Annual Report
Released
Released
Announcement PDF
ANNUAL
REPORT
2024
1
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
TABLE
OF
CONTENTS
02
LETTER FROM THE CHAIR
04
CEO’S REPORT
06
OPERATIONAL REVIEW
20
DIRECTORS’ REPORT
40
AUDITOR’S INDEPENDENCE DECLARATION
42
INDEPENDENT AUDITOR’S REPORT
48
DIRECTORS’ DECLARATION
50
CONSOLIDATED STATEMENT OF PROFIT OR LOSS
AND OTHER COMPREHENSIVE INCOME
51
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
52
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
53
CONSOLIDATED STATEMENT OF CASH FLOWS
54
CONSOLIDATED NOTES TO THE FINANCIAL STATEMENT
87
CONSOLIDATED ENTITY DISCLOSURE STATEMENT
88
ASX ADDITIONAL INFORMATION
95
CORPORATE DIRECTORY
1
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
LET TER FROM THE CHAIR
Dear Shareholders,
I am pleased to present Coda Mineral’s 2024 Annual Report and to reflect on another year of progress for our flagship
assets at Elizabeth Creek.
Elizabeth Creek is one of Australia’s largest undeveloped copper resources. During the year, our exploration, improved
processing and technical studies and mine plans have added significantly to the project.
We have also expanded our copper-gold exploration portfolio with the Kinloch Project in South Australia, which covers
over 3,000 km² held jointly with Boss Energy.
ELIZABETH CREEK SCOPING STUDY
The publication of the first Elizabeth Creek Copper Project Scoping Study in 20231 marked a huge milestone for the
Company and since publication of the original study, we have significantly improved the net present value (NPV) of the
project by over 45%. The most recently published numbers show an estimated NPV8 of $826m and an Internal Rate of
Return of 31%.
We are currently prioritising improvements in processing and copper recoveries. Initial results indicate we can achieve
significantly better recoveries2 than those from our previous scoping study, which would enhance returns without
substantial increases in capital or operating costs.
We expect to release an updated Study in Q4 of 2024 incorporating results from our metallurgical work, the new Cattle
Grid South deposit, and updated macro-economic assumptions.
VALUE CREATION THROUGH EXPLORATION
We announced a maiden Mineral Resource Estimate for Cattle Grid South3 during FY24, continuing Coda’s ongoing
commitment to value improvement through exploration.
We continue to focus on adding to the copper-cobalt Resources at Elizabeth Creek including the addition of a new
tenement “Oakden” which lies adjacent to the southern boundary of Elizabeth Creek.
Exploration work has also revealed that the Emmie Bluff resource likely extends to the east4, offering additional growth
opportunities. The current study outlines a 14 year production plan, and increasing our mineable copper resource would
enhance mine life and overall value.
Emmie Deeps (IOCG) provides potential for a total rerate of the Company. While drilling costs are high, successful
exploration with an appropriate partner could extend the life of Emmie Bluff or position Emmie Deeps as a primary asset.
In late 2023, we acquired more than 3,000km2 of prime exploration ground at Kinloch in South Australia5. This ground is
jointly held with Boss Energy which is expected to materially reduce administration costs and allow more dollars to be
spent in the ground.
I believe that by exploration, we can increase the total amount of copper Resources that can feed into infrastructure
at Elizabeth Creek and to create a South Australian copper powerhouse able to capitalise on the projected increase in
copper demand.
1. 2023.03.23 - Elizabeth Creek Copper-Cobalt Project Scoping Study
2. 2024.08.20 - Next-Stage Metallurgical Testwork Confirms Recovery Uplift
3. 2024.07.03 - Initial Copper Resource for Cattle Grid South
4. 2024.02.13 - Mt Data Reinforces Evidence for Emmie Bluff Extension
5. 2023.10.03 - Coda Strengthens Regional Exploration Pipeline
02
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
LET TER FROM THE CHAIR
CONCLUSION
As we enter the final quarter of 2024, we continue to build on the foundation of excellent assets. The recent Rights Issue
will provide balance sheet strength to allow for more exploration and ongoing optimisation at Elizabeth Creek.
The trends that continue to shape our world have not changed despite the macro-economic and geopolitical forces that
have prevailed during the previous financial year. The world continues to demand more copper for electrification at the
same time as forecasts point to increasing supply deficit in the medium and longer term.
In conclusion, I thank you, our valued shareholders, my fellow board members, our CEO Chris Stevens and the team at
Coda as well as our many advisers who have provided excellent support and guidance over the past year.
Keith Jones
Chair
Coda Minerals Ltd
03
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
CEO’S
REPORT
04
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
CEO ’S REPORT
I am pleased to look forward to the 2025 Financial Year, which we started in a strong position with the announcement of a
pathway to enhanced metallurgical recoveries at Elizabeth Creek.
Our focus is on the two key levers for value improvement at Elizabeth Creek; metallurgical recovery enhancement and
additional tonnage through exploration.
Our primary task during the first half of the financial year is to finalise the recently announced metallurgical testwork and
update the Scoping Study. The update is expected to include these new metallurgical results, the addition of Cattle Grid
South, and other value improvements across the asset portfolio.
The addition of Cattle Grid South demonstrates our ongoing focus on exploration as a key value driver at Elizabeth Creek.
We have now commenced target generation on areas close to MG14 and Windabout, including our new Oakden Tenement
as well as targets to the east of Emmie Bluff.
In late 2023, we also added over 3,000km2 of tenure at Kinloch. This ground, which comprises an area approximately four
times that of Elizabeth Creek is vastly underexplored and offers both the potential for major discovery and the addition of
more tonnes that may be processed at Elizabeth Creek. We have already commenced early stage access and community
engagement work with target generation expected to commence in Q4 2024.
We also continue to advance approvals work at Elizabeth Creek; we know from discussions with potential funders that
the approvals status is key to being able to credibly advance a project. We made huge strides forward in FY24 and will
continue to build on this in FY25.
The recently announced rights issue will greatly strengthen our balance sheet and provide funds for additional exploration
and ongoing economic and technical study work.
Coda’s development and exploration assets position us very strongly to take advantage of forecast copper demand.
Chris Stevens
CEO
Coda Minerals Ltd
05
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
OPERATIONAL
OVERVIEW
06
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
OPERATIONAL OVERVIE W
CODA MINERALS LIMITED (ASX: COD) is focused on the discovery and development of minerals that are leveraged to
the global energy transformation through electrification and the adoption of renewable energy technologies.
Coda’s flagship asset is the 100%-owned Elizabeth Creek Copper-Cobalt Project, located in the world-class Olympic
Copper Province in the Eastern Gawler Craton, South Australia’s most productive copper belt. Elizabeth Creek is centred
100km south of BHP’s Olympic Dam copper-gold-uranium mine, 15km from its new Oak Dam West Project and 50km west
of its Carrapateena copper-gold project.
07
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
ELIZABETH CREEK PROJECT
ELIZABETH CREEK PROJECT
The Elizabeth Creek project consists of 4 tenements, EL6265, EL6518, EL6141 and the recently acquired EL6945, granted
in May 2024, covering a total area of 774sq km. The tenure hosts three distinct mineralisation styles, the ZambianStyle Copper Cobalt Mineralisation, the Iron Oxide Copper Gold (IOCG) mineralisation and the Cattle Grid copper breccia
mineralisation.
EMMIE BLUFF
FLAGSHIP
Zambian Style
Underground Deposit
~ 400m depth
TOTAL AREA
774km²
EMMIE DEEPS
Iron Oxide Copper Gold (IOCG)
Underground Deposit
~ 800m depth
EL 6265
EL 6518
WINDABOUT
Zambian Style
Open Pit Deposit
~ 50 - 70m depth
MG14
Zambian Style
Open Pit Deposit
~ 20m depth
EL 6141
EL 6945
CATTLE GRID
SOUTH
Cu Breccia
Open Pit Deposit
~ 30m depth
The Projects hosts four JORC 2012 Mineral Resources across the tenure, including the most recently release Mineral
Resource Estimate for Cattle Grid South completed subsequent to the end of the Financial Year. In July 2024, a maiden
Mineral Resource was completed for the Cattle Grid South open pit deposit, adding 5.8Mt at 0.62% Cu for approximately
36,000t of contained copper to the Elizabeth Creek Project1.
In total, the Elizabeth Creek project hosts over 1 million tonnes of contained copper equivalent in JORC 2012
defined Resource.
1. 2023.07.03 - Initial Copper Resource for Cattle Grid South
08
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
ELIZABETH CREEK PROJECT
2012 JORC MINERAL RESOURCE
RESOURCE
CONFIDENCE
CUTTOFF
Mt
Cu
(%)
Co
(%ppm)
Ag
(g/t)
CuEq
(%)
CuEq
Contained
Metal
(kt)
Cattle Grid South
Inferred
0.2%
Cu
5.8
0.6%
121
4
N/A
36*
MG14
Indicated
0.5%
CuEq
1.8
1.2%
334
14
1.67%
31
Windabout
Indicated
0.5%
CuEq
17.7
0.8%
492
8
1.41%
249
Emmie Bluff
93% Indicated,
7% Inferred
1.0%
CuEq
40.2
1.3%
569
17
1.87%
751
1.63
1,067
TOTAL
65.5
* Contained Cu tonnes only
SCOPING STUDY
A Scoping Study into the development of the three Zambian-Style deposits, MG14, Windabout and Emmie Bluff, was first
released in March 20232. The initial Scoping Study demonstrated an economically robust project with a 14 year mine
life, capable of producing 25,000 tonnes of copper and 1,000 tonnes of cobalt at steady state production levels with an
average AISC USD $2.19/lb of Cu (after by-product credits) and an approximate pre-tax NPV8 of $570.
During the financial year, the Company focused on optimising the Study further, completing two significant Scoping
Study Updates released in January3 and March 2024 4.
The most significant change in the first update to the Scoping Study was the conversion from a conventional drill and
blast underground mining methodology utilising long-hole open stope techniques at Emmie Bluff to a mechanical
cutting mining methodology utilising continuous miners. Undertaking this conversion required a re-estimation of the
Emmie Bluff Mineral Resource5 and an increase in processing throughput from 2.5 Mtpa to 3 Mtpa to align with the higher
productivity of mechanical cutting. Additional changes included optimisation of flotation reagents and the transition from
purchased limestone to on-site mined dolomite for acid neutralisation.
The March 2024 Update to the Scoping Study focussed on pillar recovery, introducing grout pack support to increase
extraction percentage at the Emmie Bluff deposit, resulting in an increased total extracted tonnes and copper production
over a 14-year project life. The update also optimised the underground mining schedule, bringing forward extraction of
higher-grade tonnes for improved early revenues.
These improvements to the Scoping Study resulted in an overall 45% increase in the pre-tax NPV to the original Scoping
Study, from $570 to $826, a 4% increase to the IRR, 26% to 31% and a reduction in the ASIC costs from $2.14 to $1.73. The
key economic assumptions underpinning the project remain unchanged from the original study. A summary of the major
changes to the study is detailed in Table 1 and a summary of the financial changes is detailed in Table 2.
2. 2023.03.23 - Elizabeth Creek Copper-Cobalt Project Scoping Study
3. 2024.01.30 - Scoping Study Update Delivers Materially Improved Economics
4. 2024.03.14 - Further Key Improvement in Underground Project Economics
5. 2024.01.30 - Scoping Study Update Delivers Materially Improved Economics
- For full details, see Appendix 1 – Section Mineral Resource Update – Detailed Information
09
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
ELIZABETH CREEK PROJECT
Table 1: Updated Scoping Study (January 2024) and Updated Scoping Study (March 2024) key project changes
STUDY SECTION
SCOPING STUDY
(MARCH 2023)
UPDATED SCOPING
STUDY
(JANUARY 2024)
UPDATED SCOPING
STUDY
(MARCH 2024)
Tenements
EL6518 (MG14 & Windabout),
EL6265 (Emmie Bluff)
No Change
No Change
Mineralisation
Zambian-style sediment-hosted
copper-cobalt mineralisation
No Change
No Change
Mineral Resource
MG14: 1.83Mt @ 1.24%Cu, 0.03%Co
Windabout: 17.67Mt @ 0.77
Cu, 0.05%Co
Emmie Bluff: 43Mt @ 1.30
Cu, 0.05%Co
(of which 92% is in indicated,
8% inferred)
MG14: No Change
Windabout: No Change
Emmie Bluff: 40.2Mt
@ 1.27%Cu, 0.06%Co
(of which 93% in indicated,
7% inferred)
MG14: No Change
Windabout: No Change
Emmie Bluff: No Change
Mining Method
MG14 & Windabout: Open Pit
Emmie Bluff: Underground,
long-hole open stope
MG14 & Windabout:
No Change
Emmie Bluff: Underground,
mechanical cutting
MG14 & Windabout:
No Change
Emmie Bluff: Underground,
mechanical cutting with
pillar recovery
Operating Structure
MG14 & Windabout:
Contract Mining
Emmie Bluff: Contract Mining
Processing Plant:
Owner Operated
MG14 & Windabout:
No Change
Emmie Bluff: Partial
Contract Mining, Partial
Owner-Operated
Processing Plant: Majority
Owner Operated, O2 Plant
converted to a Build Own
Operated (BOO) model
MG14 & Windabout:
No Change
Emmie Bluff: No Change
Processing Plant:
No Change
Processing
2.5Mtpa Throughput
3Mtpa Throughput
No Change
Products
MG14: Copper Concentrate
Windabout & Emmie Bluff: Copper Cathode, Cobalt Sulphate, Zinc
Carbonate & Silver Dore
No Change
No Change
Mineral Processing
Stage 1: Flotation
All ore will undergo primary
crushing followed by grinding in
a SAG mill with a pebble crushing
circuit. Crushed ore from MG14 and
Windabout will pass through an
additional deslime circuit before
flowing through a conventional
rough-cleaner-scavenger flotation
circuit to produce a copper cobalt
concentrate.
Stage 2: Hydromet
The concentrates from
Windabout and Emmie Bluff will
then proceed to a downstream
hydrometallurgical processing
plant based on an Albion Process™
leach circuit. The overflow liquor,
containing copper, cobalt, and
zinc, will be directed to an SXEW
plant, followed by a Cobalt SX and
Zinc precipitation circuit. The CCD
discharge slurry, containing silver,
will be processed through a lime
boil and cyanidation circuit.
Stage 1: Flotation
Optimised reagent consumption:
- 50% reduction in Cyquest
- 40% reduction in PAX
Stage 2: Hydromet
Locally mined dolomite
replaces purchased limestone reducing cost for acid
neutralisation
Stage 1: Flotation
No Change
Stage 2: Hydromet
No Change
10
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
ELIZABETH CREEK PROJECT
STUDY SECTION
SCOPING STUDY
(MARCH 2023)
UPDATED SCOPING
STUDY
(JANUARY 2024)
UPDATED SCOPING
STUDY
(MARCH 2024)
Copper Flotation
Recovery
MG14: 57.93%
Windabout: 66.5%
Emmie Bluff: 77.2%
No Change
No Change
Production
Copper: 317.3 kt
Cobalt: 14.4 kt
Silver: 8.5 Moz
Zinc: 38.2 kt
Copper: 307.2 kt
Cobalt: 16.9 kt
Silver: 13.0 Moz
Zinc: 49.1 kt
Copper: 337.0 kt
Cobalt: 18.4 kt
Silver: 14.3 Moz
Zinc: 54.2 kt
Tailings
Conventional tailings slurry
method located 1km away within a
basin below the processing plant
at Emmie Bluff.
No Change
Partial redirection of
tails to grout plant to be
constructed at Emmie
Bluff. Tails to be mixed
with cement and pumped
underground to fill grout
bags.
Scope to investigate larger
scale underground tails
backfill to reduce surface
footprint and associated
environmental impact of
tailings storage.
Power
Access grid power via existing Mt
Gunson substation located approximately 9.5km south southwest of
Windabout deposit.
No Change
No Change
Water
12 hole borefield
No Change
No Change
11
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
ELIZABETH CREEK PROJECT
Table 2: Scoping Study (March 2023), Scoping Study Updated (January 2024) and Scoping Study (March 2024)
Financial Summary Changes
Original Scoping Study
March 2023A
Scoping Study Update 1
January 2024B
Scoping Study Update 2
March 2024
1000
900
826
735
700
600
570
500
400
IRR: 27%
Revenue(A$M): $6,000
AISCC (USD/lb Cu): $1.60
NPV: CAPEXG: 2.40
IRR: 31%
Revenue(A$M): $6,700
AISCC (USD/lb Cu): $1.73
NPV: CAPEXG: 2.70
SCOPING STUDY
UPDATE 1
JANUARY 2023
SCOPING STUDY
UPDATE 2
MARCH 2024
UNIT
Mine Life
Years
14
13
14
Ore Process Rate
Mtpa
2.5
3
3
Feed from Indicated
Resource
%
94%
96%
96%
Feed from Inferred
Resource
%
6%
4%
4%
Copper-Steady State
AverageD
Kt
24.9
25.4
25.7
Cobalt-Steady State
AverageD
Kt
1.0
1.3
1.3
Pre-Production Capital
A$M
277
306
306
Net Cash Flow (Pre-Tax)
A$M
1,298
1,674
1,755
Capital PaybackF
Years
4.75
4.50
4.25
Net Present Value (NPV8) Post-Tax
A$M
340
446
509
PRODUCTION
MEASURE
ORIGINAL
SCOPING STUDY
MARCH 2023
CAPITAL
300
IRR: 27%
Revenue(A$M): $5,700
AISCC (USD/lb Cu): $2.19
NPV: CAPEXG: 2.06
FINANCIALSE
Net Present Value8 Pre-Tax (A$M)
800
A. For full details, see “Elizabeth Creek Copper-Cobalt Project Positive Scoping Study”, released to market on 23 March 2023 and available at
https://www.codaminerals.com/wp-content/uploads/2023/03/20230323_COD_ASX-ANN_Elizabeth-Creek-Scoping-Study_VRelease.pdf
B. For full details, see “Scoping Study Update Delivers Materially Improved Economics”, released to market on 30 January 2024 and available
at https://www.codaminerals.com/wp-content/uploads/2024/01/20240130_Coda_ASX-ANN_Scoping-Study-Update-Delivers-MateriallyImproved-Economics_RELEASE.pdf
C. All-In Sustaining Cost (AISC) includes all mining, processing, tailings management, transport including freight, sustaining capital, royalties
& G&A costs
D. Steady State average is calculated from year 5 to year 14
E. Including royalties
F. Capital payback is calculated from first production
G. NPV(Pre-tax):CAPEX(Total)
12
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
ELIZABETH CREEK PROJECT
NEXT STEPS – SCOPING STUDY (SHORT-TERM CATALYSTS)
Coda is currently progressing several work streams that will form the foundation of a significant new update to the
Elizabeth Creek Scoping Study, expected in the December 2024 quarter.
In June 20241, a proof-of-concept metallurgical program using novel oxide collectors demonstrated up to a 12% increase
in copper recoveries during the rougher flotation stage for the Windabout deposit. A large-scale metallurgical test work
is now underway to confirm these improvements. The current focus is to replicate the results using site water, followed
by further testing to evaluate the impact of de-sliming, multi-stage grinding, and variations in the specific oxide
collectors used.
This will be followed by a transition from rougher to cleaner concentrates, which will provide detailed data for the
proposed updated Scoping Study. Additional variability testing will also be conducted, along with testing the updated
flowsheet on samples from MG14 and Emmie Bluff.
Following the completion of the Maiden Resource Estimate at Cattle Grid South in July 20232, Coda initiated a mining
study to integrate this deposit into the Elizabeth Creek Scoping Study. The inclusion of Cattle Grid South is expected to fit
into Stage 1 of the Project, which focusses on concentrate sales.
On the approvals front, Coda submitted a Preliminary Impact Assessment (PIA) for its flagship Elizabeth Creek CopperCobalt Project on August 12, 2024 3, officially committing the company to the South Australian approvals scoping process.
This marks the first step toward securing a Mining Lease and, ultimately, moving into operations and production at
Elizabeth Creek.
The PIA submission initiates a review and consultation process with various South Australian government departments.
This process will involve multiple drafts before finalising and publishing a Scoping Report, which is expected to feed into
the updated Scoping Study.
1. 2024.06.18 - Flotation Success Delivers Pathway to Improved Recoveries
2. 2024.07.03 - Initial Copper Resource for Cattle Grid South
3. 2024.08.12 - Elizabeth Creek Approvals Process Commences
13
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
ELIZABETH CREEK PROJECT
EXPLORATION – SED-HOSTED
Exploration during the year focussed on geophysics, both the collection of new data and the reinterpretation of old. A
major ground magnetotelluric (MT) survey was undertaken at Emmie Bluff, extending historical surveys to the highly
prospective eastern side of the Emmie Bluff Mineral Resource, roughly doubling the area of EL 6265 covered by this
form of survey. The results showed strong anomalism consistent with the signature of the mineral resource to the east,
strongly supporting the hypothesis of a repeat of secondary basin in the area, which is now a high priority exploration
target for Coda1.
1. 2024.02.13 - Mt Data Reinforces Evidence for Emmie Bluff Extension
14
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
ELIZABETH CREEK PROJECT
EXPLORATION - IOCG
In 2021, a major IOCG was discovered adjacent to and below the Emmie Bluff tenement. Coda completed 23,000m of
drilling with 21 drillholes into the Emmie Deeps, with all but three intersecting mineralisation.
A major project completed during the financial year was an integrated geophysical review covering the Emmie Deeps IOCG
target undertaken with the assistance of Mira Geoscience. The review resulted in a comprehensive model of the IOCG
system, including a substantial 2.5km long corridor of untested ground bookended by ore grade intercepts. Perhaps more
importantly however, the work provided a consistent geological framework which will drive targeting going forward.
BHP
CODA MINERALS
100%
EMMIE BLUFF
IOCG TARGET AREA
EMMIE DEEPS
15
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
OTHER PROJECTS
CAMERON RIVER
Coda consolidated 100% ownership of the Cameron River Project in Queensland in February 2024. Wilgus retains the right
to a 1% NSR payable on any mineral products mined from the tenure on terms customary for this form of transaction.
KINLOCH JV (ELs 6962, 6963, 6964 and 6965)
In October 2023, Coda was granted four highly prospective tenements known collectively as the Kinloch project in eastern
South Australia1 in a joint ownership with Boss Energy Ltd. Coda holds 25% of the tenure, with the intention that Coda will
hold 100% of the base metals rights and Boss will hold 100% of uranium rights.
Coda is in continued negotiations with Boss around the detail of the formal JV agreement. Boss, as principal operator and
majority owner of the tenure, has commenced early-stage land access negotiations to facilitate exploration on the tenure.
BOOLEROO (EL 6917)
Coda pegged the Booleroo tenure, centred approximately 5km ENE of Wilmington in South Australia, in 2023 based on
potential structural associations with nearby historical sediment-hosted copper deposits. Over the course of the past
financial year, Coda has undertaken a detailed review of available historical data and undertook field visits to assess
prospectivity. While some very limited copper prospectivity has been determined, the scale of potential discoveries is not
considered commensurate with the cost and effort required to explore the ground, particularly given access challenges
which were made apparent by relevant local landholders and other significant stakeholders.
After review, Coda considers that existing targets and broader exploration opportunities identified at the Company’s
flagship Elizabeth Creek Project are significantly more compelling than continued exploration at Booleroo and as a result,
Coda has relinquished the tenement.
CLUB TERRACE
Coda has relinquished the Club Terrace tenements, EL7342, EL7584 and EL9238, in the financial year.
1. 2023.10.03 - Coda Strengthens Regional Exploration Pipeline
16
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
ESG
ESG
During the Financial year, Coda released its maiden Sustainability Report1, which summarises the Company’s approach to
environmental, social and governance matters. This inaugural Sustainability Report set the baseline from which future
sustainability reporting has been expanded on through regular quarterly updates.
Please refer to the 2023 Sustainability Report on the Coda Minerals website for more information on the Company’s ESG
principle and goals.
1. 2023.10.11 - Sustainability Report 2023
17
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
TIMELINE 2023
CODA STRENGTHENS REGIONAL
EXPLORATION PIPELINE
CORPORATE
Coda was granted four highly prospective
tenements, collectively known as the Kinloch
Project, in eastern South Australia, in joint
ownership with Boss Energy Ltd. Coda holds 25%
of the tenure, with the intention that Coda will
hold 100% of the base metals rights, while Boss
will hold 100% of the uranium rights.
OCTOBER 2023
SUSTAINABILITY REPORT 2023
Maiden Sustainability Report released,
summarising the Company’s approach
to environmental, social and governance
matters and Coda’s commitment to high
standards of environmental and social
governance reporting.
OCTOBER 2023
MT SURVEY COMMENCES TARGETING
EMMI BLUFF EXTENSIONS
UNDERGROUND ORE SORTING SUCCESS ENHANCES
EMMIE BLUFF
Geophysical survey commenced to test
highly prospective ground south and east
of the existing Emmie Bluff Resource
for additional extensional basins and
copper-cobalt mineralisation.
Field-based trial of XRF ore sorting technology
demonstrates highly successful outcomes. Rejection of
approximately 15% of low-grade material achieved while
retaining >97% of metal on a CuEq basis for the Emmie
Bluff ore.
JULY 2023
OCTOBER 2023
PROJECT
TEST WORK DELIVERS ELIZABETH CREEK FLOWSHEET
ENHANCEMENTS
Improvement in forecast net copper recovery for the MG14 open
pit deposit from 58% to 85% achieved through the application of
low-cost tails leaching.
SEPTEMBER 2023
UPDATED GEOLOGICAL MODEL TRANSFORMS
IOCG UNDERSTANDING
Geophysics indicates structural corridor controlling
IOCG mineralisation extends up to 2.4km to northern
tenement boundary.
OCTOBER 2023
18
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
TIMELINE 2024
SUCCESSFUL COMPLETION OF
$2.9M PLACEMENT TO SUPPORT
COPPER GROWTH
Coda raised $2.9 million at $0.09 per
share to advance exploration and
feasibility work at its 100% owned
Elizabeth Creek Copper Project.
MARCH 2024
SCOPING STUDY UPDATE DELIVERS MATERIALLY IMPROVED ECONOMICS
Updated Scoping Study released, shifting from a conventional long-hole open stoping with drill and blast to
mechanical cutting with continuous miners underground mining method at Emmie Bluff. This change, along with
a cheaper acid neutralisation option and flotation reagent optimisation, significantly improved project economics
from the original March 2023 Study.
Key Metrics
NPV8 (Pre-Tax): $735,
IRR: 27%,
AISC: US$1.60/lb Cu
JANUARY 2024
FURTHER KEY IMPROVEMENT IN
UNDERGROUND PROJECT ECONOMICS
Second Updated Scoping Study released, incorporating
the application of a cost-effective pillar recovery strategy
at Emmie Bluff, which further improved the project’s economics.
Key Metrics
NPV8 (Pre-Tax): $826,
IRR: 31%,
AISC: US$1.73/lb Cu
MARCH 2024
MT DATA REINFORCES EVIDENCE FOR
EMMIE BLUFF EXTENSION
FLOTATION SUCCESS DELIVERS PATHWAY
TO IMPROVED RECOVERIES
Interpreted results of magnetotelluric extension
survey suggests additional bodies to the east of
Emmie Bluff, further supporting the potential
for additional mineralisation at scale indicated
by pre-existing 2D seismic and ANT data.
Material uplift in rougher flotation stage
recoveries for the Windabout deposit achieved
through the application of novel oxide collectors.
Up to a 12% increase in copper recoveries
demonstrated for the deposit.
FEBRUARY 2024
19
JUNE 2024
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
DIRECTORS’
REPORT
PIC TO CHANGE
20
CODA MINERALS LIMITED AND ITS CONTROLLED ENTITIES ACN 625 7 6 3 957
ANNUAL REPORT AND FINANCIAL STATEMENTS 2024
DIRECTORS ’ REPORT
FOR THE YEAR ENDED 30 JUNE 2024
The directors of Coda Minerals Ltd (‘the Company’ or ‘Coda’) present their report together with the financial statements of
the Company and its Subsidiaries (‘the Group’) for the financial year ended 30 June 2024 and the Auditor’s Report thereon.
In order to comply with the provisions of the Corporations Act 2001, the Directors’ report is as follows:
DIRECTORS
The directors of the Company at any time during or since the end of the financial year were:
NAME & QUALIFICAT
Share your feedback
Discover