based flow sheet
and materially improved project
economics, reduced technical
and commodity risk, and reduced
CAPEX and OPEX.
2025.08.28 - New Flowsheet Delivers
Significant Cu-Ag Economic Uplift
JUNE 2025
15
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
DIRECTORS’
REPORT
16
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
DIRECTORS ’ REPORT
FOR THE YE A R ENDED 30 JUNE 20 25
The directors of Coda Minerals Ltd (‘the Company’ or ‘Coda’) present their report together with the financial statements of
the Company and its Subsidiaries (‘the Group’) for the financial year ended 30 June 2025 and the Auditor’s Report thereon.
In order to comply with the provisions of the Corporations Act 2001, the Directors’ report is as follows:
DIRECTORS
The directors of the Company at any time during or since the end of the financial year were:
NAME & QUALIFICATIONS
EXPERIENCE AND SPECIAL RESPONSIBILITIES
Mr Keith F Jones
BBus, FCA, FAICD
Non-Executive Chairman
Mr Jones is an experienced public company Chairman with a background of over
41 years professional experience providing advisory and consulting services to
the mining and resources sector.
Appointed: 26 April 2018
Mr Jones is the former Chairman of Deloitte Australia and served for 10 years on
the Board of Deloitte Australia. He is the former Chairman of Gindalbie Metals
Limited and Cannings Purple and former Non-Executive Director of ASX listed
Company Ora Banda Minerals Limited
Other current directorships:
Ecograf Limited
(Appointed May 2023)
Former directorships in last 3 years:
Ora Banda Mining Limited
(April 2019 to September 2022)
Mr Jones has significant executive leadership experience serving for 15 years
as the Managing Partner of Deloitte in Western Australia and as Leader of the
National Chinese Services Group and National Energy and Resources Group.
Mr Andrew Marshall
I Eng (UK), MAICD
Non-Executive Director
Mr Andrew (Robin) Marshall has previously been involved in managing the
successful delivery of some of the world’s largest resource projects, including
major projects for BHP Billiton, Vale Inco, Western Mining and North Limited.
Appointed: 19 July 2019
Most recently Mr Marshall provided oversight for the delivery of the Goldfields,
Gold Road Gruyere Gold Project as a member of the Technical Steering
Committee.
At Vale Inco, he held the position of Project Director with responsibility for
delivery of the multi-billion dollar Goro Nickel Project in New Caledonia through
to its commissioning in early 2009. At BHP Billiton Iron Ore, Mr Marshall held the
position of Vice President – Asset Development Projects with responsibility for
the development of a number of projects in the first wave of expansion in the iron
ore business sector.
In additional to these roles, Mr Marshall also previously held key positions of
Project Manager for the West Angelas Iron Ore Project with North Limited,
Project Director with Iron Ore Company of Canada, Manager Projects for
Forrestania Gold/LionOre Australia, Manager Engineering & Project Services
for Western Mining Corporation and Project Manager for Nedpac (Signet
Engineering). Mr Marshall provides consulting services to major companies and
has extensive experience with overseas projects and operations.
Mr Paul Hallam
BE(Hons)Mining, FAICD, FAusIMM
Non-Executive Director
Appointed: 21 August 2019
Other current directorships:
Greatland Gold Plc.
(Appointed September 2021)
Mr Hallam has more than 45 years Australian and international resource industry
experience. His operating and corporate experience is across a range of
commodities (iron ore, bauxite, alumina, aluminium, gold, silver, copper, zinc
and lead) and includes both surface and underground mining. Mr Hallam retired
in 2011 to pursue a career as a professional non-executive director. He has held
Australian and international non-executive director roles since 1997.
His former executive roles include Director – Operations with Fortescue Metals
Group, Executive General Manager – Developments & Projects with Newcrest
Mining Limited, Director – Victorian Operations with Alcoa and Executive General
Manager – Base and Precious Metals with North Ltd.
Mr Hallam is a qualified mining engineer and holds a BE (Hons) Mining from
Melbourne University and a Certificate of Mineral Economics from Curtin
University. He is a Fellow of the Australian Institute of Company Directors and the
Australasian Institute of Mining & Metallurgy.
17
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 6 25 7 6 3 9 5 7
ANNUAL REPORT AND FINANCIAL STATEMENTS 2025
DIRECTORS ’ REPORT
FOR THE YE AR ENDED 30 JUNE 2025
NAME & QUALIFICATIONS
EXPERIENCE AND SPECIAL RESPONSIBILITIES
Mr Chris Stevens
BA (Hons), MA (Oxon), MSc, GAICD,
FAusIMM
Chief Executive Officer
Mr Stevens is an experienced resources executive and mineral economist who
joined Coda after holding the role of CEO at Gindalbie Metals. Prior to joining
Gindalbie in 2016, Mr Stevens was the Western Australian Mining Consulting
Lead at PricewaterhouseCoopers (PwC), where he managed professional
teams to devise strategy, evaluate investment options and assist in delivery of
major transactions for various ASX listed mining and energy companies.
Appointed: 26 April 2018
Former directorships in last 3 years:
Enterprise Metals Limited
(October 2021 to January 2023)
Prior to joining PwC, Mr Stevens held senior roles in the mining industry
including General Manager- Commercial at Asia Iron and Commercial Manager
at Gindalbie Metals.
In addition to his executive resources experience, Mr Stevens has over 18 years’
experience working with Chinese companies in commercial consulting and
private equity. Mr Stevens is a Fellow of the AusIMM, holds an Honours degree
from the University of Oxford, a Master of Science in Mineral Economics from
Curtin University, and is a fluent Chinese speaker.
COMPANY SECRETARY
The Company’s company secretary is Ms Susan Park BCom, ACA, F Fin, FGIA, FCIS, GAICD. Ms Park was appointed to the
position of company secretary on 25 November 2020.
PRINCIPAL ACTIVITIES
The principal activities of the Company during the period were primarily focused on the progression of exploration and
evaluation activities associated with the Elizabeth Creek Copper Cobalt Project (“Elizabeth Creek”) in South Australia. The
Company also advanced exploration work at the Cameron River Copper Gold Project (“Cameron River”) as well as engaging
in the evaluation of projects and potential joint ventures with other mining companies to explore for minerals.
REVIEW OF OPERATIONS
Coda is focused on the discovery and development of minerals that are leveraged to the global energy transformation
through electrification and the adoption of renewable energy technologies. Coda’s flagship asset is the 100%-owned
Elizabeth Creek Copper-Cobalt Project, located in the world-class Olympic Copper Province in the Eastern Gawler Craton,
South Australia’s most productive copper belt. Elizabeth Creek is centred 100km south of BHP’s Olympic Dam coppergold-uranium mine, 15km from its new Oak Dam West Project and 50km west of its Carrapateena copper-gold project.
In December 2021, Coda announced a maiden Indicated and Inferred Mineral Resource Estimate for the Emmie Bluff
copper-cobalt deposit at Elizabeth Creek.
Coda consolidated 100% ownership of the Elizabeth Creek Copper Project after completing the acquisition of its former
joint venture partner, Torrens Mining, in the first half of 2022.
In March 2023, the Company released the initial Scoping Study for the Elizabeth Creek Copper Project1 and has since
delivered f
Share your feedback