New Resources, Higher Recoveries Boost Elizabeth Creek Value
Released
Released
Announcement PDF
SCOPING STUDY
2024X
ASX RELEASE
ELIZABETH CREEK
3 December 2024
ASX Code: COD
New Resources, Higher Recoveries Significantly Boost Elizabeth
Creek’s Underlying Value
Major update to Elizabeth Creek Copper-Cobalt-Silver Project delivers significant uplift in project
economics from improved copper and silver recoveries and inclusion of a new open pit deposit.
Highlights
Scoping Study – Key Outcomes:
•
Total pre-tax revenue of approximately $7.57 billion over the life of mine;
•
Estimated pre-tax NPV(7) of approximately $1.18 billion and 35% IRR;
•
An increase of 57% to estimated post-tax NPV(7) from approximately $509 million previously to
approximately $802 million;
•
Average steady state annual production of ~26,700tpa copper and ~1,300tpa cobalt and ~1.1MOz pa
silver;
•
Mineralisation to be sourced from three open pits, and one long-life underground mine (~400m depth);
•
Lifetime average mined diluted grade of 1.70% CuEq- 1.11% Cu, 546ppm Co and 15g/t Ag;
•
The Elizabeth Creek Project will be undertaken in two phases:
– Phase 1, consisting of ~1-year of copper-cobalt concentrate production to drive early cash-flow; followed by;
– Phase 2, involving the construction of a hydrometallurgical plant using the Albion ProcessTM to produce ~13
years of the higher value saleable end-products copper cathode, battery-grade cobalt sulphate, zinc
carbonate and silver doré.
•
Up-front CAPEX (pre-production) has increased by 8% to $331 million including contingency.
•
Coda has a strong cash balance of over $6 million and remains well funded to advance the Elizabeth Creek
Project towards development and while undertaking targeted exploration.
•
Coda’s exploration team has just returned from site at Elizabeth Creek finalising drill preparations. Drilling
is scheduled to commence in mid-Q1 2025, initially focused on the major new target at Emmie East which
has the potential to materially expand the Project.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK SCOPING STUDY
Coda Minerals Ltd (“Coda” or “the Company”) (ASX: COD) is pleased to announce the results of its next phase Scoping
Study (“Study”) completed on the sedimentary copper-cobalt-silver mineralisation at its 100%-owned Elizabeth Creek
Project in South Australia. The Study delivers a material improvement in forecast project economics and financial returns
based on a like-for-like comparison with previous updates, reflecting the success of the Company’s optimisation program
over the past 12 months as well as an improved understanding of the mineralisation at Elizabeth Creek.
The Elizabeth Creek Project comprises three granted Exploration Licences covering an area of 774km2 in the Olympic Dam
Copper Province, one of Australia’s most active mining regions and its most productive copper belt.
The Project lies in the heart of an active mining region, being located 100km south of the Olympic Dam copper-golduranium mine, 50km west of the Carrapateena copper-gold mine and 15km south of the Oak Dam copper-gold project, all
operated by BHP. The Project has access to high-quality infrastructure being located 35km south-east of the town of
Woomera and 135km north-west of Port Augusta in South Australia.
Coda’s primary focus at Elizabeth Creek is on the development of the sedimentary copper-cobalt-silver mineralisation
(which forms the subject of this Scoping Study), which provides the foundation for a sustainable, globally competitive,
long-term mining and processing operation with the potential to come into production against the backdrop of extremely
favourable market dynamics for the copper industry.
The study covers four deposits:
• MG14: Open pit prospect, commencing from a depth of ~20m.
• Windabout: Open pit prospect, commencing from a depth of ~50m
• Cattle Grid South: Open pit prospect, commencing from a depth of ~35m
• Emmie Bluff: Coda’s flagship underground prospect, commencing from a depth of ~400m
For the avoidance of doubt, the contents, technical information and forecast financial information in this Scoping Study
focus solely on the shallower copper-cobalt-silver mineralisation and do not include any reference to or inclusion of the
IOCG mineralisation discovered in June 2021.
The Project is well supported in terms of infrastructure and boasts excellent ESG credentials, being located in a stable,
Tier-1 mining jurisdiction with access to the nation’s most renewable power grid.
This revised Study is a full-form revision of the original Study released to market in March 2023 and subsequently updated
to include revisions to the underground mining methods at Emmie Bluff in January 2024 and March 2024. 1
This Study builds on previous work to integrate improvements such as mechanical cutting and pillar recovery at Emmie
Bluff, and now includes numerous improvements related to the metallurgical flowsheet. By integrating oxide collectors
and a second mill-float stage, recoveries of copper and silver have been materially improved. In addition, the Cattle Grid
South open-pit deposit, which the Company defined in 2024, has been integrated into the overall mine plan to extend the
project’s life and increase life-of-mine copper production by more than 20,000 tonnes. The results presented in this report
are not just the result of optimisation, but also an increase in the level of confidence and knowledge of the mineralisation
at Elizabeth Creek.
Coda Minerals CEO, Chris Stevens, commented: “The revised Elizabeth Creek Scoping Study both reinforces and
materially strengthens the already exceptional technical, geographic and economic characteristics of the project.
Through a combination of hard work and increased knowledge of the Project, we now have a pre-tax NPV of over $1.1
billion.
“This next iteration of the Elizabeth Creek Scoping Study has resulted in a significant increase in the underlying value of
the project. This growth has been driven mainly by material improvements to the recoveries of copper and silver in our
1
For details, please see “Appendix 1: ASX Announcements Index”, below.
6 Altona Street
West Perth
Western Australia, 6005
E: info@codaminerals.com
ABN 49 625 763 957
ELIZABETH CREEK SCOPING STUDY
flowsheet. A significant contribution is also anticipated from support under the “Future Made in Australia” bill. This bill
supports downstream manufacturing of critical minerals in Australia. Projects like Elizabeth Creek, which target
production of high-purity cobalt sulphate directly for the battery market, are precisely the kind of projects this bill is
meant to support.
“Since our first estimate of the economics at Elizabeth Creek we have made enormous progress with our technical work
but the world has also changed, and we have taken this opportunity to normalise our macro-economic assumptions with
market forecasts as well as studies released by peers during the past year. We have increased our copper price
assumptions in line with forecasts, although we maintain these at the conservative end of many forecasts. We have
reduced cobalt price assumptions, especially during the first five years of the project’s life to reflect ongoing weakness in
the spot market as well as to align with the latest forecasts from industry specialists.
“The geographic benefits offered by the project’s location in South Australia should not be under-estimated. Given many
recent examples of sovereign and commercial risk causing major problems for copper and gold projects, we are incredibly
fortunate to be located in South Australia.
“We are pleased that the work undertaken since our last update in March 2024 has paid off with such an impressive
result in this updated Scoping Study. With metallurgical test work concluded for now, the next big lever we can pull at
Elizabeth Creek is to increase tonnes. Drill rigs will be turning in early 2025, with targets including both extensions to the
high-grade underground mineralisation at Emmie Bluff and potential new open-pit deposits at Oakden.”
This announcement has been approved for release by the board of Coda Minerals Ltd.
Please see the full text of the public Study release below.
Further Information:
Chris Stevens
Chief Executive Officer
Coda Minerals Limited
info@codaminerals.com
6 Altona Street
West Perth
Western Australia, 6005
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
E: info@codaminerals.com
ABN 49 625 763 957
1 | PAGE
Table of Contents
Cautionary Statements ............................................................................................................................ 5
Forward Looking Statements ................................................................................................................... 6
Metal Equivalents ..................................................................................................................................... 7
Elizabeth Creek Copper-Cobalt Scoping Study ......................................................................................... 8
Key Study Findings ................................................................................................................................... 9
Introduction ............................................................................................................................................ 10
Executive Summary of Findings ........................................................................................................... 11
Key Consultants ............................................................................................................................... 14
Key Risks and Sensitivity Analysis .................................................................................................... 14
Next Steps And Project Timeline ...................................................................................................... 15
Copper Market ................................................................................................................................. 17
Cobalt Market ................................................................................................................................... 18
Project Description ................................................................................................................................ 20
Location and Layout ............................................................................................................................ 21
Geology and Resources ....................................................................................................................... 22
Mineralisation ................................................................................................................................. 22
Mineral Resources Competent Persons’ Statements ....................................................................... 26
Mining .................................................................................................................................................... 27
Open Pit Mining ................................................................................................................................... 28
MG14 and Windabout ....................................................................................................................... 28
Cattle Grid South ............................................................................................................................. 29
Proposed Mining Methodology......................................................................................................... 30
Underground Mining ........................................................................................................................... 32
Geotechnical Considerations .......................................................................................................... 32
Cut-Off Grade Selection and Stope Optimisation ............................................................................. 33
Mine Design and Scheduling ............................................................................................................ 34
Pillar Recovery ................................................................................................................................ 37
Productivity .................................................................................................................................... 39
Equipment Selection – Continuous Mining ....................................................................................... 40
Equipment Selection – Other ........................................................................................................... 43
Production Schedule .......................................................................................................................... 44
Metallurgy and Processing ...................................................................................................................... 47
Mineralogy .......................................................................................................................................... 48
Comminution And Flotation ................................................................................................................ 48
Crushing ......................................................................................................................................... 48
Grinding .......................................................................................................................................... 48
Flotation ......................................................................................................................................... 49
Flotation Concentrate ..................................................................................................................... 49
Downstream Processing ..................................................................................................................... 50
Solvent Extraction/Electrowinning ................................................................................................. 50
2 | PAGE
Zinc And Cobalt ............................................................................................................................... 50
Cyanidation And Silver Recovery ...................................................................................................... 51
Metal Production ............................................................................................................................. 52
Tailings Disposal ............................................................................................................................. 53
Residuals Management ................................................................................................................... 53
Alternate Downstream Processing Options ..................................................................................... 53
Infrastructure......................................................................................................................................... 55
Transport ........................................................................................................................................ 56
Power ............................................................................................................................................. 56
Accommodation ............................................................................................................................. 56
Hydrogeology And Water ................................................................................................................. 56
Approvals and ESG ................................................................................................................................. 58
Environmental Impacts And Management ....................................................................................... 59
Native Title And Heritage ................................................................................................................ 59
Approvals ........................................................................................................................................ 60
Government Approvals Pathway ....................................................................................................... 61
Project Funding and Economics ............................................................................................................. 63
Project Financial Summary ................................................................................................................. 64
Capital Cost Estimate ..................................................................................................................... 64
Operating Cost Estimate ................................................................................................................. 65
Annual Cashflow.............................................................................................................................. 66
NPV Sensitivity Analysis...................................................................................................................... 66
Commodity Price Sensitivity ........................................................................................................... 67
Taxation ............................................................................................................................................. 69
Alternative Product Marketing Model – LOM Concentrate Sales ........................................................... 70
Project Funding ................................................................................................................................... 71
Funding Options – Debt and Equity ................................................................................................... 71
Strategic Partners – Sources of Funding .......................................................................................... 71
Critical Minerals – Australian Government ........................................................................................ 71
Due Diligence and ESG ..................................................................................................................... 71
Board and Management Experience ................................................................................................ 72
Key Upside Opportunities ....................................................................................................................... 73
Critical Minerals Incentives ............................................................................................................. 74
Exploration ..................................................................................................................................... 74
Emmie Deeps.................................................................................................................................. 74
Integration into the Broader Gawler Craton ..................................................................................... 75
Risks and Mitigations.............................................................................................................................. 76
Technical .........................................................................................................................................77
Geotechnical ....................................................................................................................................77
Metallurgical ....................................................................................................................................77
Infrastructure ..................................................................................................................................77
3 | PAGE
Permitting And ESG .........................................................................................................................77
Water Management ......................................................................................................................... 78
Funding And Economics.................................................................................................................. 78
Elizabeth Creek Pre-Feasibility Study ..................................................................................................... 79
Appendix 1: ASX Announcements Index ................................................................................................... 81
Appendix 2: JORC Table 1, Section 4 ....................................................................................................... 82
Appendix 3: Detailed Technical Information and JORC Table 1 .................................................................... 91
Competent Person’s Statements ...................................................................................................... 91
Section 1 Sampling Techniques and Data.......................................................................................... 91
Section 2 Reporting of Exploration Results ..................................................................................... 95
4 | PAGE
CAUTIONARY STATEMENTS
The Scoping Study referred to in this ASX release has been
undertaken for the purpose of initial evaluation of the
potential for development of a series of open pit and
underground mines and a mineral processing facility at the
Elizabeth Creek Copper-Cobalt Project (“ECCCP”, The
“Elizabeth Creek Project” or “Elizabeth Creek”). It is a
preliminary technical and economic study of the potential
viability of the Elizabeth Creek Project. It is based on low level
technical and economic assessments that are not sufficient
to support the estimation of ore reserves. Further
exploration and evaluation work and appropriate studies are
required before Coda will be in a position to estimate any ore
reserves or to provide any assurance of an economic
development case.
The Study is based on the material assumptions outlined
below. These include assumptions about the availability of
funding. While Coda considers all of the material
assumptions to be based on reasonable grounds, there is no
certainty that they will prove to be correct or that the range
of outcomes indicated by the Study will be achieved.
The Scoping Study outcomes, production target and
forecast financial information referred to in the release are
based on low level technical and economic assessments that
are insufficient to support estimation of Ore Reserves.
To achieve the range of outcomes indicated in the Scoping
Study, funding of in the order of $504 million will likely be
required. Investors should note that there is no certainty that
the Company will be able to raise that amount of funding
when needed. It is also possible that such funding may only
be available on terms that may be dilutive to or otherwise
affect the value of Coda Minerals’ existing shares.
It is also possible that Coda could pursue other ‘value
realisation’ strategies such as a sale, partial sale or joint
venture of the project. If it does, this could materially reduce
the Company’s proportionate ownership of the project.
The Company has concluded that it has reasonable grounds
for disclosing a production target which includes an amount
of Inferred Mineral Resources. There is a low level of
geological confidence associated with Inferred Mineral
Resources and there is no certainty that further exploration
work will result in the determination of Indicated Mineral
Resources or that the production target itself will be realised.
Inferred Mineral Resources comprise only approximately
0.03%, 0.03% and 5.42% of the contained metal (copper
equivalent) in the first three years, five years and the
project’s entire operating life respectively. Inferred Mineral
Resources comprise approximately 0.05%, 0.06% and
13.13% of production on a tonnage basis in the first three
5 | PAGE
years, five years and the project’s entire operating life
respectively. The viability of the development scenario
envisaged in the Scoping Study does not depend on the
inclusion of Inferred Mineral Resources.
The Mineral Resources underpinning the production target in
the Study have been prepared by a Competent Person in
accordance with the requirements of Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore
Reserves (JORC Code (2012)). The Competent Person’s
Statements are found in the Geology and Resources section
of the Study.
For full details of the Mineral Resource Estimates for the
Emmie Bluff Resource, including JORC Table 1, please refer
to “Scoping Study Update Delivers Materially Improved
Economics” released to the market on 30th January 2024 and
available to view at https://www.codaminerals.com/wpcontent/uploads/2024/01/20240130_Coda_ASXANN_Scoping-Study-Update-Delivers-Materially-ImprovedEconomics_RELEASE.pdf.
For full details of the Mineral Resource Estimates for the
MG14 and Windabout Resources, including JORC Table 1,
please refer to “Securities Exchange Announcement – Mt
Gunson Copper-Cobalt Project Update”, released to the ASX
on
19
January
2018
and
available
at
https://www.asx.com.au/asxpdf/20180119/pdf/43qxphjd18l
2x0.pdf.
Coda confirms that it is not aware of any new information or
data that materially affects the information included in those
releases. All material assumptions and technical parameters
underpinning the estimates in those announcements
continue to apply and have not materially changed.
This announcement contains forward-looking statements.
Coda Minerals has concluded that it has a reasonable basis
for providing these forward-looking statements and believes
it has a reasonable basis to expect it will be able to fund
development of the Elizabeth Creek Project. However,
several factors could cause actual results or expectations to
differ materially from the results expressed or implied in the
forward-looking statements. Given the uncertainties
involved, investors should not make any investment
decisions based solely of the results of this study.
The Study has been completed to a level of accuracy of +/35% in line with industry standard accuracy for this stage of
development. All dollar figures are presented in Australian
dollars (AUD) except where specifically otherwise indicated.
FORWARD LOOKING STATEMENTS
The Scoping Study referred to in this ASX release contains
‘forward-looking information’ that is based on the Company’s
expectations, estimates and projections as of the date on
which the statements were made. This forward-looking
information includes, among other things, statements with
respect to the Company’s business strategy, plans,
development, objectives, performance, outlook, growth,
cash flow, projections, targets and expectations, mineral
reserves and resources, results of exploration and related
expenses. Generally, this forward-looking information can be
identified by the use of forward-looking terminology such as
‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘potential’, ‘likely’,
6 | PAGE
‘believe’, ‘estimate’, ‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’,
‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’, ‘evolve’ and similar
expressions. Persons reading this announcement are
cautioned that such statements are only predictions, and
that the Company’s actual future results or performance may
be materially different. Forward-looking information is
subject to known and unknown risks, uncertainties and other
factors that may cause the Company’s actual results, level of
activity, performance, or achievements to be materially
different from those expressed or implied by such forwardlooking information.
METAL EQUIVALENTS
Metal Equivalent grades are quoted for one or more of the Emmie Bluff, Windabout and MG14 Mineral Resources, or for exploration
results considered by the company to be related directly to one of these Mineral Resources, in this announcement.
FOR THE EMMIE BLUFF MINERAL RESOURCE:
The Emmie Bluff Mineral Resource is reported as 40.2Mt @ 1.27% copper, 569ppm cobalt, 17g/t silver and 0.17% zinc (1.87% Copper
Equivalent (CuEq)) reported at a cut-off grade of 1% CuEq. The calculation of this metal equivalent is based on the following
assumptions.
METAL
COEFFICIENT
FORECAST PRICE
PRICE UNIT
Cu
0.8
$7,000
USD/Tonne
Co
0.85
$55,000
USD/Tonne
Zn
0.9
$2,100
USD/Tonne
Ag
0.85
$18.50
USD/Oz
Price assumptions used when calculating copper equivalent grades were based primarily on Consensus Economics forecasts of
metals, except for Cobalt, which was sourced via communication with subject matter experts. Metallurgical assumptions used when
calculating copper equivalent grades were based on a simple bulk float utilising rougher and minimal cleaner/scavenger circuits. The
produced a reasonably consistent mean recovery across most metals of between approximately 83 and 94 percent. For simplicity,
and to in part account for losses associated with less intensive cleaner floats and losses to the hydromet plant, these figures were
rounded down to the nearest 5%.
Application of these assumptions resulted in the following calculation of CuEq:
𝐶𝐶𝐶𝐶𝐶𝐶𝐶𝐶% = 𝐶𝐶𝐶𝐶% + 0.00068 × 𝐶𝐶𝐶𝐶 𝑝𝑝𝑝𝑝𝑝𝑝 + 0.337 × 𝑍𝑍𝑍𝑍 % + 90.3 ×
FOR THE WINDABOUT AND MG14 MINERAL RESOURCE:
The Windabout and MG14 Mineral Resource are reported at a cut-off grade of 0.5% CuEq as:
𝐴𝐴𝐴𝐴 𝑝𝑝𝑝𝑝𝑝𝑝
10000
WINDABOUT: 17.67Mt @ 0.77% Cu, 492 ppm Co and 8 g/t Ag (1.41% CuEq)
MG14: 1.83Mt @ 1.24% Cu, 334 ppm Co and 14 g/t Ag (1.84% CuEq)
The calculation of this metal equivalent is based on the following assumptions.
METAL
MINING
Share your feedback
Discover